Field Trials for Deep Mixing in Land Remediation: Execution and Early Age Monitoring, QC and Lessons LearntBy Ziyad Abunada, David O’Connor, Abir Al-Tabbaa
"Abstract Contaminated land remediation using soil mix technology (SMT) is a relatively recent development which has been shown to be a cost effective and versatile system with numerous environmental
Jan 1, 2014
-
Assessing the Bearing Capacity of Existing Wood Pile FoundationsBy Almer E. C. van der Stoel
"Abstract This paper deals with assessing the bearing capacity of existing wood pile foundations. With a wide range of restoration projects being performed in the Netherlands, on many locations deep e
Jan 1, 2014
-
Settlement & Vibration Monitoring For Transmission Line Foundation Installation: A Case HistoryBy R. Heath Forbes
The route of a new, 4-mile long, electrical transmission line passed through residential neighborhoods and commercial areas of a small town in the South Carolina Coastal Plain. The new line consisted
Jan 1, 2011
-
Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering TechniquesBy Mazin Adnan
The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e
Jan 1, 2008
-
New Concepts For CFA (Auger Cast) Pile Controle - SynopsisBy Shachar Magali
This article describes two new concepts regarding the CFA (Auger Cast) piles. The first one, MALI Effect, is an approach to control the casting phase, while the second one, NETA Shear, is a technique
Jan 1, 2000
-
Site Solutions For The Pisa Tower Remediation - 1 - IntroductionBy Paolo Heiniger
The aim of this paper is to present the operative solutions devised and then adopted to implement the underexcavation (soil extraction) of the Tower of Pisa, by means of soil extraction. The inter
Jan 1, 2000
-
Pile Load Testing Of Helical Piles And Driven Steel Piles In Anchorage, AlaskaBy Mohammed Sakr
The use of helical piles for permanent foundation applications has become a practical and feasible alternative to the traditional cast-in-place concrete or driven steel piles. Research and development
Jan 1, 2009
-
Revitalizing Hillside Using Stabilization Piers Monitored By 3-D Mems-Based InclinometersBy Peter Chou
A total of 117 slope stabilization drilled piers were installed as part of a major hillside revitalization project. The 110-million dollar development, known as Stratford at Kenwood, included an 18-st
Jan 1, 2009
-
Woodrow Wilson Bridge Cofferdams (ef6ed0b3-5c8c-41f1-8337-00ee57bff823)By Roderic A. Ellman
The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.
Jan 1, 2013
-
Design and Construction of the Summit Senior Care Facility into the Side of an Unstable California HillsideBy Patrick O. Shires, Harry W. Schnabel
With stable building sites becoming scarce in the greater San Francisco Bay Area, the new Summit Senior Care Facility is being built into the side of an unstable hillside adjacent to the San Ramon Reg
Jan 1, 2018
-
Ground Support for Shafts and Underground Construction Using Artificial Ground Freezing – Sophia Spoortunnel Rotterdam (Nl) – Cern Geneva (CH) – Leipzig (DE) – Berlin (DE)By Helmut Hass, Marco Ziller
"Abstract: 1 Sophia Spoortunnel Marco Ziller, Trevi S.p.A.:For the construction of 14 cross passages connecting the twin tunnels of the Sophiaspoortunnel the Artificial Ground Freezing technique was a
Jan 1, 2014
-
Excavation Support At The Capitol Visitor Center In Washington DCBy Harald Ludwig
In 2002, excavation support work commenced on the Capitol Visitor Center project located adjacent to the nation?s Capitol building in Washington, D.C. The outlying work (Slurry Wall Work at Main Site
Jan 1, 2006
-
6000 Ton Osterberg Load Test Reduces Foundation Costs For Delaware River TramwayBy Aly M. Mohammad
The Delaware River Tramway will link civic and retail developments in Philadelphia, Pennsylvania and Camden, New Jersey. Twin 300-foot towers will anchor the cables at either side of the river. Four h
Jan 1, 2002
-
Case Study: Innovative Soil Nail Stabilization Of A 100 Foot High Urban SlopeBy Mike Fabius
The Lakehead Region Conservation Authority is responsible for slopes along the Kaministiquia River, one of the largest tributaries to Lake Superior in Canada. After arresting toe erosion for a mile o
Jan 1, 2006
-
Data Normalization and User Interface Design for the Nevada Department of Transportation Deep Foundation Load Test DatabaseBy Austin Metz, Kevin Stanton, Ramin Motamed
"A recent study calibrated Load and Resistance Factor Design (LRFD) resistance factors for local soil conditions in the Las Vegas Valley. As a part of this calibration, an extensive database of drille
Jan 1, 2017
-
In-Situ Permeability Testing For Cement-Bentonite Cutoff Wall ? Lessons LearnedBy François G. Bernardeau
Cement-bentonite (C-B) slurry walls have been used for ground water cutoff in deep excavations, contamination containment, and other applications. Hydraulic conductivity is of great concern for cement
Jan 1, 2008
-
Deep and Extra Deep Diaphragm Walls in Shanghai – Increasing Demand for Infrastructure in Megacities Drives the Requirement of Increasing Depth for Diaphragm WallsBy Wu Jie Mei, Li Yao Liang, Franz-Werner Gerressen, Arthur Bi
Diaphragm walls (D-walls) are known as underground structural elements commonly used for retention systems and permanent foundation elements. In addition, they are also quite often used as deep ground
Jan 1, 2018
-
High Capacity Rock Anchors At The Bear Mountain BridgeBy Frederick C. Rhyner
This paper describes the design and construction of two high-capacity rock anchors to restrain a supplementary backstay for the Bear Mountain Bridge, which is a suspension bridge spanning the Hudson R
Jan 1, 2010
-
Foundation Retrofitting Using Micropiles - A Case HistoryBy Mohammad Nasim
Vertical expansion of existing structures frequently requires foundation retrofitting to enhance the capacity of existing foundations for supporting additional loads. Owing to their small diameter, a
Jan 1, 2008
-
First Quality Tissue Plant, Lock Haven, Pennsylvania: A Case Study Of Drilled Displacement Dewaal Piles ? IntroductionBy Gordon King
The site of the First Quality Tissue plant is located on a previous paper production facility in Lock Haven, Pennsylvania. The new development, which included the construction of a tissue machine buil
Jan 1, 2004