Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Boulby Mine Backfill System: Operational Experience

    By M. Keen

    The backfill system at Cleveland Potash?s Boulby Mine places waste filter cake underground in the form of a high concentration slurry in worked out areas of the mine reducing the mine?s environmental

    May 1, 2007

  • CIM
    Design and Implementation of a Brownfield Sag Pre-Crush Circuit

    By G. Castillo, G. Thies, C. Bissue

    "Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond

    Jan 1, 2013

  • CIM
    Three Stage of Crushing an Alternative to Sag Circuits

    By Christian Ottergren

    "Modern crushers offer double the capacity and performance of classic models. In some cases crushers are replacing SAG circuits, the advantages being smaller investment and lower operating costs. Is T

    Jan 1, 2004

  • CIM
    Some Insights into the Process Design of Ferronickel Smelters

    By S. Mostaghel, S. Nicol, M. Y. Solar

    Once upon a time, the process engineer developing the design criteria for a new saprolite ferronickel smelter had it easy: most ores were around 2.5% Ni, with a Fe/Ni ratio of 4 to 5 and a SiO2/MgO ra

    Jan 1, 2014

  • CIM
    Explosions in Mines ? Systematic Failure

    In some parts of the world explosions in mines are more commonplace events. Even in the more developed nations explosions have occurred in recent times. In some cases these mines have significantly lo

    Aug 1, 2013

  • CIM
    Advances in Precious Metal Trace Element Analyses for Deportment using LAM-ICP-MS

    By Paul J. Sylvester, Yeonuk Choi, Mike Nelson, Louis J. Cabri, Mike Tubrett

    "The development and characterization of sulphide standards containing as many as seven precious metals has increased the efficiency and comprehensiveness of micro-analyses for deportment studies usin

    Jan 1, 2010

  • CIM
    Mineralogical and Metallurgical Results at Peñoles´ Mining Operations - Mexico

    By Luis Magallanes-Hernández

    "Industrias Peñoles, S.A. de C.V. (Peñoles) in Mexico, is a major silver producer. The Peñoles Mining Division has eight Mining Operations and in seven of them, flotation is used to concentrate the me

    Jan 1, 2005

  • CIM
    Assessing the Value of Ventilation on Demand CIM Conference

    By Glenn Lyle

    CEMI Introduction ? Introduction of the CAF VOD Project ? Who are our partners ? What were the Outcomes What is next

    May 1, 2011

  • CIM
    Quality Control of Assay Data: A Review of Procedures for Measuring and Monitoring Precision and Accuracy

    By M. Abzalov

    "Control of analytical data quality is usually referred to in the mining industry as Quality Assurance and Quality Control (QAQC), and involves the monitoring of sample quality and quantification of a

    Jan 1, 2008

  • CIM
    Continued Development of Copper Flotation Control at the Kidd Creek Concentrator (af11f3f9-89ef-4f91-815b-39411f77be72)

    "Automatic flotation control in varying degrees of sophistication is practiced at a number of concentrators throughout the world. Practically, the variable conditions in the flotation circuit and the

    Jan 1, 1983

  • CIM
    Modelling Secondary Crushing Plants for Teaching Purposes and Operator Training

    By J. A. Meech, R. J. Tucker

    "A dynamic computer model has been developed to simulate the operation of ore crushing plants. The model was created in a general form to allow imitation of a wide variety of secondary crushing circui

    Jan 1, 1985

  • CIM
    Utilization of Surfactants in Recovery of Gold Employing Carbon

    By A. T. Robles, L. Buckingham

    "When certain gold ores containing pyrite, graphite, humates and fumates or other organic compounds which are possibly adsorbed on clay minerals are treated with aqueous solution of alkali metal cyani

    Jan 1, 1992

  • CIM
    Use of the IREDES Standard For Real-Time Information Exchange in Mining Process Optimization

    By Christoph Müller

    Information exchange for mine process optimization is essential. Today, modern mining equipment uses the IREDES standard to exchange production plans and reports for easy management and storage. To ga

    Oct 1, 2009

  • CIM
    In Pit Crushing & Conveying in hard rock applications Todays? challenges ? future?s chances

    By Andreas Oberrauner

    Content ? What is? an introduction ? Crushing technology ? Conveying in pits ? Pit-exiting strategies ? Mine Planning in IPCC ? Summary/Conclusions EHS slide ? Sandvik?s objective is zero harm

    Aug 1, 2013

  • CIM
    Flooding and loss of the Patience Lake potash mine

    By D. Gendzwill, N. Martin

    "In early 1987, the Patience Lake potash mine near Saskatoon, Saskatchewan, was closed due to uncontrollable floodingWater inflows were first encountered during routine mining in 1975 at the south bou

    Jan 1, 1996

  • CIM
    In Situ Measurements for Geomechanical Design of Cemented Paste Backfill Systems

    By M. W. Grabinsky

    Better in situ performance data is required in order to advance the rational geomechanical design of cemented paste backfill systems. A few in situ test programs have been conducted, but these have su

    May 1, 2007

  • CIM
    A liquefaction incident in a fill raise: A case study

    By F. Hassani, K. Moozar, J. Ouellet, P. Gauthier

    "This paper describes a sudden spill of waste rock used for backfilling from a waste pass at an underground mine in Canada, thus causing a major failure/accident. The mine operator immediately launche

    Jan 1, 2004

  • CIM
    The Metallgesellschaft Research Laboratories, Some Aspects

    By G. S. Farnham

    Abstract This paper lists the interests of the Physical Metallurgy and Chemical Research laboratories of the Metallgesellschaft, which were visited by the authors, members of a group of Canadian in

    Jan 1, 1946

  • CIM
    Gyratory Crusher Wear Monitoring Using Laser Technology

    By Persio P. Rosario

    Crushing has proven to be of fundamental importance in mine mill integration at Highland Valley Copper (HVC). Highland Valley Copper has achieved large throughput and good quality control through the

    May 1, 2002

  • CIM
    Gold Milling at Lac Shortt

    By P. Dyas, H. Zouitt, D. M. Smith

    "Falconbridge Copper's Lac Shortt gold mine is located in northern Quebec approximately 300 km northeast of Val D'Or and 100 km west of Chibougamau (Pig. 1). Engineering for the mill commenced in earl

    Jan 1, 1987