Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Determination of Traces of Tellurium in Rocks by Atomic Absorption Spectroscopy After Volatilization with Synthetic Pyrite

    This method determines tellurium at concentrations down to 0·01 p.p.m., with geochemical accuracy. Tellurium is volatilized from the rock at 800°C in the presence of sulphur from decomposing

    Jan 1, 1969

  • AUSIMM
    Slurry Explosives Underground at Mount Isa Mines Ltd.

    In a field test at Mount Isa Mines Ltd., a system developed by ICI Australia Ltd. for bulk loading "MOLANITE", an ammonium nitrate slurry blasting agent into ring drilled holes of wblcvel op

    Jan 1, 1973

  • AUSIMM
    Development of New Comminution Testing Methodologies for Geometallurgical Mapping of Ore Hardness and Throughput

    Development of New Comminution Testing Methodologies for Geometallurgical Mapping of Ore Hardness and Throughput The emerging discipline of 'geometallurgy' is becoming increasingly recognis

    Sep 13, 2010

  • AUSIMM
    Acid Generating Potential of Waste Rock and Coal Ash in New Zealand Coal Mines

    By A H. Clemens, P Lindsay

    Acid producing potential static tests have been undertaken on sample lithologies from New Zealand coal mines, to rank the lithogies into acid producing waste rock and stable non-acid producing waste r

    Jan 1, 1999

  • AUSIMM
    A Few Observations on Mine Surveying and Surveying Instruments

    The principles of geometry and trigonometry are so continuously used by mining engineers for the purpose of accurately and intelligibly recording their measurements, that the writer is prompted to lay

  • AUSIMM
    Preconcentration at Mt Carbine Tungsten Mine using sensor-based ore sorting

    By R Kroukamp, G Rech

    CRONIMET Australia in cooperation with Speciality Metals International, the mining lease holder of the Mt Carbine Tungsten mine, have demonstrated the preconcentration and processing of large (>12 mil

    Nov 10, 2020

  • AUSIMM
    Study on Mineral Processing of Refractory Copper-Nickel Ore

    Study on Mineral Processing of Refractory Copper-Nickel Ore

    Sep 13, 2010

  • AUSIMM
    Size Separation Pretreatment and Alumina Recovery from Bayer Red Mud

    Size Separation Pretreatment and Alumina Recovery from Bayer Red Mud

    Sep 13, 2010

  • AUSIMM
    Coalmine Pillar Design and Performance during Mechanised Pillar Extraction in India

    By I D. Gregson, A S. Garcia, K M. MacAndrew

    The design work undertaken by Rock Mechanics Technology (now part of Golder Associates (Golder)) has played a major part in successfully establishing mechanised room and pillar working in Indian coalm

    Nov 5, 2014

  • AUSIMM
    Determination of the Structure of the Bulli Coal Seam at Appin Colliery, N.S.W., by the Seismic Reflection Method

    The structure of the Bulli coal seam at Appin Colliery was detailed by the seismic reflection method. This unusual application of the seismic method was possible because there is a reflector near the

    Jan 1, 1965

  • AUSIMM
    Three-Dimensional Modelling of Construction Tolerance in Trapezoidal Segments

    By R Bertuzzi

    This paper presents a three-dimensional analysis of a trapezoidal-shaped segmental tunnel lining for a recent tunnelling project in Sydney. Two- dimensional analyses, hand calculations and equipment s

    Jan 1, 2008

  • AUSIMM
    The Use of Fluvial Gold Morphology in Placer and Primary Source Exploration

    The morphological changes that gold undergoes during transport in gravel-bed rivers are a function of transport distance in particular, as well as bedload material, river gradient and velocity, and be

    Jan 1, 1998

  • AUSIMM
    Government Controls On Mining - How to Encourage Investment by Major Mining and Exploration Companies

    I have spent most of the past 35 years working as an economic geologist in the area of exploration and development of base and precious metals. Most of this period has been as an employee of Trans-Nat

    Jan 1, 1995

  • AUSIMM
    Notes on the Blair Athol (Queensland) Coal-Field

    THE following short paper on the Blair Athol coal-field will no doubt have a twofold interest to members from the fact that its main seam, known as the "Big Seam" of a maximum thickness of 9

    Jan 1, 1918

  • AUSIMM
    Methods of Treatment of McArthur River Mixed Concentrate

    Various steps, and complete sequences, for the recovery of lead and zinc from a mixed sulphide concentrate, high in silica and pyrite, have been tested.Oxidation steps of roasting in air or in a sulph

    Jan 1, 1975

  • AUSIMM
    Contributions from Improved Surface Mine Haulage Road Design, Operation and Management Techniques to Sustainable Development

    Operating well designed and maintained surface mine haul roads is the key to minimising truck haulage costs - in itself a significant component of the total cost per tonne mined. Existing and proposed

    Jun 1, 2010

  • AUSIMM
    Pound Road Quarry: An Example of Sustainable Management

    By A McDowell

    Pound Road Quarry is an alluvial gravel quarry owned and operated by Fulton Hogan Ltd. for the supply of aggregate in Canterbury, and is the largest quarry in the South Island in terms of production.

    Jan 1, 1998

  • AUSIMM
    Notes on Practical Mining in Bendigo

    In undertaking to write a few notes on practical mining in Bendigo, the great quartz mining centre of Victoria, which just now is celebrating its fiftieth anniversary of gold mining, satisfaction must

    Jan 1, 1902

  • AUSIMM
    Removal of Iron Oxides from Bauxitic Ores

    A process was developed, on a laboratory scale, for the removal of iron oxides from Weipa pisolitic bauxite. The technique involves the chemical reduction ofthe iron oxides by carbon, followed by sele

    Jan 1, 1971

  • AUSIMM
    The Physical Basis of Non-Random Breakage in an Iron-Oxide Ore Hosted Copper Gold Ore

    The Physical Basis of Non-Random Breakage in an Iron-Oxide Ore Hosted Copper Gold Ore

    Sep 13, 2010