Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Biological Sulphide Production for Process and Environmental ApplicationsBy Lyn Jones, Mike Bratty, Rick Lawrence, David Kratochvil
"The treatment of water is required at many mining operations to remove metals and prevent the discharge of contaminated water to the environment. In other cases, water treatment is used to provide be
Jan 1, 2006
-
Coarse Lead Flotation Practice at PolarisBy R. Simkus, J. K. Gowans
Polaris Operations, a Cominco Ltd. lead-zinc mine, is located on Little Cornwallis Island, Northwest Territories, at Latitude 75°23' N and Longitude 96°75' w. When the Polaris Mine went into operation
Jan 1, 1984
-
Occupational Standards and Certification for Mineral Processing Technicians in the Northwest TerritoriesBy Mary Ann Bennett, Val Nichols, Colleen Proctor
"In 1997 when Royal Oak Mines Inc. went into receivership, the mineral processing technicians (mill operators) who had been working at Giant Mine in Yellowknife, Northwest Territories for most of thei
Jan 1, 2005
-
Asset Optimisation through Process Control at Xstrata Alloys – Eland Platinum ‘Optimal Doesn’t Always Rhyme with Capital’By Neo Molelekeng, Jocelyn Bouchard, Rebecca Monnapula, Martin Émond
"Xstrata Alloys – Eland Platinum concentrator (South Africa) has recently been commissioned and is now initiating a challenging optimisation program encompassing the entire operation. Process control
Jan 1, 2010
-
Comminution Circuit Design Considerations (49th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 17-19, 2017)By S. Rivard
"This paper demonstrates the selection of grinding circuit technology for a number of recent projects including discussion of the key drivers and the role of energy efficiency. Decreasing head grades
Jan 1, 2017
-
Dynamic Modeling and Virtual Prototype Simulation of the GAP-Oil Sands InteractionsBy Samuel Frimpong
The interaction of oil sands with a ground articulating pipeline (GAP) system has been simulated with the dynamic model established in this work by combining the multi-body and soil dynamics with the
May 1, 2004
-
Hydro-geotechnical and geochemical characterization of column consolidated cemented paste backfillBy T. Belem
The main objective of this study is to better understand the effect of underground CPB placement conditions on its microstructural, hydro-mechanical and geochemical properties. To reach this objective
May 1, 2007
-
Recent Changes at the Sarcheshmeh Copper Mine Flotation CircuitBy S. Banisi, M. Pourkani, A. Kargar, D. Hamidi, M. Sarvi
"Flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. To study the stage recovery of copper, one of the
Jan 1, 2001
-
Exploration riskBy R. G. Burn
"A brief outline will be given of the concept of risk and its implications with regard to investment in exploration. The relationship between risk and decisions under uncertainty will be examined as a
Jan 1, 1984
-
Intelligent Air Management for Energy Efficiency in Mining and Mineral Processing OperationsBy Arun .. J. Basu
The paper introduces Intelligent Air Management (IAM) as the core activity of M&I Group of Companies (M&I) for providing a total solution to any air management problems for mining and mineral processi
Apr 1, 2005
-
Longwall mining and potashBy G. Herget
"A brief visit to European longwall mining operations in potash showed that retreating longwall mining provides a very attractive alternative to room-and pillar mining, especially in areas with bad ro
Jan 1, 1986
-
NYE Concentrator ExpansionBy D. Turk, P. Lefebvre, J. Sargent, K. Major
"Stillwater Mining Company recovers platinum and palladium from their Nye Montana operations. Mining first commenced at Nye in 1987 at a milling rate of 455 t/d (500 stpd). The plant was expanded in 1
Jan 1, 2000
-
Toward the 24 hour large SAG Mill RelineBy John Russell
"Faster, safer, grinding mill relining offers the obvious attractions of reduced mill relining times with the knock-on incentive to reduce all other maintenance down-time, opening the possibility for
Jan 1, 2008
-
Gold Mineralization at the Anomaly A Deposit, Clarence Stream Area, Southwestern New Brunswick: Distal Deposits of a Syn-Deformational Intrusion-Related Gold System?By M. J. McLeod, S. Watters, G. G. Lutes, S. Castonguay
"Gold-bearing mineralization at Anomaly A occurs in polydeformed Ordovician turbidites of the Kendall Mountain Formation of the St. Croix belt in southwestern New Brunswick, and is hosted by WSWtrendi
Jan 1, 2008
-
Experiences with a New Generation Automated Long Hole Drilling Rigs at LKAB Kiruna Mine in Northern SwedenBy Patrik Ericsson
During the 90?s Atlas Copco and LKAB developed a pioneering fully automatic long hole production drilling system based on the Atlas Copco Simba W469 drill rigs. These drill rigs have since then drille
May 1, 2007
-
A New National PolicyBy C. M. Campbell
IN 1902, a famous Canadian geologist made the following statement : ?'From what we know row of the iron-ore fields of the Province, we may feel that Ontario is assured of a great future as an iro
Jan 1, 1937
-
The Geological Setting, Mineralogy, and Paragenesis of Gold-Bearing Polymetallic (Cu+Co+Ag+Au+Bi±Pb±Ni±U) Veins of the Merico-Ethel Property, Elk Lake, Northeastern Ontario, CanadaBy I. Campbell, P. C. Jones, E. G. Potter, R. P. Taylor
"The Cobalt embayment is a large domain of Paleoproterozoic clastic sedimentary rocks that unconformably overlies the Archean Abitibi greenstone belt. Regionally extensive sills and dikes of Nipissing
Jan 1, 2009
-
Pilot Scale Testing of a Lead-Zinc Ore Aljustrel ProjectBy Jeffiey B. Austin, Maurice Tagami
"The ores of the Iberian Pynte Belt are typically massive sulphide ores with very fine grained mineral textures. EuroZinc Mining Corporation is currently evaluating one of the massive sulphide deposit
Jan 1, 2000
-
Water Management in Hydraulic Fill OperationsBy M. Helinski
In the authors? experience inappropriate water management in hydraulic fill masses has been the root cause of most barricade failures. Inappropriate water management can lead to high water pressures,
May 1, 2007
-
An experimental investigation into the trapping model core pillars with reinforced fly ash compositesBy M. K. Mishra, U. M. R. Karanam
Relative to slender pillars, larger size pillars exhibit improved strata control. Fly ash, though traditionally treated as a waste product, is emerging as an alternate engineering material. This paper
Jan 1, 2008