Search Documents

  • SAIMM
    Kyoto Carbon Credits

    By H. Immink

    Keywords: Kyoto Protocol, carbon credits, global warming, energy, auditing Climate change is nowadays being taken increasingly seriously, and the link between global warming and the carbon dioxide

    Jan 1, 2006

  • SME-ICGCM
    Numerical Modelling of the Range of Rock Fracture Zone Around Gateroads on the Basis of Underground Measurement Results (edbcb7c0-6a88-4056-904b-d121adf0097c)

    By Andrzej Walentek

    This paper presents the results of numerical modeling of the fractured zone around longwall gateroads. The numerical computations have been based on the results of underground measurements of the frac

    Jan 1, 2009

  • IIMP
    Simulaciones condicionales geoestadísticas aplicada a la clasificación de recursos

    By Mario E. Rossi

    Las simulaciones condicionales geoestadísticas se utilizaron como herramientas de control de leyes en operaciones diarias que evalúan la incertidumbre y el riesgo de las reservas mineras en estudios d

    Jul 17, 2000

  • DFI
    FDOT Method of Independent Separation of Tip and Skin Capacities of Driven Concrete Pile with Embedded Sensors

    By Sastry Putcha, Vamshi Vemula, Aneesh Goly, Kumar Allady

    Current dynamic testing practice to obtain pile total capacity will not yield optimum capacity due to the strain incompatibility between the side and tip resistances during driving. Superposition of e

    Jan 1, 2018

  • CIM
    Novel Method of Assessing Energetic Customer Baselines and Energy Savings in Mining Processes

    By Constantin D. Pitis

    Similarly to notions of constant capital/expenses in business or magnetization power for electric motors an energetic base load (E0) is always necessary to set up a mining process. Denominated as ?n

    Oct 1, 2009

  • SME
    Recovery Of Expanded Polystyrene From Coated Patterns Rejected From Lost Foam Casting (7e824799-4a95-4f4f-bb75-096af0709dc7)

    By J. Drelich, J. Pletka

    Lost foam casting patterns are foamed polystyrene shapes glued together into the shape of the part to be cast and are coated with a refractory material consisting of a mineral mixture and binders. Pr

    Jan 1, 2001

  • NIOSH
    OFR-115-79 Core Recovery Techniques For Soft Or Poorly Consolidated Materials

    By J. E. Rourke, O&apos

    A wide variety of techniques and equipment are available for coring soft or poorly consolidated geological material. This report presents a comprehensive literature review and evaluation of these tech

    Jan 1, 1978

  • AUSIMM
    Controls on Disseminated Gold Mineralisation at Fosterville, Victoria, Australia

    The Fosterville Goldfield has a modest past production (0.3 Moz), but is now emerging as a significant goldfield (2.6 Moz resources, including 1.1 Moz reserves) with implications for exploration withi

    Jan 1, 2005

  • NIOSH
    IC 6540 Mine Explosions and Fire in the US During the Fiscal Year Ending June 30 1931

    By D. Harrington

    Approximately 2,000 persons are killed annually in the coal mines of the United States. There is no question that this number is at least double and probably treble what it should be and by all means

    Dec 1, 1931

  • NIOSH
    IC 7012 Milling Methods And Costs Of The Cardinal Gold Mining Co., Bishop Creek, Calif. ? Introduction

    By Walter B. Lenhart

    This paper is one of a series on milling methods and costs being. published by the Bureau of Mines. The milling practices and special problems relating to grinding, tailings disposal, and choice of a

    Jan 1, 1938

  • SAIMM
    Annual Financial Statements - Report Of The Independent Auditors

    To the members of The South African Institute of Mining and Metallurgy We have audited the annual financial statements of The South African Institute of Mining and Metallurgy set out on pages 451 t

    Jan 1, 2003

  • DFI
    Design And Construction Of An Earth Retaining Structure - Using A Pile In Self-Hardening Grout (PSHG) Wall

    By Allan Sylvester

    Construction of the Shot Tower Metro Station in Baltimore, Maryland was performed in two phases. In the first phase, a contractor was retained to excavate the station in order to construct twin tunnel

    Jan 1, 1997

  • NIOSH
    Bulletin 11 The Purchase Of Coal By The Government Under Specifications

    By GEORGE S. POPE

    This bulletin is the third of a series a showing the results of ment purchases of coal according to specifications as to its quality and giving typical forms of proposals for supplying coal and genera

    Jan 1, 1910

  • SME
    New Crystal Springs Bypass (Polhemus) Tunnel—Design Challenges

    By Roy C. Fedotoff, Jon Hurt, Gregg Sherry, Gilbert Tang

    The 1,380 m (4,200 ft) long New Crystal Springs Bypass (Polhemus)Tunnel (NCSBT) will replace the existing Crystal Springs Bypass Pipeline. This tunnel project is part of the SFPUC’s $4.3 billion capit

    Jan 1, 2007

  • AUSIMM
    The Drainage of the New Chum Line of Reef

    One of the chief drawbacks to Bendigo mining always has been the difficulty of draining the mines in an equitable manner, so that each company or mine owner bears the properly share. The trouble seems

    Jan 1, 1902

  • SAIMM
    Comparison Of Globoid And Cylindrical Shearer Drums? Loading Performance

    By M. Ayhan

    Drums of a modern longwall shearer are manufactured to include various constructional features conveying extracted material onto the face conveyor as efficiently as possible. Designing a drum with a c

    Jan 1, 2006

  • SME-ICGCM
    Three-dimensional FEM analysis to sale field measurements from deep mine accessways

    By M. J. Beus

    A shaft is truly the "lifelinen of an underground mine. Damage to the shaft lining and guides as a result of ground movement can result in serious loss of production and extensive and continual repair

    Jan 1, 1989

  • NIOSH
    OFR-38-75 Electromagnetic Noise In McElroy Mine

    By M. Kanda

    Two different techniques were used to make measurements of the absolute value of electromagnetic noise in and above an operating coal mine, McElroy Mine, located near Moundsville, West Virginia. The e

    Jan 1, 1974

  • SAIMM
    The Residue Waste Disposal Facility For Iscor?s Hillendale Project In KwaZulu-Natal

    By J. R. G. Williamson

    The Mining Division of Iscor, an integrated minerals and metals company, has recently completed a feasibility study for the establishment of a new heavy minerals mine and smelter in the Richards Bay a

    Jan 1, 1997

  • CIM
    Analysis and Optimisation of life-of-Mine Haulage Cost using Simulation

    By Niklas Frank

    Ore and waste transports form an integral part of any mining operation and represents a substantial portion of the mine´s total operating cost. Mine layout, truck fleet and size, production rates, hau

    May 1, 2003