Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geometallurgical Modelling – A Mineral Processor's Perspective

    By A Stradling

    For a geometallurgical program to be successful, linkage must be made between the geologists and geostaticians who understand and model the orebody, the metallurgists who determine the value that can

    Sep 5, 2011

  • AUSIMM
    Non-Parametric Bayesian Learning for Resource Estimation in the Autonomous Mine

    By F Ramos

    Conventional techniques for resource estimation generally involve the laborious analysis of variograms and the specification of parameters for covariance functions. In large deposits, construction of

    Sep 26, 2011

  • AUSIMM
    Blast Engineering ù An Explosive Career

    This presentation is a 20 minute snippet of my professional career, and my progression in the mining industry, from a lazy uni student to an up-and-coming blast engineer in the middle of a mining boom

    Jan 1, 2006

  • AUSIMM
    WaihiÆs 2020 Vision: Part A: The Community's Blue-print

    Gold was discovered at Waihi in 1878. In 1987 the modern Martha Mine opened in the middle of the town of Waihi. Newmont Waihi Gold as the current licence holder has been operating the mine since 2000.

    Jan 1, 2006

  • AUSIMM
    Beyond below-ground geological complexity: Developing adaptive expertise in exploration decision-making

    By M J. Davies, R S. Davies

    Despite increased expenditure, the global discovery rate of world-class ore deposits has been in decline for over a decade (Schodde, 2017). Mineral exploration has traditionally followed an empirical

    Nov 21, 2018

  • AUSIMM
    The value of data – getting it right from the start!

    By S L. Martin, M Wimberger

    The binary indicator coding of assay and lithological data according to a single criterion or multiple criteria is a powerful technique for representing mineralised shapes through the modelling of pro

    Mar 22, 2022

  • AUSIMM
    A new sampler for grain and other free-flowing particulates

    By G J. Lyman

    Sampling of grain for mycotoxins is challenging in that some mycotoxins, such as Ochratoxin A (OTA), have very low permitted levels and the kernels carrying the mycotoxin may be highly localised withi

    May 9, 2017

  • AUSIMM
    A Black Canvas – Planning a Greenfield Coalmine in New South Wales

    By T W. C Stambolie

    Coalmines, like any other mine, generally involve the classic three-staged approach to mining studies; namely concept, pre-feasibility study (PFS) and feasibility studies (Cusworth, 2012). Subsequent

    Jun 28, 2016

  • AUSIMM
    Developing the Ridgeway Deeps Project with an Operations Attitude

    By C Jones

    Ridgeway Deeps is a block cave (BC) located down dip of the operating Ridgeway sublevel cave (SLC) mine. The BC is located approximately 210 m vertically below the lowest SLC level and approximately 1

    Mar 21, 2011

  • AUSIMM
    Simulation as a Tool for Mine Planning

    By J Greberg

    This paper discusses the use of simulation in the mine planning process. A case study on the Newcrest Cadia East project is presented, and the challenges and possibilities for using simulation as a to

    Nov 22, 2011

  • AUSIMM
    Rapid Resource Modelling – A Vision for Faster and Better Mining Decisions

    By P F. Hodkiewicz

    "Our understanding of mineral resources relies on three basic steps: data capture data interpretation model construction. Until recently, all three of these steps required significant time and ma

    Aug 18, 2014

  • AUSIMM
    South-west Ventilation Shaft Project at Newstan Mine

    By D Piason

    Newstan Mine commenced mining operations in 1887 and has since undertaken extensive mining within the Young Wallsend, Great Northern, Fassifern, Borehole and West Borehole coal seams using a range of

    Aug 31, 2015

  • AUSIMM
    Sensible Cost Cutting for Resource Projects

    By D Connelly

    As the resources sector becomes tougher with rising costs and cyclical metal prices, mining companies need to continue to reduce their costs and do more with less. Many new resource projects fail to c

    Aug 8, 2011

  • AUSIMM
    Design for Tunnel Fire Life Safety – Working Together in the New Zealand Context

    By E Claridge

    There are a number of major infrastructure tunnelling projects currently underway or proposed in New Zealand, including construction of new road and rail facilities and the refurbishment of existing r

    Mar 8, 2011

  • AUSIMM
    Two Companies, Three Years, Four Sites, Five Managers and Six Projects in the Life of à

    Leaving the relatively simple life on a uni student and venturing off in to the outside working world is a big step. There are two paths to follow, the æContikiÆ style graduate program where you pick

    Jan 1, 2004

  • AUSIMM
    Guidelines for Selecting Pellet Plant Technology

    By J Bolen, I Cameron, M Huerta, M Okrutny, K O’Leary

    As greater amounts of fine iron ore concentrates enter the marketplace, new investments in iron ore pelletising capacity are inevitable to deliver these concentrates to steel industry consumers. When

    Jul 13, 2015

  • AUSIMM
    HARP Modelling – A New Method of Representing Complex Stratigraphic Deposits

    By P Odins

    Traditionally, stratigraphic deposits have been represented by a large number of gridded surface and product analytical models, related to each other by naming convention. This approach, though suitab

    Aug 22, 2011

  • AUSIMM
    Shifting the Cultural Paradigm for the Prevention of Catastrophic and Fatal Events

    By R Russell

    The relative infrequency of fatalities and other serious events can give them an appearance of being random, of being beyond any reasonable degree of anticipation and prevention. In fact, the vast maj

    Nov 20, 2012

  • AUSIMM
    Theory of Sampling and geostatistics – the ultimate link

    By D François-Bongarçon

    The link between geostatistics and Theory of Sampling (TOS) is examined again in view of new findings made while trying to compare predicted sampling variances and estimated grades (using geostatistic

    May 9, 2017

  • AUSIMM
    Geometallurgical Communication as a Distributed Information System

    By C Moorhead, J Jones

    A common problem in the mining industry is that company geologists can operate in relative isolation to the rest of the company (Jones and Moorhead, 2011). This may result in poor knowledge transfer a

    Sep 29, 2013