Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pile Settlement Design Using Continuous Surface Wave Testing and Modulus Degradation (9593f752-8bd1-4766-938c-27b4baad33f2)
By Hennie F. T. Barnard, Theodore E. B. Vorster
Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me
Jan 1, 2017
-
Excavation Support by Deep Soil Mixing- Challenges on Depth and Long Term Exposure
By D. Barber, A. D. Miller, P. A. Bray
The project was to develop an area within the existing West County Wastewater Treatment Plant which would enable the construction of a new Raw Wastewater Pump Station (RWPS) with a footprint of approx
Jan 1, 2017
-
PSC Piles Overcome Challenges for $650m Power Plant
By Tim Siegel, III Fondren, Billy Camp
"INTRODUCTIONThe new $650 million power block at Santee Cooper’s Cross Generating Station in Cross, South Carolina is being constructed on driven pre-stressed concrete (PSC) piles. S&ME, as geotechnic
Jan 1, 2004
-
Deep Excavation By Controlled Rock Blasting Considering Ground Condition And Nearby Structures In Ug Metro Station – A Case Study
By P. K. Ray, Sudip Kumar Koley, Sainath M. Reddy, Devulapalli L. S Rasagna
Bangalore Metro Rail Project- phase II is one of the technological challenging project, particularly construction of underground metro rail system. The Bengaluru city is very congested area and connec
Sep 1, 2022
-
“Borehole Stabilization” For Deep Excavation, An Essential Part In Bored Piling / Diaphragm Wall Construction
By Thomas Domanski
Any type of deep excavation whether for Bored Piling, Diaphragm Walls or Contiguous Bored Piling Walls depends on forming a stable borehole with a defined cross-section to receive safely the permanent
Sep 1, 2022
-
Deep Foundations on Buildings using Driven Ductile Iron Micropiles.
By Antonio A. Cristóvão, Alexandre Pinto
"Abstract Deep foundations of buildings using driven ductile iron micropiles TRIM solutions, leads to recognized advantages, from technical, schedule and economic points of view. High production rate
Jan 1, 2014
-
Continuous Flight Auger Piles In The Blue Ridge: A Case Study Using Instrumentation In Pile Design
By Jesse R. Jacobson
A large casino complex in Cherokee, North Carolina recently underwent a $633 million expansion that involved substantial foundation challenges. The site is located in a valley on the southern edge of
Jan 1, 2011
-
Bridge Pier Remediation, New London CT
By Walter Kaeck
In a recent upgrade of their system, Amtrak converted a bascule type draw bridge over the Thames River to a vertical lift structure supported by the existing piers. During the bridge replacement, sign
Jan 1, 2009
-
Installation of 10 Feet Diameter CIDHs in Soft Clay Using Rotator/Oscillator on Trestle
By Babak Mamaqani, Pirooz Barar
The Moanalua trestle spanned over Moanalua Stream, Honolulu, HI and was designed to accommodate construction of five 10 feet diameter cast in drilled hole (CIDH) piers as a part of Honolulu Authority
Jan 1, 2019
-
Suction Bucket Installation
By Avi Shonberg
With the advancement of offshore wind farm projects towards deeper waters and larger wind turbine generators, founda- tion solutions other than the monopile have received increasing attention over the
Jul 1, 2022
-
Mobilised Shear Strength on the Failure Surface of 2D Belled Anchor Model Piles under Uplift in Cohesionless Soil
By Tanaya Deb, Sujit Kumar Pal
"Experimental investigations are carried out on failure pattern around 2D models of belled anchor piles in dry sand bed of density 15.60 kN/m3 under uplift. The models are having thickness ratio (Ts/T
Jan 1, 2015
-
Mobilizing CIDH Pile Base Resistance on the Gerald Desmond Bridge Replacement Project with Tip Grouting
By Adam Zagorski, Rusty Lucido, Curt Scheyhing
"The current California Department of Transportation (Caltrans) practice based on AASHTO LRFD Bridge Design Specifications is to use the O’Neill and Reese method (FHWA, 1999) for calculating the side
Jan 1, 2017
-
Lateral Response of Pole on Engineered Driven Timber Pile Footing at Ararat Windfarm Terminal Station
By Frank Albrecht, Brian McCarthy
"The Ararat Terminal Station (ARTS) is located 190km to the north-west of Melbourne, approximately 1.7km to the north of Elmhurst Township in the Pyrenees region of western Victoria, Australia. The si
Jan 1, 1900
-
Multiple Foundation Systems For The Porter Street Outfall Relocation For The North Approach - Summary
By William D. Spielvogel
The Massachusetts Highway Department awarded the Porter Street Outfall Project to the J.M. Cashman Company in November 1991. Timely completion of the Project in one and one half years is critical to t
Jan 1, 1994
-
Seismic Analysis Of Drilled Shafts As Earth Retaining Structure Based On Site Characterization
By Bernardo J. Jiménez Vega, Edy L. T. Montalvan
During the last phase of the Circunvalacion Norte project in San Jose, Costa Rica, preliminary designs for an underpass structure of over 16 km (10 miles) considered drilled shafts as an earth retaini
Oct 1, 2022
-
Secant Pile Walls - A Consistent Approach to Risk Management
By Vivian M. Troughton, Clifford J. Wren, Tony P. Suckling
"Secant pile walls are used for the construction of deep basement walls and earth retaining structures. Risk associated with secant pile walls is commonly perceived as being the safety of site personn
Jan 1, 2005
-
Case Study: The Use Of Post Tensioned Piles For Wind Turbine Foundations
By Amr Sallam, Ahmad Mohamed, Mohamed Alrowaimi
Renewable energy, in the form of wind and solar, has emerged as main source of energy in the modern society. The wind industry has substantially grown over the last two decades to become a key player
-
The Use of Bentonite in Underground Construction
By Hector Simchas
"1. BENTONITE: THE CRUCIAL CONSTITUENT OF SLURRYSuspensions of bentonite and water are used in a variety of applications in underground engineering. For the construction of underground elements like s
Jan 1, 2015
-
Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control ? Introduction
By Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is
Jan 1, 2004
-
Amsterdam North South Line Metro - Construction Of Deep Diaphragm Walls For Three Underground Stations.
By Theo. A. M. Salet
The historic centre of one of the most beautiful cities in Northern Europe -Amsterdam - is being excavated to accommodate the new North/South metro line. This new line is due for completion in 2012, a
Jan 1, 2006