Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Innovative Use of Advanced Technology in Mining

    By Craig Dirk

    Agenda Applications of ?GPS ?Drill Navigation ?Cycle time monitoring ?UDS / Boom Stress monitoring ?Payload systems ?Laser Surveying Future Applications

    May 1, 2006

  • CIM
    Study on Feasibility of Columnar Jointed Basalt as a High-Arch Dam Foundation

    By Wei Yun-Jie

    Columnar jointed basalt is a fractured rock, with a lot of small spacing structural planes and poor integrity of the rock mass. On the basis of the comprehensive study of the columnar shape of Columna

    May 1, 2009

  • CIM
    Behaviour and Benefits of Arsenic in Copper Electrorefining

    By A. Pranowo, G. R. F. Alvear F., N. Aslin, M. S. Moats

    "The toxicity of arsenic is well known and documented; however, the presence of arsenic in copper electrorefining anodes and electrolytes is critically necessary to produce high-quality cathode. Arsen

    Jan 1, 2016

  • CIM
    Rehabilitation of an underground ore storage bin at Myra Falls

    By K. Reipas

    "Westmin Resources Ltd. operates the 3300 TPD H-W underground copper/zinc mine on Vancouver Island. Ore storage underground is handled in a 6000 tonne coarse ore bin and a 3000 tonne fine ore bin. Bot

    Jan 1, 1995

  • CIM
    Hauler Body Payload Balance

    By T. G. Joseph

    The chicken and egg scenario where adverse truck motions cause ground deterioration and poor ground profiles that in turn cause adverse truck motions is a downward deterioration spiral that dominates

    Nov 1, 2011

  • CIM
    The Use of Continuous Materials Handling Equipment at the Open Cut Mine Face

    By David J. Morrison

    Scarcity of truck tyres, increasing cost and decreasing availability of labour, increases in fuel costs and project budget blowouts have changed the paradigm behind mining equipment selections. The c

    May 1, 2007

  • CIM
    An Investigation into the Regrinding Circuit Efficiency at Miduk Copper Complex

    By R. Shamsodini, A. Poor Zaeif Doost, H. Haji Amin Shirazi, M. R. Garmsiri

    "With columns being installed in rougher section at Miduk Copper Complex, the rougher feed mainly reports to rougher-scavenger cells. To evaluate the efficiency of regrinding circuit, we conducted flo

    Jan 1, 2012

  • CIM
    Mineralogical and Wallrock Alteration at the Jinqingding Gold Deposit in Jiaodong Peninsula, China (6478e8f0-1dcd-46fc-a187-446b60449d56)

    By Jiuhua Xu, Shuiku Jia, Weiren Sun

    "The Jinqingding gold deposit, situated in the east Jiaodong Peninsula of Shandong province, is typical of the pyrite-quartz vein gold deposits in the Muping-Rushan gold belt of China. The gold deposi

    Jan 1, 1994

  • CIM
    Characteristics of Coal Bumps by Microseismic Monitoring in Underground Coal Mining with Hard Roof and Coal Seams

    By Yi-xin Zhoa

    The characteristics of coal bumps are analyzed based on the microseismic data from No.8935 workface in Xinzhouyao coal mine, Datong Mining Group. The geology of this workface is characterized by the t

    Aug 1, 2013

  • CIM
    Structural equation modelling of leaching of oxidized copper-cobalt ore in a hydrochloric acid solution

    By M. B. Kime

    "A set of experimental batch leaching tests studied the effect of pH, time, temperature, and stirring speed on the relative Cu, Co, Ni, and Fe leaching yields of an oxidized copper-cobalt ore sample i

    Jan 1, 2017

  • CIM
    Improved Operational Performance Through Information Management ? A case Study from Rio Tinto?s Northparkes Mines

    By Jeff Smith

    Agenda About NORTHPARKES The NEED The INITIATIVE The SEARCH The PRODUCTS The SOLUTION The RESULTS The Northparkes copper-gold mine in Central Western NSW commenced operations in 1994. Copp

    May 1, 2006

  • CIM
    An Overview of the Mantaro Phosphate Project, Peru

    By William A. Napier

    The Mantaro Phosphate Property is located ~ 250 km east of Lima, Peru in the Andean altiplano near the city of Huancayo, Junin District. The Mantaro deposit is a mineralized zone of phosphatic rock cu

    May 1, 2011

  • CIM
    The Dominance of the Competent (132ad218-068a-4432-85e5-c44062e501fc)

    By Å. Partapuoli, M. Henriksson, P. Wikström, J. Worth, G. Adolfsson

    The control of AG mills fed by ores with harder and softer components can be challenging due to the sensitivity of the mill to the ratio of hard to soft components. The mills at LKAB’s iron ore operat

    Jan 1, 2012

  • CIM
    Electrolytic Refining of High Ni Copper Anode at the Tank House in Naoshima Smelter and Refinery

    By Osamu Inoue, Takashi Yamashita, Takashi Ikemoto

    The expansion project in Naoshima smelter and refinery to meet enhancing recycling business of E-scrap was successfully completed in 2016 to have a capacity of 110,000 tpa of E-scrap treatment. Increa

    Jan 1, 2019

  • CIM
    Critical Wear in Ageing Infrastructure

    By Bruce Peberdy

    Outline ?Building Systems ?Climatic Effects ?Thermal Effects ?Building Components ?Building Materials ?Structural Deterioration ?Maintenance Considerations

    Nov 1, 2011

  • CIM
    Study of the Macro-Scale Solute Redistribution due to Liquid Metal Feeding during the Solidification of A356

    By D. M. Maijer, S. L. Cockcroft, A. B. Phillion, P. Fan, C. Reilly, H. Khadivinassab

    A combined experimental / numerical approach is proposed to investigate the bulk transfer of solute due to liquid metal feeding during shape casting of aluminum alloy A356 (Al-7Si-0.3Mg). A dumbbell-s

    Jan 1, 2014

  • CIM
    Geological Setting and Characteristics of the Red Chris Porphyry Copper-gold Deposit, Northwestern British Columbia

    By C. H. Ash

    "Abstract-The Red Chris Cu-Au deposit (522.7 Mt at 0.35% Cu and 0.27 g/t Au), northwestern British Columbia, is one of several pre-accretionary porphyry systems in the Cordillera of western Canada. It

    Jan 1, 1997

  • CIM
    Quantification of the DSM Potential of Commercially Available Energy Conservation Technology Applications at Present and Future Hard Rock Mines in British Columbia

    By Andrew Bamber

    The mining and beneficiation of minerals is the second largest end-use of electrical power on the planet, and comminution is by far the largest single contributor to this. Several jurisdictions, inclu

    Aug 1, 2013

  • CIM
    Behaviour of Selenium Contained in Copper Anode Slimes by Oxidizing Alkaline Leaching

    By O. Benavente, M. C. Hernández

    Selenium is obtained mainly from copper anode slimes, which is a by-product of the copper electrorefining process. Selenium is present in copper anode slimes as silver and copper selenides. Tradition

    Jan 1, 2019

  • CIM
    An Overview of the Design, Construction, Commissioning and Early Years of Operation of the SAG/BALL Mill Grinding Circuit at Phu Kham Copper, Gold Operation in Laos (2591af67-8b36-460d-95d3-27f0fd815410)

    By D. W. Bennett, J. B. Hadaway

    The operation at Phu Kham commenced design and construction in early 2006 and was commissioned in May 2008. This paper will examine and discuss the project from the inception of flow sheet development

    Jan 1, 2012