Search Documents

  • SAIMM
    Latest Electrode Technology Delivering Improved Electrode Performance In Submerged Arc Furnaces

    By Henk van der Bijl, Sean Rogers, Eugene Sidorski, Alan Carpenter

    The electrode column is the heart of the submerged arc furnace. Superior electrode performance provides improved furnace performance. This paper describes the main features of the electrode column tha

    Jan 1, 2007

  • SAIMM
    Furnace Upgrade With Hatch Technology At Pt Antam FeNi-II IN Pomalaa, Indonesia

    By I. Jauhari, F. Stober, D. Fowler, B. O. Wasmund, T. Miraza, C. Nichols, A. Taofik Hidyat, K. Said

    The existing PT Aneka Tambang (Antam) ferronickel smelter located at Pomalaa, Indonesia consists of two RKEF lines with reduction furnaces nominally rated at 17 MW and 18 MW, respectively. The low pow

    Jan 1, 2007

  • SME
    Evolution Of RFID Technology In Underground Coal Mines – Preprint 97-181

    By R. Larry Grayson, Ahmet Unal

    Use of radio frequency identification (RFID) technology to solve informational needs in isolated and restricted underground mining environments will be reviewed, giving specifications of some past and

    Feb 24, 1997

  • NIOSH
    Bulletin 190 COAL-MINING PROBLEMS IN THE STATE OF WASHINGTON

    By George Watkin Evans

    The United States Geological Survey has estimated 1 that the State of Washington contains 11,412,000,000 tons of bituminous coal and 52,442,000,000 tons of subbituminous coal, in beds more than 14 inc

    Jan 1, 1924

  • CIM
    The Aurora Super Pump – Part II: Field Performance of a New Hydrotransport Pump

    By D. Wolfe, R. Cleminson

    "The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. The hydrotransport systems at Aurora experience high rates of wear,

    Jan 1, 2014

  • DFI
    Case History Of The Support Of Excavation System At The San Diego State University (SDSU) LRT Station

    By Allan Sylvester

    This paper will discuss the design, construction, and performance of the support of excavation on the San Diego State University LRT Station. The vertical elements of the system include drilled secant

    Jan 1, 2002

  • AIME
    Professional Services (0459e53d-c907-435d-ae7c-7f84bafc7960)

    [RALPH ADAIR Ore Dressing Consultant Bull Mtn. Rd., Asheville, N. C. Phone 4-1693 JAMES A. BARR Consulting Engineer Mt. Pleasant, Tennessee Washington, D.C. BEHRE DOLBEAR & COMPANY Consult

    Jan 1, 1952

  • AIME
    Professional Services (7d53ef68-f651-4621-a60c-e2e7df052e89)

    [RALPH ADAIR Ore Dressing Consultant Bull Mtn. Rd., Asheville, N. C. Phone 4-1693 JAMES A. BARR Consulting Engineer Mt. Pleasant, Tennessee Washington, D.C. BEHRE DOLBEAR & COMPANY Consul

    Jan 1, 1952

  • AIME
    Professional Services (b69eb065-6af5-49fa-972e-bc776c3069c1)

    [RALPH ADAIR Ore Dressing Consultant Bull Mtn. d., Asheville, N. C. Phone 4-1693 JAMES A. BARR Consulting Engineer Mt. Pleasant, Tennessee Washington, D.C. BEHRE DOLBEAR & COMPANY Consult

    Jan 1, 1952

  • AIME
    Professional Services (f1c4a0e7-152b-461c-add4-67b8f747b90d)

    [RALPH ADAIR Ore Dressing Consultant Bull Mtn. Rd., Asheville, N. C. Phone 4-1693 JAMES A. BARR Consulting Engineer Mt. Pleasant, Tennessee Washington, D.C. BEHRE DOLBEAR & COMPANY Consul

    Jan 1, 1952

  • DFI
    Getting Paid In Hard Times - I. Formation Of The Contract

    By Dennis J. Riley

    A. This outline addresses what a sub-contractor, or a subsub-contractor should do to get paid in the event the general contractor or building owner files for bankruptcy. B. Negotiating payment ter

    Jan 1, 1991

  • ISEE
    Mining to Reduce Future Environmental Liabilities

    By Mark A. Williams

    "This paper was originally intended to be a presentation of a case study of two surface bituminouscoal mines in the southern Appalachian coal fields located within five miles of each other. These mine

    Jan 1, 1994

  • CIM
    Arsenic Management and Stabilization

    By K. Lundholm, A. E. Mäkinen

    "Ore grades are declining and getting more complex around the world which not only complicate the ore processing but also produce new type of requirements to manage the produce waste streams. One spec

    Jan 1, 2014

  • TMS
    Blister Flash Smelting - Efficient And Flexible Low-Cost Continuous Copper Process

    By Jukka Tuominen

    The history of making blister copper in an Outokumpu Flash Smelting Furnace dates back to the late 1960?s, when Outokumpu first piloted the Outokumpu Direct Blister (ODB) process. The first commercial

    Jan 1, 2005

  • NIOSH
    RI 3229 Progress Reports-Metallurgical Division. 4. Studies in Direct Production of Iron and Steel from Ore

    By G. R. FITT, S. R. B. Cooke, C. W. Davis, V. H. Gottschalk, C. G. Maier, C. E. Wood, R. S. Dean, S. B. THOMAS, John Gross, E. P. Barrett, T. L. Joseph

    Lack of funds has prevented publication of much of the metallurgical work of the Bureau of Mines during the past 2 years . The present progress report covers studies in the direct production of iron a

    May 1, 1934

  • SME
    Cemented Rock Fill System Design And Application In Leeville Underground Mine

    By C. Sun

    The Leeville underground mine has been in operation since 2006 and currently produces 3,500 tons of ore per day with an average gold grade of 0.34 opt. The mine has a large horizontal extent of 2,500

    Jan 1, 2011

  • CIM
    Process Development at the Raglan Concentrator

    By Joe Holmes, Peter Langlois

    "Falconbridge’s Raglan Concentrator, located at the northern limit of Quebec’s Nunavik Region, has been in operation since December 1997. Originally designed to process 800,000 tonnes per year of high

    Jan 1, 2001

  • ISEE
    Innovative Blasting - Oversize Reduction at the Timbarra Gold Mine in Australia

    By G. Hames, A. Drake, B. Sampson

    The Timbarra opencut gold mine is located about 30 km(19 miles) southeast of Tenterfield in northern NSW some 4 hours by car from Brisbane, the capital city of Queensland in Australia. It was a small

    Jan 1, 2003

  • CIM
    Yield Stress Measurement of Cemented Paste Backfill with the Vane Method and Slump Tests

    By A. S. Moghaddam

    The transportation of cemented and non-cemented mine tailings in the form of paste through pipelines is one of the main stages of paste backfill operations. For the purpose of pipeline design, the rhe

    May 1, 2007

  • AIME
    Discussion of Papers - Application of Size-Distribution Equations to Multi-Event Comminution Processes, The

    By C. C. Harris Discussion by B. K. Loveday

    B. K. Loveday (National Institute for Metallurgy, Johannesburg, Republic of South Africa) - The paper and subsequent technical note' describing a method of determining the parameters of the three

    Jan 1, 1970