Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Rock Mass Characterisation and Analysis for Excavation Design – A Discrete Fracture Network Approach

    By F M. Weir, M Fowler

    The design of excavations in rock must, implicitly or explicitly take into consideration the influence of small- and large-scale geological structures. For most sites the complexity of a fractured roc

    Nov 5, 2014

  • AUSIMM
    Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushers

    By J V. Mehrabani, A R. Sayadi

    Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul

    Sep 26, 2011

  • AUSIMM
    Directional Blasting Rock Cutting Technology

    By W Z. Liu, Q Q. Shi, H T. Yang, X L. Zhang

    In order to improve the cutting blasting effect of dimension stone mining, the water coupling directional cutting blasting technology was put forward. Based on the test apparatus and special charge co

    Aug 24, 2015

  • AUSIMM
    Designing Flotation Cells For Optimised Flow Dynamics

    By T Niitti, J Turunen, P B, A Rinne

    In todayÆs marketplace, with high metals prices, many operations are faced with the challenge of improving recovery in the particle size ranges which are normally difficult to recover. This presentati

    Jan 1, 2006

  • AUSIMM
    Firedamp Drainage Installations

    Firedamp drainage has become an essential part of many mine environmental systems, and new applications are arising. Installations are evolving further to satisfy ever changing basic requirements,

    Jan 1, 1982

  • AUSIMM
    Increasing Production Control Through Reliable Geological Predictive Techniques

    By English W, Poppit I

    COALEX Pry Limited operates two underground steaming coal mines on the western edge of the Sydney Basin near Lithgow, New South Wales. Baal Bone Colliery uses longwall technology for an output of over

    Jan 1, 1991

  • AUSIMM
    Carburisation and melting of hot compacted iron in a coke bed

    By M Kim, J Park, I-K Suh, E Kim, J Lee

    One of the key technologies in developing hydrogen-enriched ironmaking operations is the control of the carburisation, melting, and dripping behaviour of the iron ore burden materials. When a hot comp

    Aug 21, 2024

  • AUSIMM
    Re-defining Compliance Planning through data integration and ultra-short-term scheduling

    By C Fong

    Compliance Planning is an active approach to ensure mining operations align more closely to their longer-term plans. Through Compliance Planning, operations can not only measure their performance on i

    Jun 22, 2022

  • AUSIMM
    A Capitals Based Approach – Leading Innovation in Planning for Life-of-Mine Sustainability

    By L Dyer, A Keith, G D. Corder

    As mining activity moves to remote and less developed locations globally, a holistic approach to mine development is fundamental for achieving a balance between strong financial returns and corporate

    Jul 16, 2014

  • AUSIMM
    Characterising Cobalt Losses for Improved Recoveries

    By I Lumsdaine

    QNI Pty Ltd operates the Yabulu Refinery located 25 kilometres north of Townsville, North Queensland. The plant treats nickel laterite ores sourced from the Philippines, Indonesia and New Caledonia. T

    Jan 1, 2002

  • AUSIMM
    The Application of Advanced Undercutting at PT Freeport IndonesiaÆs Deep Ore Zone Mine

    By A Sinuhaji, R Poedjono, G Flumerfelt

    PT Freeport Indonesia is currently building the DOZ mine. It is a 25 000 tonne/day block caving operation which is scheduled to reach designed production levels by the fourth quarter of 2002. This pap

    Jan 1, 2002

  • AUSIMM
    Needed New Technologies for the Development of Earth Resources: Energy, Water, Wastes, Mining (fb564f69-f9d2-4e41-b882-2e207532a0de)

    Our ultimate resources come from the Sun and the Earth System. At this time we face a world crisis in energy, water and soil resources. Global pollution problems are increasing in almost all nations.

    Jan 1, 1995

  • AUSIMM
    The Direct Outokumpu Nickel Smelting (DON) Process and the Harjavalta Expansion

    By MattelmSki M

    Outokumpu Harjavalta Metals Oy has been producing nickel since 1962, based on conventional flash smelting technology followed by electrowinning of nickel. In the 1980s, a research project was initia

    Jan 1, 1996

  • AUSIMM
    The Role of the Metallurgist in Project Development

    The role of a project metallurgist is diverse and covers input into the resource definition, mining studies, metallurgical test program development, process engineering and plant design, cost estimate

    Jan 1, 2008

  • AUSIMM
    Linking safety factor to probability of failure

    By S M. Gover

    Estimating the probability of failure for embankments is not intuitive. It requires not only an appreciation of the strength of the embankment, but an understanding of the variability and uncertainty

    Jul 23, 2018

  • AUSIMM
    Lessons learnt from six mine disaster case studies to improve audit and assurance and ESG

    By A Atkins

    Six recent case studies were selected based on the eight main causes of mine disasters (Table 1; Quinlan, 2014) and where credible information sources, such as Royal Commission Reports, Coronial Inves

    May 5, 2022

  • AUSIMM
    Mill Liner Evolutions in Recent Times

    A general review of grinding mill steel liner evolutions/developments in recent times. The driving force behind these developments has been the mill operators desire to minimise the nett cost of their

    Jan 1, 2000

  • AUSIMM
    A Historical Perspective of the Application and Success of Geometallurgical Methodologies

    By S R. Williams

    There is a sense of geometallurgy being new; a new methodology for mining project development and improved operational strategy. One of the main challenges that any ænewÆ technology faces is a validat

    Sep 29, 2013

  • AUSIMM
    Using high-efficiency downhole assay to improve the financial performance of open pit copper mining operations

    By H Rossiter, A Maddever, J Market, P Jeanneau, A Virani

    It is generally acknowledged that the head grade of the world’s copper resources is declining. Accordingly, there is an increase in the volume of resource material being mined and processed to maintai

    Nov 10, 2020

  • AUSIMM
    Sunrise Dam Short- to Long-Term Ventilation Planning

    By M Podreka, P Merry, L van den Berg

    Anglo Gold AshantiÆs Sunrise Dam operation is located in Western Australia approximately 55 km south of the town of Laverton. Currently, the mine is producing from both its open pit and underground op

    Jul 1, 2013