Search Documents

  • DFI
    Video Inspection Of Rock Sockets For A Piling Project

    By Ali Ameli

    Design loads are limited for piles relying upon toe stresses in rock due to uncertainty about the rock quality over the whole pile diameter because of rock mass properties or construction effects. Th

    Jan 1, 2006

  • AUSIMM
    Effective Mine Planning on a Microcomputer

    Tougher physical mining and processing conditions as well as economic circumstances are causing many mining companies to re-evaluate the effectiveness of their mine planning. The recent wave of ine

    Jan 1, 1989

  • SME-ICGCM
    Geotechnical Mapping By Seismic Imaging In Underground Mines

    By W. J. Mcgaughey

    A crosshole seismic imaging (tomography) experiment has been carried out in an underground mine in order to delineate waste rock within a massive sulphide ore body. Data comprising 1526 travel time me

    Jan 1, 1989

  • TMS
    Characterization of Refractories in Gasification Systems Using Post Mortem Analysis and Thermodynamics

    By Kwong. Kyei-Sing

    Gasification is a process that converts a carbon feedstock into synthesis gas (CO+H2). Slagging gasifiers operate at high temperature and pressure and in a corrosive-wear environment from the slag. Cr

    Jan 1, 2010

  • AIME
    Reservoir Performance - Field Studies - Production of Oil Under Unitization in the Wertz Dome Field, Wyoming

    By E. A. Swedenborg

    The unit agreement for the Wertz Dome field, Wyoming, was approved by the Acting Secretary of the United States Department of the Interior on November 4, 1937, effective on December 1, 1937. The state

    Jan 1, 1949

  • AIME
    Reservoir Performance - Field Studies - Production of Oil Under Unitization in the Wertz Dome Field, Wyoming

    By E. A. Swedenborg

    The unit agreement for the Wertz Dome field, Wyoming, was approved by the Acting Secretary of the United States Department of the Interior on November 4, 1937, effective on December 1, 1937. The state

    Jan 1, 1949

  • AUSIMM
    The exploration history, geology and metallurgy of a High Sulphidation Epithermal gold deposit at Wafi River, Papua New Guinea

    By Lewis PJ, Halfpenny R, Craighead GA

    Exploration drilling by Joint Venture partners CRA Exploration Pty Ltd and Elders Mining PNG Pty Ltd has discovered a signif- icant copper and gold deposit at the Wafi River prospect, 60km WSW of L

    Jan 1, 1991

  • CIM
    Petroleum and Natural Gas Exploration in British Columbia

    By T. B. Williams

    A SEARCH of the records indicates that evidences of accumulations of petroleum and natural gas within the boundaries of British Columbia were discovered at approximately the same time as were those of

    Jan 1, 1951

  • DFI
    The Utilization Of Static-Load Piledriving Near Structures That Are Sensitive To Vibration - Static-Load Piledriving: - Concept;

    By Robert A. Field

    Static-Load Piledriving utilizes a hydraulic push to facilitate the installation of a pile. The pile is not rotated, impacted or vibrated. A smooth pushing force advances the pile incrementally into t

    Jan 1, 1997

  • AIME
    Technical Papers and Notes - Extractive Metallurgy Division - Effect of Roasting on Recovery of Uranium and Vanadium from Carnotite Ores by Carbonate Leaching

    By F. A. Forward, A. H. Ross, J. Halpern

    Application of the carbonate leaching process to carno-tite ores has often been limited by the difficulty of obtaining simultaneous high recoveries of uranium and vanadium. The chemical aspects of thi

    Jan 1, 1959

  • CIM
    An investigation on minimizing reagent consumption in ammonium thiosulphate gold leaching

    By Chen Xia, G. Deschenes, Wan-Tai Yen

    "Ammonium thiosulphate is a potential replacement for the cyanide in gold leaching. However, the high reagent consumption hinders its practical applications. In order to reduce the thiosulphate consum

    Jan 1, 2002

  • ISEE
    Drill Monitoring and GPS Developments and their Impact on the Drill to Mill Process

    By John Vynne

    Too often, a mine’s operations, including drilling, blasting, loading, hauling, crushing, processing, etc., are considered independent steps, rather then a continuous process. In fact, these are inter

    Jan 1, 2001

  • DFI
    Time Dependent Open-End Pipe Pile Capacity Assessment By Dynamic And Quasi-Static Methods

    By Derrick D. Dasenbrock

    Three piers of a new river bridge are supported on 1.067 m diameter open-end steel pipe piles. At time of drive, and after pile re-strikes, high-strain dynamic capacity values at plan tip elevations,

    Jan 1, 2006

  • DFI
    Predication Of Heave For Deep Excavation With Irregular Plane Shape

    By Zhang Jiaju

    For the highrise buildings with deep foundstion of irregular plane shape, an appropriate calculate model to the heave of foundation soil after excavation is proposed and studied using analytic method

    Jan 1, 1991

  • SME
    Case studies illustrate the need for a new concept of coal pillar design

    By Syd S. Peng

    Introduction The most commonly used ground control design in coal mining is the determination of pillar size by various pillar strength formulae for mine layout (Bieniawski, 1983; Holland, 1973; Hust

    Jan 11, 1986

  • AUSIMM
    Upgrading of Iron Ores by Wet High Intensity Magnetic Separation (WHIMS)

    By Misra V. N, Cheng C. Y

    Two types of Mt Tom Price hematite iron ore from Hamersley Iron P/L were tested using a Humboldt Wedag Jones P40 wet high intensity magnetic separator (WHIMS). The parameters tested were magnetic i

    Jan 1, 1999

  • NIOSH
    OFR-38(1)-74 Survey Of Electromagnetic And Seismic Noise Related To Mine Rescue Communications - Volume I - Emergency And Operational Mine Communications ? Introduction

    By Robert L. Lagace

    This final report documents the work done by Arthur D. Little, Inc. (ADL) on behalf of the U.S. Bureau of Mines, Pittsburgh Mining and Safety Research Center (PMSRC), on Contract R0122026 (which began

    Jan 1, 1974

  • RMCMI
    To Our Members

    Remember, the good of the Institute is not limited to the technical papers. The acquaintance and good fellowship, the education and broadening effect of our meetings, can be made a real benefit for us

    Jan 1, 1922

  • AUSIMM
    Some Calculations Dealing with Mine Timber

    ONE of the phases of mining wide ore-bodies, such as are found in Broken Hill, is the laying-out and design of the sill floor gangway timber, When, in the above operation, a detail has to be repeated

    Jan 1, 1923

  • CIM
    Financing From the Perspective of Mining Companies

    By Eric Low

    Raising capital by issuing debt or equity is necessary in almost every corporation. In the field of corporate finance, the raising of capital is a heavily-studied topic. However, some of what is studi

    May 1, 2011