    Impacts of Geotechnical Issues on Design of the Beacon Hill Tunnel and Station Project

    By Michael S. Kucker, Stuart Warren, Robert A. Robinson, Michael J. Lehnen, David McAllister

    Geotechnical conditions exposed by the phased exploration programs have had a major impact on the selection of excavation and support methods, dewatering requirements, size of openings, vertical align

    Jan 1, 2005

  • SAIMM
    Role Of Operational Support In Ramp-Up Of The FeNi-II Furnace At Pt Antam In Pomalaa

    By E. J. M. Jahnsen, I. Jauhari, T. Badrujaman, F. A. Stober, B. O. Wasmund, L. R. Nelson, T. Miraza, J. M. A. Geldenhuis, A. Taofik Hidyat

    The role of dedicated operational support in the ramp-up and stabilisation of the FeNi-II furnace for ferro-nickel production at PT Antam?s smelter located in Pomalaa, Indonesia is described. The fur

    Jan 1, 2007

  • SME
    Morenci’s In-pit Crushing and Conveying System

    By William M. Dowall

    The recently completed in-pit crushing and conveying project at Phelps Dodge's Morenci Mine is rated among the world's leading materials handling projects. The operation involves the crushin

    Jan 1, 1993

  • SME
    RockVision3D™ Applications to Delineate Hazardous Geologic and Stress Conditions in Coal Mines—Case Histories

    By K. Y. Haramy, K. Hanna

    Early identification of adverse geologic conditions and high stress concentrations during the high-speed extraction of coal using modern mechanized longwall systems is a major challenge facing the min

    Jan 1, 1999

  • AIME
    The Stock Exchange and Its Relation to the Mining Industry

    By FRABK HERVEY PETTINGELL

    THE stock exchange and its functions is about as well understood by the average individual as the fourth dimension. What is a stock exchange? Divested of the rules and regulations by which it is gover

    Jan 1, 1925

  • ISEE
    Transition of the Seismograph from a Tool of Litigation to a Tool of Production Efficiency

    By David S. Bowling

    The ER-300 Series White Recorders were developed to provide on economical, yet invaluable instrument for those who desire permanent recordings of such data OS displacement, vibration, concussion (air

    Jan 1, 1990

  • SME
    Abstract Page - Fundamental Approaches in Longwall Dust Control

    By R. A. Jankowsi, S. K. Ruggieri

    Airborne respirable dust levels on longwalls can be reduced if operators approach the dust control problem in a logical and fundamental manner. This can be accomplished through the proper application

    Jan 6, 1985

  • NIOSH
    OFR-33-82 Environmental Instrumentation In Mining Air And Water

    By Richard C. Moore

    The U.S. Bureau of Mines contracted a study to review the air and water monitoring requirements of five Federal environmental acts (the Federal Water Pollution Control Act, the Safe Drinking Water Act

    Jan 1, 1981

  • CIM
    Improving Sulphide Recoveries in Complex Gold Ore Bodies Using Cost Effective Pre-Concentration by Gravity

    By Yaw Boadi, Andrew McCallum, Sandy Gray, Yavuz Atasoy, Peter Wemyss

    "Various full-scale test programs and installations of the InLine Pressure Jig (IPJ) have provided evidence that pre-concentration of the difficult to leach sulphide mineral through gravity can provid

    Jan 1, 2004

  • CIM
    Mineralogical Tracing of Metallurgical Results - The Sarcheshmeh Copper Mine Case

    By S. Banisi, H. R. Iran-Manesh, M. R. Shayestefar, H. Shekarchyan

    "Flotation circuit of the Sarcheshmeh copper mine processes 41,000 t/d of ore at 0.9% Cu. Chalcopyrite and chalcocite are the main copper bearing minerals which are concentrated in three stages of rou

    Jan 1, 2003

  • NIOSH
    Development Of New Protocols To Evaluate The Transverse Loading Of Mine Ventilation Stoppings

    By T. J. Batchler, T. M. Barczak

    The Code of Federal Regulations (CFR) requires that the transverse load capacity of stoppings be equal to or greater than traditionally accepted in mine controls, which for block stoppings is generall

  • SME
    Pre-Failure Pillar Yielding

    By J. F. T. Agapito, R. R. Goodrich

    Yield pillars have been used for many years to help reduce stresses near mine openings and improve roof and floor stability. A yield pillar is often defined as a pillar that fails but retains residual

    Jan 1, 2001

  • DFI
    Drilled Pier Foundations In Downtown Seattle - Introduction

    By Thomas M. Gurtowski

    This paper presents a summary of allowable bearing pressures and skin friction values that have been used to design drilled pier foundations for support of high-rise structures in downtown Seattle, Wa

    Jan 1, 1990

  • SME
    Devil?s Slide Tunnels - Unique Challenges

    By Y. Nien Wang

    The Devil?s Slide portion of Highway 1 between Pacifica and Montara is often closed due to the instability of the adjacent slopes. Following many years of public input and careful evaluation of altern

    Jan 1, 2008

  • SAIMM
    Merensky pillar strength formulae based on back-analysis of pillar failures at Impala Platinum - Synopsis

    By B. P. Watson

    The Bushveld platinum group metal deposits are two distinct, shallow-dipping stratiform tabular orebodies and strike for many hundreds of kilometres. Mining is extensive, with depths ranging from clos

    Jan 1, 2008

  • NIOSH
    RI 5235 Estimate Of Known Recoverable Reserves And Preparation Characteristics Of Coking Coal In Fentress County, Tenn. ? Conclusions ? Reserves

    By R. W. Lowe

    1. Reserves are estimated in the Nemo, Sewanee, Wilder, and White Oak beds of Fentress County, Tenn. The Wilder is the only bed being mined commercially and contains the largest known reserves. Eleven

    Jan 1, 1956

  • AUSIMM
    The Electrolytic Refining and Smelting Company of Australia Limited

    Power Plant. The power for the metallurgical operations is supplied by the company's own power plant, which is centrally situated. Power is also supplied to Metal Manufactures Ltd. and Australian

    Jan 1, 1938

  • SME
    The Price Is Right?Planning Large Water Tunnel Contracts In New York

    By Christian Maguire

    Tunnel contracts in New York have in recent years had few bidders with the bids received being much higher than anticipated. Since 9/11, security has become a key issue in planning key infrastructure

  • IIMP
    Plan de minado optimizado con ley de corte variable y stocks dinámicos

    By Edgar A. Peña

    El presente trabajo describe el plan de minado del yacimiento de Cuajone a través de las leyes de corte variable y stock dinámicos con el fin de maximizar el valor presente neto a largo plazo. La estr

    Sep 12, 2011

  • SME
    Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, California

    By Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan

    Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E

    Jan 1, 2007