    Automating Delay Reporting to Deliver Effective Maintenance

    By Shaun Booth

    Automating Delay Reporting to Deliver Effective Maintenance Corporate Background: Technology Company: Matrikon Inc. Global software and service provider of Information Technology and Control Solut

    May 1, 2003

  • CIM
    The Red Bluff gold-copper porphyry and associated precious and base metal veins, northwestern British Columbia

    By D. A. Rhys

    "The Red Bluff porphyry is a tabular 2 km long north-west trending Early Jurassic quartz diorite to monzodiorite body that intrudes a folded Triassic greywacke sequence in the lskut River area, northw

    Jan 1, 1995

  • CIM
    Flotation Improvements in the Luzenac Penhorwood Talc Concentrator

    By Ross Byron, Ken Roberts

    "During the fall of 2001 a program was initiated to determine the feasibility of improving the metallurgy in the flotation circuit at the Penhorwood Talc Concentrator located near Timmins, Ontario. Be

    Jan 1, 2004

  • CIM
    Microprocessor studies in process metallurgy

    By K. Ananthanarayanan, R. I. L. Guthrie, S. A. Argyropoulos

    "The low cost and availability of micro-computers and their peripherals provides the metallurgical engineer with the opportunity to use such computers in a wide variety of applications. In this paper,

    Jan 1, 1980

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • CIM
    Application of expert systems for peak power management

    By Y. L. Su, S. Vongpaisal, H. A. Smith

    "It is extremely difficult for a mine's central control room operator to control peakpower demands and to maintain normal materials handling operations at the same time. An investigation of the F

    Jan 1, 1993

  • CIM
    Advanced Control for Column Flotation

    By G. A. Kosick, G. S. Dobby

    "This paper presents the principles and application of a recently developed control system for flotation columns and column circuits. The control system uses triple pressure sensors to directly sense

    Jan 1, 1990

  • CIM
    Dates in technical reports

    By Deborah A. McCombe

    "There are a number of important dates that must be disclosed when a Qualified Person (QP) is preparing a technical report for securities purposes. The dates are discussed in NI43-101 and the Form of

    Jan 1, 2003

  • CIM
    Research into high density backfill placement methods by the Ontario Division of Inco Limited

    By B. Goard

    "IntroductionCemented backfill has been placed underground in slurry form in Inco Limited's Ontario Division mines since the early 196Os. The slurry was traditionally mixed on surface at between

    Jan 1, 1987

  • CIM
    Improvements in Sag Mill Throughput from Finer Feed Size at the Newmont Ahafo Operation

    By Adrian Dance

    Newmont Ghana Gold Limited?s Ahafo operation have been working with Metso Process Technology & Innovation (PTI) since early 2009 to increase mill throughput from a combination of controlled blasting p

    Jan 1, 2012

  • CIM
    Steam Genera ting and Power Plants, Company, Nova Scotia Light Limited

    By A. R. Harrington

    BEFORE discussing some of the technical aspects of the steam generating plants of Nova Scotia Light and Power Company, Limited, it might be of interest to go back through history and see the developme

    Jan 1, 1958

  • CIM
    Process control and instrumentation in mineral processing plants

    By A. L. Mular

    "IntroductionThe mining industry has made slow but steady progress toward the automation of mineral processing plants over the last 35 years. The stimulus to automate is associated with important econ

    Jan 1, 1989

  • CIM
    Design of dewatering circuits in oil sand plants by utilizing a hydrocyclone model simulation

    By A. I. A. Salama

    The CANMET Western Research Centre (CWRC) has developed a hydrocyclone model simulation of dewatering and fine particle separation circuits. The simulation is based on an existing empirical model. Uti

    Jan 1, 2003

  • CIM
    Hollinger Shaft Practice

    By V. J. Southey

    HOLLINGER mining operations have required development by 24 vertical shafts having a total length of 28,160 feet. Seventeen of these are sunk from surface and seven are interior shafts. Four surface s

    Jan 1, 1939

  • CIM
    Bubble Load Measurement in the Pulp Zone of Industrial Flotation Machines - A New Device for Determining the Froth Recovery of Attached Particles

    By David Seaman, J-P Franzidis, Emmy Manlapig

    "A new device has been developed to directly measure the bubble loading of particle-bubble aggregates in industrial flotation machines, both mechanical flotation cells as well as flotation column cell

    Jan 1, 2004

  • CIM
    Bumps in No. 2 Mine, Springhill, Nova Scotia (6b22a26e-d82e-4ce9-8c21-9da88f205566)

    By Walter Herd

    For the past eight years, No. 2 mine of the Cumberland Railway & Coal Co., Springhill-a subsidiary of the Dominion Coal Co., Ltd.-has had an unenviable reputation for bumps. As the workings extended i

    Jan 1, 1929

  • CIM
    Innovative use of SMART Cable Bolt Data: Numerical - Back Analysis for Interpretation of Post Failure Rock Mass Properties Post-

    By Jason J. Crowder

    Presentation Outline ? Introduction ? Costs of ground support and rehabilitation ? Why post-failure rock mass properties are necessary ? The Rock Mechanics Problem ? Present State of Modelling a

    May 1, 2006

  • CIM
    Large-scale panel destress blast at Brunswick mine

    By B. P. Simser, R. K. Brummer, A. Mortazavi, P. P. Andrieux

    "A large-scale panel destress blast was fired at Brunswick mine in the fall of 1999 in order to reduce the ground stresses in a critically important neighbouring mining region. This work, sponsored by

    Jan 1, 2003

  • CIM
    Sill pillar recovery at the Louvicourt mine

    By D. Fleury

    "This paper describes the challenges of mining a sill pillar under various types of paste backfill quality. From 1994 to 2002, Louvicourt mine produced approximately 12,600,000 t grading 3.5% Cu, 1.5%

    Jan 1, 2005

  • CIM
    Management of Environmental Emissions at Boliden Harjavalta Oy’s Smelter

    By H. -L. Heikkilä, E. Peuraniemi

    "Boliden Harjavalta Oy has a long tradition in the Finnish metal industry starting from the 1930's. The Smelter consists of copper and nickel flash smelting lines. Off-gases are captured in the acid p

    Jan 1, 2012