Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    KEYNOTE: Back to the Future – Still on the Dark Side

    By P D. Munro

    "This is a reprise of the paper ‘Back to the Future – Why Change Doesn’t Necessarily Mean Progress’ presented to the Tenth Mill Operators’ Conference in 2009. It was observed that the ‘boom and

    Oct 10, 2016

  • AUSIMM
    A Great Project Team - Bringing Together Location and Culture

    By A M. Ebbels, D Pratt

    The current commodities super-cycle has seen an explosion in the number of mining projects demanding human resources throughout the world. The demand for key personnel currently far outweighs the inte

    May 24, 2012

  • AUSIMM
    What category cyclone is devastating your plant?

    By T G. Vizcarra, B Wong

    Optimisation projects are regularly undertaken without knowing the root cause of an issue. It is all well and good to trial a multitude of flotation reagents, change the operating characteristics of y

    Aug 29, 2018

  • AUSIMM
    Inadequate Water Management Planning Resulting in Long-term Closure Liabilities

    By H J. J Boshoff

    Mine closure planning integrated into life-of-mine (LOM) planning during the operational phase consists of many subcategories. One of these subcategories that needs to be fully integrated into the LOM

    Jul 16, 2014

  • AUSIMM
    Mine Road Design and Management in Autonomous Hauling Operations – A Research Roadmap

    By R J. Thompson

    In truck-based hauling systems, the mine haul road network is a critical and vital component of the production process. As such, underperformance of a haul road will impact immediately on mine product

    Nov 22, 2011

  • AUSIMM
    A Mapping-based Approach to Geological Continuity Prediction Using Examples from the Balmat-Edwards-Pierrepont Zinc District, St Lawrence County, New York, USA

    By R H. Knight

    Uncertainty in prediction and modelling of geological (physical) ore continuity in geometrically complex ore deposits is a key risk factor in mining. Reducing geometric uncertainty of hard-boundary or

    Aug 18, 2014

  • AUSIMM
    Project Management for All Seasons ù Financial Risk Mitigation in a Challenging World

    By O C. Aitken

    Mining project developers are committed to taking on all the challenges and obligations of financial risk management. It is interesting that our current models of project finance have not changed mark

    Jan 1, 2004

  • AUSIMM
    Mid Sampling and Reserve Estimation Practice in the Base Metal Orebodies

    The Mount Isa mine in North West Queens- land produces a total of nearly 10 million t/yr from separate copper and silver lead zinc orebodies. Sampling information is mainly obtained from diamond dr

    Jan 1, 1987

  • AUSIMM
    Full Cycle Tailings Management at Fosterville Gold Mine

    By L P. Gray

    "From paving the way in gaining approval for the first metalliferous in-pit tailings storage facility (TSF) in Victoria, to developing a deposition methodology to optimise the storage capacity and pro

    Oct 10, 2016

  • AUSIMM
    The Floatability Characterisation Test Rig as a Pilot Plant for Flotation Testing ù An OperatorÆs Viewpoint

    By J-P Franzidis, M Esvelt, E V. Manla

    The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant that is able to treat up to 2 tph solids. It consists of a bank of six 130 L WEMCO« Smart

    Jan 1, 2003

  • AUSIMM
    Visualisation of calculated thermodynamic properties by integration of FactSage™ with SEM-EDS element maps

    By S Mitra, D O’Dea, N Barrett, T Honeyands, E Copland

    This work describes a novel mapping technique that allows the direct overlay of calculated local phase equilibria on micrographs of the physical system. The technique demonstrated integrates FactSage™

    Jun 19, 2024

  • AUSIMM
    Pacific Highway Upgrade from Tintenbar to Ewingsdale (T2E), St Helena Tunnel

    By A M. Mueller

    St Helena tunnel is the centrepiece of the Pacific Highway upgrade from Tintenbar to Ewingsdale, abbreviated and commonly known as T2E. At the deepest point the twin tunnels run 45 m below the ridge l

    Sep 17, 2014

  • AUSIMM
    Engaging Society about a Potential Mining Future – Concerns and Expectations

    By N Boughen

    This paper synthesises the findings of five studies undertaken by the CSIRO Wealth from Oceans Flagship in 2009-10. This research explores the concerns, expectations, and information needs of a range

    Nov 22, 2011

  • AUSIMM
    Case studies illustrating the role of F-series mine reconciliations in production forecast improvement initiatives

    By S J. Loach

    F-Series reconciliations are formal comparisons of estimates and measurements of ore quantity and quality made at pre-determined points along the mining value chain. F1 is the ratio of ‘Depleted Grade

    Sep 18, 2023

  • AUSIMM
    Equipment Set-Up of Kumera Steam Dryer Plants in Non-Ferrous Metal Smelters

    By I KylmSkorpi, H Mansikkaviita

    The traditional direct-heated drying process has been replaced by the steam drying process in non-ferrous metal smelters, where steam is available from waste heat boilers. Many recent projects have se

    Jan 1, 2008

  • AUSIMM
    Best practice in Multiple Indicator Kriging (MIK) – importance of post-processing and comparison with Localised Uniform Conditioning (LUC)

    By G Zhang, I Glacken

    Multiple indicator kriging (MIK) has been used in the minerals industry for some decades. As one of the non-linear estimation methodologies, MIK has advantages related to resolving multiple or mixed p

    May 24, 2023

  • AUSIMM
    Getting the Most out of Technology to Drive Mine Productivity Improvements

    By K Sommerville, J Parkinson

    "Open pit mines today have more technology and data available. The challenge is to effectively use resources to analyse and identify mine productivity improvements. AMC Consultants Pty Ltd (AMC) has c

    Nov 15, 2016

  • AUSIMM
    Design of Grade Control Sampling Programs for Underground Gold Mines

    By S C. Dominy

    Grade control programs aim to deliver economic tonnes to the mill via accurate definition of ore and waste. The foundation of a successful program is high quality sampling supported by geology and a s

    Aug 22, 2011

  • AUSIMM
    Mathematical Approach for Better Mine Waste Rock Dumping Management

    By Y Li, D J. Williams, E Topal

    A mine waste rock dump does not have any intrinsic value, yet is an inevitable structure in surface mining operations. Since the purpose of mining is to maximise profit, possible expenditure reduction

    Jul 10, 2012

  • AUSIMM
    Is Every Mine a Pilot?

    By G I. Lumley

    ‘Every mine is a pilot’ is an attitude which encourages the mining paradox of optimistic mine plans and equipment under performance; propped up by an environment lacking accountability. The premise th

    Jun 22, 2016