Search Documents

  • NIOSH
    OFR-31-76 Metallic And Nonmetallic Mining In The United States - A Hazard Analysis

    By Y. P. Chugh

    This is the final report of a study done by IIT Research Institute for the Bureau of Mines to identify the problem areas and technological inadequacies in noncoal (metal, nonmetal, stone, and sand and

    Jan 1, 1974

  • NIOSH
    Water-Powered Scrubber For Auger Miner Dust Control ? Objective

    Capture airborne respirable dust generated by an auger-type continuous mining machine to reduce workers' dust exposure. Approach Install a water-powered scrubber system, operating at 1,400

    Jan 1, 1989

  • AUSIMM
    Pelletising performance of Western Australian ultra-fine magnetite concentrate and strengthening technique by optimising ore matching

    By X Hu, C-C Yang, J Pan

    In this work, preheating and roasting tests of pellets made from blends of Western Australia ultra-fine (WAU) magnetite concentrate and Chinese domestic magnetite concentrate or Brazilian hematite con

    Jul 24, 2017

  • SME
    OCHRE ? A Natural Iron Oxide In The Colored Pigment Market

    By S. D. Bearden

    Color enhances expression and communication in all physical objects experienced in life. Pigments provide color and in some applications have a specific additional function. Natural iron oxides are wi

    Feb 27, 2013

  • CIM
    Early Age Development of Cemented Paste Backfill

    By D. Simon

    This paper studies the effect of binder type and content on the early age development of cemented paste backfill (CPB). The early age development of the mixtures is analyzed using scanning electron mi

    May 1, 2007

  • NIOSH
    IC 8044 Cost Accounting And Control At Calumet Division, Calumet & Hecla, Inc., Calumet, Mich. ? Summary

    By B. C. Peterson

    Calumet Division, Calumet & Hecla, Inc., whose operations are in Houghton and Keweenaw Counties, Mich., is a highly integrated and complex organization. This division operates mines, a railroad, a con

    Jan 1, 1962

  • DFI
    Determination Of Pile Lengths Under Existing Structures

    By Mohamad Hussein

    Low strain dynamic tests are performed to evaluate the structural integrity of driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed b

    Jan 1, 1992

  • SME
    Growing Greener: A Watershed Approach

    By D. C. Hogeman

    Growing Greener is the single largest investment of state funds in Pennsylvania’s history, allocated to address the Commonwealth’s critical environmental concerns. Signed into law by Governor Tom Rid

    Jan 1, 2002

  • NIOSH
    OFR-115(1)-78 Study Of Mine Fires And Mine Ventilation - Part I - Computer Simulation Of Ventilation Systems Under The Influence Of Mine Fires - Summary

    By Rudolf E. Greuer

    The existing computer programs for the simulation of ventilation systems under normal ventilation conditions are reviewed and a suitable program for including the influence of mine fires is selected.

    Jan 1, 2011

  • SAIMM
    The Influence Of Increased Air Flow On The Spatial Variation Of Iron Sinter Quality

    The aim of this investigation was to study the influence that varying production rates have on iron sinter quality. This was done by performing sinter pot tests at different pressure drops over the si

    Jan 1, 2003

  • DFI
    Case Study: MGM Casinonational Harbor, Washington, DC Displacement Cast-In-Place Piles in Coastal Plain Soils

    By Karl A. H iggins, James P. Racine

    "Displacement Cast-in-Place (DCIP) piles are not a common deep foundation type in the Washington, DC Metro Area market. As a result, less regional data is available for these foundations compared to o

    Jan 1, 2017

  • NIOSH
    Bulletin 176 Recent Developments in the Absorption Process for Recovering Gasoline From Natural Gas

    By W. P. DYKEMA

    This report gins the results of a study conducted hy the Ilnreau of Mines for the purpose of informing the petroleum industry on the recent progress in the de,·elopment nncl application of the absorpt

    Jan 1, 1919

  • AUSIMM
    Processing Strategies for Hidden Valley Operations

    By J Watt

    The Hidden Valley Gold Project is located in a remote and mountainous area of the Morobe Province approximately 30 km south of the township of Bulolo and approximately 90 km south-southwest of the pro

    Jan 1, 2009

  • CIM
    The Weird World of the Nanoscale

    By Michael B. Cortie

    The young field of nanotechnology has as its objective the design and construction of useful devices made of nanoscale materials. Objects or structures which have at least one important dimension in t

    Oct 1, 2003

  • DFI
    Static Alternating Cyclic Horizontal Load Tests On Driven Steel Pipe Piles Of Foundations For Highway Bridges

    By Kouichi Tomisawa

    Two bridges were constructed for extension work of Central Hokkaido Connection Road in 2005 at two different sites. Pile group foundations were employed for the foundations of abutments of the two bri

    Jan 1, 2006

  • NIOSH
    RI 4903 Some Characteristics Of The Earth As A Conductor Of Electric Current

    By M. C. McCall

    When electric current of any appreciable magnitude flows from a power line into the earth, a change sometimes takes place in the conditions of resistivity immediately surrounding the electrode or medi

    Jan 1, 1952

  • ISEE
    Reliability of Timing Sequence Network for Multiple Blast Holes

    By Lifeng Li, Jhon Silva-Castro

    In a previous work, the authors analyzed the overlapping probability of two adjacent charges in a single hole for pyrotechnic and electronic detonators. This document extends such work to a complete m

    Jan 1, 2016

  • ISEE
    Smooth Blasting with the Electronic Delay Detonator

    By Yoshiharu Tanaka, Toshiyuki Ichijo, Masaaki Yamamoto

    We utilized electronic detonators (EDs) to investigate the effect of high detonator delay accuracy on overbreak, remaining rock damage, and surface smoothness, in comparison with that of long-period d

    Jan 1, 1995

  • NIOSH
    OFR-68-84 Improvement Of On-The-Job Training Procedures Through Utilization Of Modeling, Imitative And Other Learning Techniques

    By Paul E. Loustaunau

    This report describes a project in which three structured underground coal mine equipment operator training programs were developed. The project was carried out in two parts. In the first part, a rese

    Jan 1, 1983

  • SME
    Dispute Review Boards -- Current Status And Recommendations

    By Robert M. Matyas, P. E. Sperry, Robert J. Smith, A. A. Mathews

    INTRODUCTION The first Dispute Review Board (DRB) was utilized on a tunnel project 20 years ago. Increasingly utilized on a wide range of construction projects, DRB's are becoming the norm on

    Jan 1, 1995