Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An Appraisal of Tunnelling in the Auckland Region for Infrastructure DevelopmentBy J St George
Much of AucklandÆs transport infrastructure has been developed on surface with little or no consideration of underground options. Current and planned transportation routes are now facing high costs du
Jan 1, 2008
-
Application of Time Series Methods for Smelter Furnace Modelling and ControlBy Kam KM, Tran B
Statistical techniques of Box and Jenkins (1976) have been used to assess the existing control schemes and determine the dynamics of flash smelting furnace at the Kalgoorlie Nickel Smelter. Pertinen
Jan 1, 1996
-
Atomic Force Microscopy ù A New Characterisation Tool for Flotation ResearchBy B M. Moudgil
Atomic force microscopy (AFM) has become an important tool for understanding the nano- to molecular scale mechanisms predominant in multiphase systems. In flotation research, the use of AFM holds pro
Jan 1, 2005
-
A Variable Split Sample Divider - A New Tool for Sample PreparationBy R Simonato
It is now recognised that rotary sample division is by far the best laboratory tool for extracting subsamples from a lot of material. In terms of sampling theory, rotary division, by virtue of the fac
Jan 1, 2008
-
When Does Further Processing at the Mine Site Make Sense?By G Lane, S La Brooy
A century ago, new mines were often accompanied by smelters. In Australia, smelters were built at the Daydream mine near Broken Hill, at Kuridala and Mount Elliott near Mount Isa, Broken Hill, Mount L
Jan 1, 2008
-
Internalising Environmental Management - Bringing the Environment into ManagementThe mining industry was one of the first industry groups to be confronted by and to respond to public and government pressure to improve its environmental management. Companies operating in New Zea
Jan 1, 1991
-
Sinking No. 3 Elliptical Shaft at North Broken Hill Limited Broken Hill, N.S.W.This paper describes the operation involved in the sinking of a concrete-lined elliptical-shaped shaft at North Broken Hill Limited.Major factors such as geological features, future ventilation, ore h
Jan 1, 1956
-
Environmental Planning for Mining of Cable Sands' Minninup Deposit, Western AustraliaBy Martinick WG
In July 1986, Cable Sands (W.A.) Pty Ltd commenced mining for mineral sands at Minninup, approximately 16 km south of Bunbury, Western Australia.The area being mined is from the heel of the foredune t
Jan 1, 1986
-
A Methodology for Rock Mass Characterisation to Control Blast-induced VibrationsBy A Karrech, E Hamdi
The uncertainty of geomaterials properties is commonly encountered in resource engineering applications, especially in mining engineering where the rock mass texture, joints, fractures and damage zone
Aug 24, 2015
-
Autogenous Grinding in the Warrego Concentrator of Peko Mines N.L.By Stevenson C. H, Lynch A. J
The reasons for choosing autogenous grinding for the new Warrego concentrator of Peko Mines N.L. are discussed and the ores to be treated in the concentrator are described. The mill was designed on t
Jan 1, 1974
-
Ice-drilling and ground characterisation on the moon for space miningBy H S. Shin, H Jin, B H. Ryu, J Lee
Prospecting ice on the Moon necessitates drilling systems to obtain subsurface samples and measure the composition of ice deposits. Landers and rovers equipped with drilling equipment are essential fo
Sep 1, 2024
-
Development of a Near Field Damage Model for Cemented Hydraulic FillBy G P. F Chitombo
The dilution of blasted ore with cemented backfill materials has been recognised as a significant factor influencing the economics of some underground metalliferous mining operations. Several mechanis
Jan 1, 1998
-
Estimation of rock brittleness for jointed specimens under cyclic triaxial loadingBy P Khalkho, M Singh
Rock masses when subjected to uniaxial or triaxial cyclic loading (eg in hydraulic running tunnels, during retrieval and injection of oil and gas from storage underground caverns and haulage roads), t
Nov 29, 2022
-
A Facies Model for an Active Composite Volcano: Ruapehu, New ZealandBy Houghton BF
Ruapehu is an extremely active andesitic composite volcano, built in at least four cone- building episodes over the last 250 ka. The volcano was constructed by a variety of extrusive and subplinian
Jan 1, 1987
-
Advancement in experimental methodologies to produce phase equilibria and thermodynamic data in multicomponent systemsBy E Jak, M Shevchenko, D Shishin
One of the key aspects to develop sustainable metallurgical production is to ensure that the predictive power of thermodynamic tools is brought up to a new level of accuracy and reliability. Exploring
Aug 21, 2024
-
1991 New Zealand Branch Annual Conference û Appendix1991 New Zealand Branch Annual Conference û Appendix
Jan 1, 1991
-
Artificial Neural Network Approach for Evaluation of Weight of Fallen ObjectsBy D F. Akhmetov, M Yasuike, M Komazaki, Y Kawa
Remote monitoring of geological situation at distant regions with complicated relief, including reliable detection of the rock falls and estimation of the scale of accidents, is of great importance fo
Jan 1, 2003
-
Mass Transfer Studies for a Pulsed Disc and Doughnut Extraction ColumnBy H R. C Pratt, G W. Stevens
Hydrodynamic and mass transfer performance are presented for a 72.5 mm diameter pulsed disc and doughnut column of the type used by Western Mining Corporation, Olympic Dam Operation, for the extractio
Jan 1, 2000
-
Simberi Oxide Gold Project - Licensing ApprovalsIn June 1996, Nord Resources Pacific (Nord) decided to work towards obtaining all necessary approvals from the government of PNG for a mine on Simberi Island in the Tabar Island Group, New Ireland
Jan 1, 1997
-
Underground Geological Mapping at North Broken Hill LtdA proved routine mapping practice is described involving detailed observations on grade and structure. The equipment and methods employed are giving good service under the conditions encountered. Stop
Jan 1, 1940