Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Masbate gold operation is site of first commercial heap leaching plant in PhilippinesBy Libby R. Ricafort, Victorio V. Pato, R. S. Pizarro
Introduction Atlas Consolidated Mining and Development Corp. (ACMDC) started gold production at its Masbate gold mine early in 1980. This involved an open-pit mine and a 3.5-k/d (3850-stpd) carbon-in
Jan 9, 1987
-
Support / Aide Et SoutienIf you have problems or questions relating to the installation of this disc, please either telephone Document Transformation Technologies at (+27 12) 667 2074, or e-mail: nigel@doctech.co.za Si
Jan 1, 2004
-
The effects of ventilation controls and environmental cabs on diesel particulate matter concentrations in some limestone minesBy J. D. Doll
MSHA has promulgated a rule to limit the exposure of underground metal/nonmetal miners to diesel particulate matter (DPM). In May 2008, the final personal exposure limit will be lowered to 160 µg/m3 t
Jan 1, 2009
-
Modelling Physico-Chemical Properties Of Melts And Kinetics Of Coal-Slag ReactionsBy D. Xie, S. Sun
An overview of recent development of CSIRO?s Multi-Phase reaction models will be presented with examples comparing the calculated physico-chemical properties of metallurgical slags with the existing e
Jan 1, 2004
-
Planeamiento de minas a cielo abiertoBy Kenneth R. Johnson
El presente trabajo describe los factores que incluyen el proceso de planeamiento de la mina. Dado el tamaño y forma de los minerales encontrados en un mina de Estados Unidos, se inició el sistema de
Aug 20, 1963
-
RI 5938 Studies Of The MnO-SiO2 Binary System - SummaryBy E. L. Singleton
This Bureau of Mines investigation was initiated to study and establish some of the chemical and physical characteristics of the condensed Mno-Si02 system. To prevent oxidation of the manganous ion, I
Jan 1, 1962
-
Accounting for Dilution in Ore Resource EstimationBy Mario E. Rossi
The full economic evaluation of a mining project requires a block model that provides an estimate of the tons and grades of available resources. The model must be representative of the mineralization
May 1, 2009
-
Study On Preparing Ti6Al4V Alloys From V-Ti Bearing Beach PlacersBy Huimin Lu, Zegao Sun, Zhijiang Gao
The traditional Ti6Al4V alloys were obtained by the smelting reduction of V-Ti bearing beach placer by rotary hearth furnace and aluminothermic reaction in laboratory. First, it gets he lp from combin
Jan 1, 2016
-
Exhaust Dust Control in Dry Percussion DrillingThe paper relates to the laboratory and pilot plant studies that have been carried out by Sherritt Gordon Mines Ltd., Metallurgical Research Div., in developing the ammonia pressure leach process for
Jan 3, 1955
-
Mineral Commodity Summaries 1980 - An Up-To-Date Summary Of 91 Mineral Commodities ? Aluminum1. Domestic Production and Use: In 1979, 12 companies operated 32 primary aluminum reduction plants, with 3 firms accounting for 64% of production. Washington, Oregon and Montana accounted for 32% of
Jan 1, 1980
-
IC 9184 Mine Drainage And Surface Mine Reclamation Proceedings Of A Conference Sponsored By The American Society For Surface Mining And Reclamation, The Bureau Of Mines, And The Office Of Surface Mining Reclamation And Enforcement.Mine waste and mine reclamation are topics of major interest to the mining industry, the government and the general public. This publication and its companion volume are the proceedings of a conferenc
Jan 1, 1988
-
MLA 25-83 - Mineral Investigation Of The Cactus Springs Rare II Area (No. A5188), Riverside County, California ? SummaryBy Lucia Kuizon
The Cactus Springs Roadless Area Review and Evaluation (RARE II) study area (No. A5188) comprises 12,800 net acres (5,180 ha) in San Bernardino National Forest in west central Riverside County, Califo
Jan 1, 1983
-
Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora ProjectBy H. Boghosian
This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w
Jan 1, 2006
-
OFR-102-85 Satellite Monitoring For A Coal Waste EmbankmentBy F. J. Prokoski
The COALSTAR Project, which operated from November 1981 to December 1982, was a research and development project aimed at providing a reliable and inexpensive means of monitoring various waste site co
Jan 1, 1984
-
IC 7963 Mining Methods And Costs, Schwartzwalder Uranium Mine, Jefferson County, Colo. ? SummaryBy J. H. Soulé
This information circular is one of a series published by the Federal Bureau of Mines describing methods and costs at various mining operations. The Schwartzwalder uranium mine, situated about 20 mile
Jan 1, 1960
-
Papers - Beneficiation of Iron Ore (Round Table)Large deposits of manganiferous iron ores, representing several million tons of metallic manganese, occur in the United States. The Minnesota deposits of such ore are of outstanding importance because
Jan 1, 1930
-
OFR-18-81 Preliminary Design And Cost Estimate For A Field Worthy Simple Featured MMRDM Based On A Prototype Beta Attenuation/Filter Tape System Developed Under Contract Number H0166097By Pedro Lilienfeld
This report presents a design and cost investigation for several alternative versions of a field-worthy mining machine-mounted respirable dust monitor. Three main design variations are considered: (a)
Jan 1, 1980
-
Late Metamorphic Structural Zones in the Otago Schist: Prospective Hosts for Gold MineralisationBy M Begbie, R J. Norris, D J. MacKenzie
The Otago Schist is crossed by numerous deformation zones that formed in the latter stages of metamorphism and uplift of the metamorphic belt. These deformation zones are long (tens of km) linear feat
Jan 1, 2005
-
The Contest On The Prediction Of Capacity Of A Bored Pile Constructed Under Polymer-Based Slurry In Bangkok SubsoilBy Narong Thasnanipan
This paper presents the outcome of the contest on the prediction of the static axial load capacity of diameter 1.20m bored pile founded at 46m below existing ground. The test pile was constructed by w
Jan 1, 2006
-
Design and wear of SAG mill shell liners at Brunswick mineBy C. Larsen, I. Orford, L. Strah, M. Renaud, P. Radziszewski
"An AG/SAG mill was commissioned at the Brunswick mine concentrator in October 1998. This paper discusses the original shell top hat liner design for the bi-directional AG/SAG mill, observed liner wea
Jan 1, 2005