Search Documents

  • AUSIMM
    The Mineral Association of Tennant Creek Gold Ores

    By Edwards A. B

    The following note on the mineral association in the ores of the Tennant Creek Goldfield, Northern Territory, is largely based on Mineragraphic Reports Nos. 49, 89, 117 and 193 of the Council for Scie

    Jan 1, 1942

  • AUSIMM
    Long-Hole Directional Drilling Applications at Huntly West Mine, New Zealand

    By D Vickers, N C. Fowke

    The reduction of geological risk for planning of high production longwall faces is essential. Geological and geophysical techniques applied at Huntly West Mine before 1989 were unable to reduce the ge

    Jan 1, 1991

  • NIOSH
    RI 9331 - Characterization of the Rare-Earth Mineralogy at the Pea Ridge Deposit, Missouri

    By C. W. Whitten

    Iron ore deposits in south-central Missouri have emerged as a possible resource for the rare-earth elements. The Pea Ridge Iron Mine is one such deposit. Rare-earth minerals at the Pea Ridge Iron Mine

    Jan 1, 1990

  • AUSIMM
    Continuous Improvement - How Changes in Metallurgy can have a Substantive Impact on Environmental Impact and Closure - Lessons Learnt from Environmental Auditing

    By G McMillan, P Mulvey

    "Geochemical characterisation is done based upon the geology and metallurgical batch testing prior to commencement of the operation of the plant.  Tailings repository design is based upon geochem

    Jul 15, 2013

  • SME
    New Developments In The Recovery Of Copper, Cobalt, Zinc And Manganese In The Boleo Process

    Baja Mining is currently constructing the Boleo metallurgical plant in Santa Rosalia, Mexico to recover copper, cobalt, zinc and possibly manganese products from the Boleo ore. The process involves a

    Jan 1, 2012

  • SME
    Increasing Kaltim Prima Coal Overland Conveyor Speed To 8.5 MPS

    By Poltak Sinaga

    PT Kaltim Prima Coal?s 13.1 km overland conveyor (OLC) was commissioned in 1991. It is of conventional 3 roller 350 trough belt type. Cost and performance optimization during initial design ended up w

    Jan 1, 2008

  • SAIMM
    Cokriging of compositional balances including a dimension reduction and retrieval of original units

    By V. Pawlowsky-Glahn, E. Pardo-Igúzquiza, J. J. Egozcue, R. A. Olea

    Compositional data constitutes a special class of quantitative measurements involving parts of a whole. The sample space has an algebraic-geometric structure different from that of real-valued data. A

    Jan 1, 2015

  • SME
    Strata mechanics of pillar mining at the Crandall Canyon Mine

    By W. G. Pariseau

    "The Crandall Canyon Mine (CCM) is located in the Wasatch coal field in central Utah. Extensive longwall mining at CCM preceded a decision to recover coal left in barrier pillars on each side of a set

    Jan 1, 2014

  • AUSIMM
    The Application of Solvent Extraction to the Recovery of Uranium from El Sherana Ore

    Solvent extraction has recently been introduced into Australian hydrometallurgical practice for the production of a high grade uranium concentrate from El Sherana ore by a sulphuric acid leach and sol

    Jan 1, 1961

  • SME-ICGCM
    A Method for Sizing Longwall Pillars Based on Field Measurements

    By Christopher Mark

    A new method for the design of longwall pillars, called "Analysis of Longwall Pillar Stability" (ALPS), is described. The method is the final result of a research program that included two major field

    Jan 1, 1987

  • SME
    Crisis Management: What To Do If Disaster Strikes

    By Joseph J. Zaluski, J. Steven Gardner, Marco M. Rajkovich

    The telephone rings at 3:20 a.m. An exasperated voice on the other end says, “There has been a mine explosion at Mine No. 5 and we have not heard from three units of men.” Twenty-three minutes later

    Jan 1, 2004

  • DFI
    Non-Destructive Testing Methods For Drilled Shaft And Acip Piles

    By George Piscsalko

    There are numerous methods currently available to assess the integrity of drilled shaft and ACIP piles. Each method has its advantages and limitations. This paper will compare the various available me

    Jan 1, 2011

  • DFI
    Deep Soil Stabilization Using Lime Cement Columns - Synopsis:

    By Melvin I. Esrig

    Lime Cement column stabilization of soft clay and sand in Salt Lake City, Utah and in San Francisco California is described and discussed. Stabilization permitted the construction, in a single stage,

    Jan 1, 2000

  • CIM
    Conjugate Oblique-Extension Veins in Shear and Tensile Fracture Systems at the Komis Gold Mine and Mufferaw Gold Prospect, Northern Saskatchewan

    By Bruno Lafrance

    Abstract - Quartz veins at the Mufferaw gold prospect and Komis gold deposit, northern Saskatchewan, are examples of oblique-extension veins that crystallized in shear and tensile fractures, which pro

    Jan 1, 2004

  • SME-ICGCM
    Automated Monitoring Of Rock Slopes And Waste Dumps

    By Andrew G. Martin

    In 1991, Modular Mining Systems began marketing a Slope Monitoring System (SMS) now installed at twelve mines. The SMS uses automated wire line extensometers to monitor field conditions frequently. Ev

    Jan 1, 1996

  • SME
    Evaluation of Mica as a Source of Potash Mining, Metallurgy and Exploration

    By Nikhil Dhawan, Ashwini Kumar, Yogendra Pratap, Himanshu Tanvar

    India does not possess any soluble potash reserves and depends completely on imports. In this study, an attempt has been made to recover potash (K) values from the mica sample employing thermal and me

  • AUSIMM
    Coal Ash Disposal at Rotowaro Minesite: A Reference Condition Approach to Setting Boron Criteria and Assessing Environmental Effects

    By S Speed, N Corlis, A Goldstone, G N. Browne, M Fitzpatrick

    In 2005, Solid Energy New Zealand Limited obtained non-notified consent for the disposal of 1Mt of coal ash at the Rotowaro minesite, forming part of a coal supply agreement with the Huntly Power Stat

    Jan 1, 2006

  • TMS
    Synthesis and Characterization of ZrB2 Produced with Molten Salt Electrolysis

    By Selda Ozkan

    In this study, a combination of cathodic arc physical vapor deposition (PVD) and molten salt electrolysis methods were used to obtain ZrB2 layers on AISI 304 grade stainless steel surface. Prior to bo

    Jan 1, 2010

  • DFI
    Port Mackenzie, Alaska - Deep Soil Compaction, Spin Fin- Pile Tension Test And Dock Construction

    By Garth Howlett

    In 1998 the Matanuska-Susitna Borough formed the new port district at Point MacKenzie, known as Port MacKenzie, located directly across the Knik Arm from Anchorage. In 1991 PND Engineers Inc. (PND), w

    Jan 1, 2006

  • SAIMM
    How Electronics Can Release the Imagination

    By G. V. R. Landman

    It is self-evident that economic pressure demands that today?s mines stay ahead and stay competitive. The challenge, however, isto find fresh approaches to the pursuit of efficiency and operational ef

    Jan 1, 2010