Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mine productivity and equipment selection impacts with operational grade engineeringBy A F. von Wielligh, M Scott, L Keeney
Operational Grade Engineering (GE) is the early (pre-processing) discard of low-grade mineralised and/or barren rock to improve the ore grade and/or reduce deleterious elements within the run of mine
Nov 10, 2020
-
Moriarty was a Conglomerate – Experiences and Implications of Coal Mining under Massive Strata in the Newcastle CoalfieldBy M Creech
During the 1990s, wider and more productive longwall panels were being introduced into the Newcastle Coalfield. The strata of the Newcastle Coalfield incorporate numerous massive sandstones and conglo
Aug 18, 2014
-
Tunnelling on Northern Beaches Storage Project, Sydney, to Improve Water QualityBy N Taylor, P Hewitt
The Northern Beaches Storage Project (NBSP) is part of Sydney Water’s SewerFix™ Program to improve the wastewater system and protect public health and the environment. It was built by the SewerFix Wet
Sep 17, 2014
-
Thickening at Karara – The Role of Test Work and Innovative DesignBy G Hart
As the iron ore/magnetite boom gains momentum, it is particularly important to question established past trends and explore the potential of alternative design options. Traditionally, ‘rule of thumb’
Jul 11, 2011
-
Role of Environmental Ore Deposit Models in Resources DevelopmentBy Y T. J Kwong
With the recent emphasis worldwide on environmental protection and sustainable development, finding an enriched mineral deposit no longer guarantees mining development. Only if the identified resource
Aug 22, 2011
-
Current Developments in the Operation and Control of AG and SAG Mills in AustraliaBy D Baas, Y Atasoy
With increased pressure for companies to cut costs during design of new mineral processing plants, overall plant design has changed over the last decade with less design for feed blending and less ins
Jan 1, 2008
-
The Path to Best Practice at Geita Gold MineBy M Monaghan, B S. Gregory
The Geita Gold Mine is located 80 km southwest of the town of Mwanza in the north-west of Tanzania and is 100 per cent owned by AngloGold Ashanti Limited. Open pit mining commenced at Geita in 2000. I
Sep 18, 2012
-
Evaporation and Salt Transport Under Variable Climatic ConditionsBy T Baumgartl, B Richards
The association of specific plants and plant communities with soils developed over underlying superficial orebodies and mineralisation has been long recognised. It has given rise to the use of plant i
Jul 10, 2012
-
From Blasthole to Reverse Circulation Sampling – Changing Grade Control Methods at Black Star Open Cut Zinc-Lead Mine, Mount Isa, QueenslandBy B Young
Variable bench heights, interaction with underground workings and a steeply dipping orebody are challenges faced daily by geologists at Xstrata Zinc’s Black Star Open Cut (BSOC) Zinc/Lead/Silver mine
Aug 22, 2011
-
Understanding Overlaps - Mining Tenure Versus the Rest of the WorldIt is a common misconception that the grant of mining tenure, whether it be an Exploration Permit, Mineral Development Licence or Mining Lease, will entitle the holder to access all land within it in
Jan 1, 2007
-
Team Alignment Towards Alternative Project Delivery MethodsProject delivery in our current market is not as efficient as it could be. Industry at large (both client and consultant), is diligently following the engineer, procure, construct, manage (EPCM) or en
Jan 1, 2009
-
Thermal analysis of molten salts and their mixtures with metalsBy S Gezgin, F Beckstein, M Müller, D Rapp, D Sergeev, J Qi, A Lichtinger
Salts and their mixtures play an important role for industrial and energy sectors, eg metallurgy, biomass gasification and combustion, nuclear and solar powerplants and electrochemical processes. Depe
Aug 21, 2024
-
Integrated Planning, Mining and Rehabilitation for Effective Results and Sustainable Land Use - A Western United States PerspectiveBy V Pfannenstiel
The United States (US) coal mining industry has been working under comprehensive planning, operating and rehabilitation regulatory requirements for nearly 35 years. The public desire for environmental
Jul 10, 2012
-
The benefits of automated metallurgical accounting for plant samplingBy D W. Wall, J P. Vagenas
Questions of sampling precision and accuracy affect every process plant in differing ways and to differing extents. To address these perceived issues, chemists, metallurgists and engineers are often a
May 9, 2017
-
A theoretical goaf resistance model based on goaf gas drainage dataBy Y Wang
Inadequate goaf gas control may lead to gas exceedances in the ventilation return air, which will trip power in longwalls and cause production stoppage. To effectively control gas emissions, Australia
Oct 12, 2022
-
Globally Optimising Open Pit and Underground Mining Operations under Geological UncertaintyBy R Dimitrakopoulos, K Kawahata, L Montiel
A method that optimises mining complexes that are comprised of multiple processing destinations, open pits and underground operations is presented. Mining, blending, processing and transportation deci
Nov 24, 2014
-
Jaguar Base Metals Project Case Study – Has Reality Reflected the Study?By R Jacobs
"The Jaguar project is relatively unique in that it was evaluated, financed, built and operated to completion within the last ten years, providing the opportunity to holistically review and reconcile
Mar 8, 2016
-
The Grande Côte Mineral Sands ProjectBy M C. Ackland
The Grande Côte Mineral Sands Deposit (GCMSP) is located on a coastal mobile dune system in Senegal on the west coast of Africa. Senegal is a stable, democratic republic, having gained its independenc
Oct 5, 2011
-
Research on the Shape and Particle Size Distribution of Caved Ore Mass in Sublevel CavingBy G J. Zhang
The shape and particle size distribution of caved ore mass in sublevel caving were investigated in this study. The paper first reviews the main factors affecting the shape and characteristic of caved
Jul 11, 2011
-
3D estimation of variables with complexity in cross-correlation structuresBy N Madani
Linear interpolation of geo-related variables is important to different aspects of mining engineering such as long and short-term mine planning. The ore deposit description attained from spatial model
Nov 21, 2018