    Controlling Blast Related Fumes with Unconventional Explosives

    By J Rock, K Bambrook

    "Hanwha Mining Services was approached by Glencore Coal to provide a series of (trial) demonstration blasts at its Clermont coalmine. The intent of the project was to trial a bulk explosive product th

    Nov 15, 2016

  • AUSIMM
    Improvements in Service Life and Cost Reduction for Gyratory Primary Crushers through Mantle and Concaves Optimisation – A Case Study

    By I Elias, E Moya, S Chaffer

    This paper is based on a case study from a mine site that operates two gyratory primary crushers. These crushers were encountering problems, which included inconsistent P80, reduced liner life tonnage

    Jul 13, 2015

  • AUSIMM
    Effectively Installing and Commissioning Flotation Equipment

    By B Murphy, J L. Heath

    Installation of flotation equipment is a lengthy and intricate process involving conceptual design, detailed design and layout, equipment installation, equipment commissioning and handover prior to th

    Sep 1, 2014

  • AUSIMM
    Geological Modelling and Bench Face Survey to Improve Blasting Fragmentation

    By E Gabriel, J C. Koppe, A Gomes and P Crispim, R Schaarsdmit, I Pablos

    Drill and blast (D&B) is one of the most important production operations in open pit mining. The resulting fragmentation of the D&B reflects in the downstream unit operation. Good fragmentatio

    Aug 24, 2015

  • AUSIMM
    A Paradigm Shift in Underground Raisebore Reamer Removal

    By P Viljoen, A Holland, C Parken

    In the raisebore industry, there are two known methods of removing large diameter reamer heads once the reaming of an underground shaft is complete: 1. Lower the reamer head to the base of the shaft a

    Mar 15, 2021

  • AUSIMM
    A new test method for directional propagation of type-I rock cracks

    By W Y. Guo, L X. Chen, D X. Zhang

    To obtain the rock type-I crack propagation process accurately, a novel fixture is used to make the prefabricated crack of rock propagation along the predetermined direction. In this study, the crack

    Nov 29, 2022

  • AUSIMM
    Raisebore drill string recovery case study

    By M Andrew, D McTiffen, M Adams

    A major Ventilation Upgrade Project commenced at the Fosterville Gold Mine (FGM) in 2017 to service the ongoing ventilation requirements of the underground mining operation. The project consists of th

    Mar 15, 2021

  • AUSIMM
    Discovery of the Corunna Downs Deposits

    By P J. Howard, P Darvall, J H. Mainwaring

    In less than a year, Atlas Iron’s Corunna Downs Project has moved from a new discovery to a substantial resource of high quality in an underexplored greenstone belt. Located approximately 170 km south

    Jul 13, 2015

  • AUSIMM
    The æSmoking GunÆ of Detailed Mine Closure Cost Over-Run - A Review Using Case Studies of the Real Costs Associated with the Demolition and Removal of Infrastructure in Mine Closure

    By A Hutton, C Dick, D Fletcher

    Mine and facility closure planning is a dynamic and rapidly evolving landscape. In this landscape, mining companies and industry consultants are generally good at estimating the associated earthworks

    Jul 10, 2012

  • AUSIMM
    Segmental Tunnel Lining Breakouts and Cross Connection Tunnels – Adelaide Desalination Plant, Australia

    By L Drowley

    The Adelaide Desalination Plant (ADP) draws raw sea water into the facility and returns saline concentrate to the Gulf St Vincent via subsea conduits. This paper describes the detailed design and cons

    Mar 8, 2011

  • AUSIMM
    The Product Quality System at Cliffs Natural Resources – Koolyanobbing Iron Ore Operations

    By A L. Wills

    Cliffs Natural Resources Pty Ltd (Cliffs) operates iron ore mines in the Koolyanobbing region of Western Australia. Ore is mined from three separate hubs and trucked to Koolyanobbing. There it is crus

    Jul 11, 2011

  • AUSIMM
    An effective approach to problem solving and decision-making in safety management

    By A K. B Chigwada

    Mining organisations grapple with the same problems year after year, wasting incredible amounts of time and money. According to estimates from the International Labour Organization (ILO), over one mil

    Apr 16, 2024

  • AUSIMM
    The Primary Framework for the Mechanism of the Mine Reclamation Monitoring in China

    By Y Zhou, Y Liu, J-P Yang, P Wang, K Hu

    "Large-scale mine reclamation has taken place recently in response to the implementation of mining regulations in China. Effective monitoring of the progress of reclaimed land is a critical procedure

    Jul 10, 2012

  • AUSIMM
    Virtual Reality Scientific Visualisation – A Solution for Big Data Analysis of the Block Cave Mining System

    By J Tibbett, A Colebourn, B Hebblewhite, F Suorineni

    The concept of Big Data refers to data sets that are so large, variable and/or complex that traditional data processing applications struggle to integrate the data for effective investigation, analysi

    Nov 4, 2015

  • AUSIMM
    Modelling Open Pit and Underground Production Scheduling in Concert

    By B King

    A large number of mineral deposits contain regions in which it is economically beneficial to extract ore both via open pit and underground mining techniques. Current industry practice lacks an effecti

    Nov 24, 2014

  • AUSIMM
    Process Design Aspects at Bendigo Mining's Gold Operations

    By T E. Hayward, D H. English, S J. Smith

    Gold mineralisation at Bendigo is exclusively associated with quartz reefs, commonly found within or near anticlinal fold hinges. The gold is typically coarse grained (0.5 mm to 5 mm), free milling an

    Jan 1, 2007

  • AUSIMM
    Strategic Decision-making in Mining – Business Optimisation Using Flexible Evaluation Models

    By B E. Hall, D B. Kahler

    "'Optimisation' has become a catchcry among many mining companies looking to tell the market how mining businesses will be improved and shareholder value increased. Consequently, the term 'optimisatio

    Mar 8, 2016

  • AUSIMM
    Integrating Sustainability Principles into Mineral Processing Plant Design

    By G Corder

    Even though most major operating companies in the minerals industry have Board-level endorsed sustainability principles and objectives, design engineers typically have no mechanism that allows them to

    Aug 8, 2011

  • AUSIMM
    Conservation of Effective Efflux Velocity from a Road Tunnel Ventilation Outlet by Varying the Effective Cross-Sectional Area

    By A Bagis

    Road tunnels are an accepted and effective transportation solution in urban areas to mitigate increasing traffic congestion and facilitate improved urban connectivity in a cost effective manner while

    Mar 8, 2011

  • AUSIMM
    Pit Backfilling - Managing Chemically Reactive Mine Wastes and Achieving Rehabilitation Objectives

    By A A. Puhalovich

    The placement of chemically reactive mine wastes in mined out pits (æpit backfillingÆ) is increasingly seen by industry as best practice to manage long-term environmental risks. This is primarily beca