Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    DISPATCH Reduces Mining Equipment Requirements

    By J. G. Clevenger

    Introduction Computer-based haul truck dispatching has been operational at Tyrone since May, 1980. The system, known as Dispatch, has accomplished significant productivity gains compared with the for

    Jan 9, 1983

  • SME
    Long Term Behaviour of a Fully Instrumented Test Room in Potash

    By Dennis Z. Mraz, Maurice B. Dusseault

    INTRODUCTION In 1982 and 1983, as part of the mine design program for a New Brunswick potash mine, series of laboratory tests were conducted on potash and salt samples obtained during the mine exp

    Jan 1, 1986

  • SME
    Tenneco's Green River project : Foresight and patience pay off

    By David R. Delling

    Introduction In 1967, Tenneco acquired Kern County Land Co. The primary reason for the acquisition was to obtain Kern's agricultural, manufacturing, and oil interests. Included in the Kern portf

    Jan 10, 1985

  • SME
    Flocculation and Dispersion Studies of Iron Ore Using Laser Scattering Particle Size Analysis

    By S. K. Kawatra, H. Haselhuhn

    "In many mineral processing applications it is necessary to know the isoelectric points of the various minerals in the ore to properly perform flotation and other mineral separations. However, current

    Jan 1, 2015

  • SME
    Full-Panel Screen Testing: More Realistic but what Changes?

    By T. M. Klemetti, T. J. Batchler, T. J. Matthews

    How representative are partial-panel screen tests of the in situ response of screen to roof and rib deterioration and displacements? Can a more representative procedure that tests up to two full scree

    Jan 1, 2019

  • SME
    Electromagnetic Interference with Proximity Detection Systems

    By R. J. Matetic, J. Noll, C. Zhou, J. DuCarme, M. Reyes, J. Srednicki

    "In April 2016, MSHA began requiring the use of continuous personal dust monitors (cPDMs) to monitor and measure respirable mine dust exposures to underground coal miners. After the cPDM’s implementat

    Jan 1, 2017

  • SME
    High-resolution AUV-surveys of a sediment-covered massive sulfide occurrence in the Mediterranean Sea

    By Isobel Yeo, Luca Cocchi, Sven Petersen, Nico Augustin, Sean Plunkett, Ingo Klaucke

    Exploration for seafloor massive sulfides is currently mainly focused on investigation for active hydrothermal vent fields. However, most of the resource potential is thought to be related to inactive

    Sep 1, 2014

  • SME
    Final Tunnel Liner At The Mill Creek 3 Project

    By M. Schafer

    The 6-m- (20-ft-) diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT3) has been completed. This article summarizes aspects of liner design and ad-dresses the construction a

    Jan 1, 2008

  • SME
    Design of Large and Shallow Caverns of New York Second Avenue Subway

    By Verya Nasri

    The proposed Second Avenue Subway Project in New York City is approximately 8.5 miles long, up to a depth of 120 feet beneath grade and runs the length of the eastern side of the island of Manhattan f

    Jan 1, 2008

  • SME
    Crisis Management: What To Do If Disaster Strikes

    By Joseph J. Zaluski, J. Steven Gardner, Marco M. Rajkovich

    The telephone rings at 3:20 a.m. An exasperated voice on the other end says, “There has been a mine explosion at Mine No. 5 and we have not heard from three units of men.” Twenty-three minutes later

    Jan 1, 2004

  • SME
    Engineering Geology Of The Mica Underground Powerplant

    By Douglas D. Campbell, Alan S. Imrie

    INTRODUCTION Mica Dam is located on the Columbia River just downstream of the "big bend" of the Columbia, where it leaves the Rocky Mountain Trench and begins to flow southwards, approximately 85 m

    Jan 1, 1976

  • SME
    Microcomputer Analysis Aids Continuous Mining Productivity at Tanoma

    By Scott G. Britton

    Microcomputeranalysis has long been a technique for engineering professionals to improve the theoretical and practical design of continuous mining systems. Such work has been typically composed of mod

    Jan 1, 1991

  • SME
    Longwall-Induced Ground Movement at a Shale Gas Well Site Located in a District Barrier Pillar—FLAC3D Modeling Results and Interpretation

    This paper evaluates the effect of longwall mining on a cluster of unconventional shale gas wells located in a district barrier pillar between a current longwall panel and the future panel north of th

    Jan 7, 2020

  • SME
    Planning And Preparation For Tunneling At Brightwater West

    By Mina M. Shinouda

    Brightwater West (BT4) represents the state of the art in utility tunneling, namely a long relatively small diameter, soft ground tunnel, with no intermediate shafts, under significant groundwater pre

  • SME
    Evaluation Of Smoke Detectors For Use In Underground Mines - Preprint 09-072

    By C. D. Litton

    Laboratory experiments were conducted to determine the responses of a prototype smoke detector and a commercially available photoelectric smoke detector to smoke particles generated from various combu

    Jan 1, 2009

  • SME
    Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and Exploration - Springer

    By Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer

    Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph

  • SME
    Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and Exploration

    By Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer

    Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph

  • SME
    Cemented Rock Fill System Design And Application In Leeville Underground Mine

    By C. Sun

    The Leeville underground mine has been in operation since 2006 and currently produces 3,500 tons of ore per day with an average gold grade of 0.34 opt. The mine has a large horizontal extent of 2,500

    Jan 1, 2011

  • SME
    Mechanized Mining of Narrow Veins – Problems and Equipment Options

    By Jacek Paraszczak

    Numerous problems encountered in the mining of narrow vein deposits challenge the productivity, competitiveness and profitability of many mines. Mechanization of mining operations is one of the most i

    Jan 1, 1992

  • SME
    Eskay Creek Mine And Mill – A Continued Success

    By G. Biles, K. Loughran, R. Anand

    The Eskay Creek Mine, a high-grade gold and silver underground mine in northwestern British Columbia started operations in late 1994. For the first three years of operation, ore was crushed to minus

    Jan 1, 1999