Search Documents

  • AUSIMM
    The Chinese Iron and Steel Industry Response to the Challenges of Iron Ore Supply

    By Y Sha

    During the last two decades, China has expanded its iron and steel industry very quickly, from less than 100 Mt/a steel production to over 700 Mt/a. It caused big increases in both domestic iron ore p

    Aug 12, 2013

  • IIMP
    Breakage and fragmentation modelling for underground production blasting applications

    By Italo Oñederra

    A review of breakage and fragmentation literature has shown that only a few models have been specifically developed for applications in underground production blasting. These approaches, however, have

    Sep 12, 2005

  • SAIMM
    The grate-kiln induration machine - history, advantages, and drawbacks, and outline for the future

    By J. C. Ion, O. Isaksson, J. Stjernberg

    Iron ore pellets are a preferred feedstock for ironmaking. One method used for pelletizing is the grate-kiln process, first established in 1960.During the past decade, the establishment of new grate-k

    Jan 1, 2015

  • DFI
    Soil Plug in Open Ended Pipe Piles Embedded in Sand

    By Mohammed Y. Fattah, Wissam H. S. Al-Sudani

    "During installation of pile, a soil column is formed inside the pile. For small depths, the height of the soil column typically equals to the penetration depth (full coring state). As the penetration

    Jan 1, 2014

  • ISEE
    Borehole Deviation Control Using Electronics: An Euler’s Approach

    By Francisco Sena Leite, Pedro Brito, Gean Frank, PhD Soeiro de Carvalho, Jose, Vinicius Miranda

    The consequences of rock blasting with explosives are directly related to the accuracy of drilling and, because they have an effect on fragmentation and ground level, they should be controlled to ensu

    Jan 1, 2019

  • SME
    Taconite Mining – Concerns and Challenges

    By William R. Yernberg

    The combined 75th Annual Minnesota Section of SME meeting and 63rd Annual University of Minnesota Mining Symposium was held April 9 and 10, 2002, in Duluth, MN. This year’s theme was “Keys to the Fut

    Jan 1, 2002

  • NIOSH
    RI 4846 Concentration Of Oxide Manganese Ores From San Bernardino County, Calif.

    By W. W. Agey

    As a part of the program of investigation of domestic sources of manganese in the western United States, engineers of the Bureau of Mines examined. and obtained samples of ore from two properties in t

    Jan 1, 1952

  • SAIMM
    Life And Design Of Bord-And-Pillar Workings Affected By Pillar Scaling

    By M. D. G. Salamon

    It has been noted in recent years that the pillars in some bord-and-pillar workings scale or spall. In due course this process may result in the collapse of the affected panels. This paper presents a

    Jan 1, 1998

  • NIOSH
    IC 8832 Automatic Fire Protection Systems For Surface Mining Equipment

    By William H. Pomroy

    Fire on surface mining equipment is a serious hazard to life and property. The Bureau of Mines, through a program of contract and in-house research, has developed and in-mine demonstrated reasonably p

    Jan 1, 1980

  • IOM3
    Gold-quartz veins at Gralheira, northern Portugal: mineralogical and geochemical characteristics

    By A. M. R. Neiva

    The WNW-ESE-trending hydrothermal veins cut alternating mica schists and quartzites of mainly Ordovician age and, to the west, a Hercynian muscovite-biotite granite. They have been prospected and deve

    Jun 16, 1905

  • CIM
    Discrete Event Control and Dynamic Scheduling for Tele-Robotic Mining

    By Jamie King

    This paper describes the use of dynamic scheduling and discrete event control to provide coordinated control of multiple automated vehicles. In the past decade there have been significant advances in

    May 1, 2001

  • CIM
    Dispersion study on slimes from Niobec

    By J. A. Finch, A. R. Laplante, R. Espinosa-Gomez

    "The Niobec concentrator rejects up to /5% of the Nb as slimes (-10u.m). The recovery of Nb from these slimes by column flotation is being studied. An essential condition for selective flotation is sl

    Jan 1, 1987

  • SME
    Double Shield TBM In Challenging, Difficult Ground Conditions?A Case Study From Zagros Long Water Transfer Tunnel, Iran

    By Jafar Khademi Hamidi

    The Zagros long tunnel is one of the main components of Sirvan water transfer project in western Iran. It is approximately 48 km in length and consisted of two lots. The second 26 km lot of this tunne

  • AUSIMM
    The Geology of Tinaroo Area, North Queensland

    The upper amphibolite-grade mctasediments of thc rinaroo area, North Queensland, form part of a regional aurcole to the large Tinaroo Batholith and are the stratigraphic equivalents of the Hodgkinson

    Jan 1, 1982

  • SAIMM
    Quantitative Rockburst Hazard Assessment At Elandsrand Gold Mine

    By F. Essrich

    A quantitative rockburst hazard assessment procedure was introduced on Elandsrand Gold Mine at the end of 1994. It is currently used to evaluate the seismicity-related risk in production areas on the

    Jan 1, 1997

  • AIME
  • ISEE
    Journal: 100 Years / Engineering News New York January 5, 1905 Methods and Cost of Blasting and Handling Boulders (52912f89-42e4-4811-8c7f-344764181b42)

    By Daniel Hauer

    Blocking. (5) The “blocking” of boulders is a much cheaper way of breaking them up than “mud capping.” It should always be used in preference to that method except when too much time will be consumed

    Jan 1, 2006

  • SAIMM
    Utilisation Of The Mineral Density Separator In The Coal Industry

    The Mineral Density Separator (MDS) was developed by Mintek to predict mineral separation in a plant, evaluate efficiencies and develop scale-up parameters. This study investigated the influence of pa

    Jan 1, 2006

  • SAIMM
    Extending Empirical Evidence Through Numerical Modelling in Rock Engineering Design

    Models are used in engineering to reproduce reality as faithfully as possible so that the expected response of a system for given actions or inputs can be determined. In the field of rock engineering,

    Jan 1, 2014

  • SME
    Upside Down Concrete Accelerates Large Tunnel Project

    By George Joseph Malina

    Contractor chose and Owner allowed concrete to be placed using the arch first principle while excavating the 35'-3" O.D. rock tunnel. The contract included excavating and lining 26,000 L.F. of ro

    Jan 1, 1981