Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Enhancement of a Process Flowsheet for Recovering and Concentrating Critical Materials from Bituminous Coal Sources Mining, Metallurgy and ExplorationBy A. Noble, R. Q. Honaker, J. Werner
Recovery of rare earth elements (REE) from coal-related resources has recently received significant interest due to supply concerns and their key roles in critical industries and defense-related techn
-
Enhancement of a Process Flowsheet for Recovering and Concentrating Critical Materials from Bituminous Coal Sources Mining, Metallurgy and Exploration (2cb05380-838b-438b-903d-9a26c1191012)By A. Noble, R. Q. Honaker, J. Werner
Recovery of rare earth elements (REE) from coal-related resources has recently received significant interest due to supply concerns and their key roles in critical industries and defense-related techn
-
Medium-Temperature Pressure Leaching Of Copper Concentrates - Part IV: Application At Morenci, ArizonaBy J. O. Marsden
Parts I and II in this series of papers presented the chemistry of medium-temperature pressure leaching of copper sulfide concentrates and reviewed the metallurgical development of a process to effect
Jan 1, 2007
-
Problem of Tunnel Construction in Himalayan Region: An Actual EncounterBy M. D. Khattar
Problems discussed concern encountering of high temperatures [up to 66°C] and heavy flow of water [150 L.P.S] during the construction of the 10.15 MØH.R.T. for the 2500 MW Nathpa Jhakri Hydro Power Pr
Jan 1, 1999
-
Replacing The Stone and Rebuilding the PentagonBy Jim Owens
The methodology of quarrying changed significantly in the Indiana limestone industry in the 60 years between Sept. 11, 1941 and Sept. 11, 2001. The former was the date of the Pentagon groundbreaking
Jan 1, 2005
-
Using Geometallurgical Models To Aid In Metallurgical Testwork For Pre-Feasibility Projects, La Colosa, ColombiaThe La Colosa, Colombia porphyry gold deposit is currently in the pre-feasibility stage. This large deposit has many types of gold mineralization: native gold, electrum, and tellurides. These variatio
Feb 27, 2013
-
Using Administrative Controls to Reduce Tailings – Dam RiskBy G. H. Glos
There was a time when an occasional failure of a tailings embankment was considered an acceptable risk associated with mining activities. This is not the case anymore. A major tailings failure today
Jan 1, 1999
-
Looking Back at the Metal Mines of CornwallBy Thomas A. Simpson
Traveling through the moors and valleys of Cornwall, England, one is reminded of the extensive mining activities of the past. Abandoned shafts, remains of granite block wheel houses and engine houses,
Jan 9, 1981
-
Improved Process Control Through Real-Time Measurement Of Mineral ContentBy D. Hopkins, D. Türler, R. D. Giauque, W. B. Davis, M. Karaca
In a highly collaborative research and development project with mining and university partners, sensors and data-analysis tools are being developed for rock-mass characterization and real-time measure
Jan 1, 2002
-
How Do We Promote Mining? Educate Teachers – They Educate StudentsBy Dan Witkowsky
For the 36th consecutive summer, the Colorado Mining Association Education Foundation and the Colorado School of Mines have sponsored “A Total Concept of the Mining Industry” for kindergarten through
Jan 1, 2004
-
Security of supply, sustainability and resource efficiencyBy J. Geisler
When addressing Germany’s resource supplies, we need to distinguish between those domestically available and imported ones. Resource extraction ostensibly competes with the designation of protection a
Jan 1, 2011
-
Cattle Aid Reclamation at Robinson Mine in NevadaInn mining communities throughout the western United States, cows have always been part of the landscape as they graze on surrounding rangelands. Until recently, mining companies regarded these anima
Jan 1, 1999
-
Seismic Design Measures for the Retrofit of the Claremont TunnelBy Bill Cain, David F. Tsztoo, R. John Caulfield, D. Scott Kieffer
In 1994, the East Bay Municipal Utility District (EBMUD) commenced a system-wide Seismic Improvement Program to protect their facilities from catastrophic damage. A primary focus of this program has b
Jan 1, 2005
-
Ambitious Endeavors in Mechanized Shaft Construction: A Case History of Two Mine Shaft Projects in AustraliaBy John Zeni
In Australia during the 1990s, Zeni Drilling took on several demanding shaft boring contracts. This paper describes the safety, operational, technical and environmental advantages derived through the
Jan 1, 2001
-
Liner System Protects Oils Sands’ Tailings AreaSyncrude Canada produces a large part of Canada’s crude oil supply. The company processes about 225,000 bbl/day. The oil produced is used for jet and automobile fuel, home heating oil, plastics and
Jan 1, 2000
-
Auxiliary Ventilation in Underground MinesBy L. K. Marshall
Last month's engineering fundamentals article discussed some general considerations of underground mine ventilation. This month's article takes a look at auxiliary ventilation-brattice, fans
Jan 2, 1982
-
Tectonic Stress Reconstruction Based on Structural Features in Tectonic Superposition Areas Mining, Metallurgy and Exploration (db46774a-751c-4994-a9c0-cdb544845a1e)By Chen Lin
Tectonic stress is an important parameter for understanding the dynamics of underground engineering and for the exploitation of coalbed methane. Multiple-period structural features usually have comple
-
Tectonic Stress Reconstruction Based on Structural Features in Tectonic Superposition Areas Mining, Metallurgy and ExplorationBy Chen Lin
Tectonic stress is an important parameter for understanding the dynamics of underground engineering and for the exploitation of coalbed methane. Multiple-period structural features usually have comple
-
Field-Scale Investigation Of Pulverized Coal Mill Power ConsumptionTwenty field-scale tests were conducted in a 28 MW pulverized coal power plant in Healy, Alaska, to examine mill power consumption in relation to coal grind size. The intent in this field-scale study
Jan 1, 2008
-
Construction Of Shin-Kanmon Tunnel On Sanyo ShinkansenBy Kazuo Magata, Hirohiko Fujita, Masazumi Tashiro, Yoshiaki Sato, Yoshio Shinoda
The Shinkansen of the Japanese National Railways (JNR) presently in operation between Tokyo and Hakata, approximately 1,000 km, was constructed at three stages: between Tokyo and Shin-Osaka opening in
Jan 1, 1976