Search Documents

  • AIME
    Some Important Factors Controlling the Crystal Macrostructure of Copper Wire Bars

    By L. H. DeWald

    During the examination of various commercial brands of copper wire bars, which had exhibited different degrees of adaptability for being drawn into fine gages of wire by the present-day high speed mac

    Jan 1, 1931

  • SME
    Evaluation Of Dust Exposures Associated With Mist Drilling Technology For Roof Bolters

    By T. W. Beck

    Overexposure to respirable dust remains a widespread health hazard to roof bolter occupations in underground coal mines. Recently implemented mist drilling technology was evaluated for its effectivene

    Jan 1, 2008

  • AIME
    Reservoir Engineering – Laboratory Research - The Effect of Temperature on the Permeability Ratio of Different Fluid Pairs in Two-Phase Systems

    By L. B. Davidson

    The petroleum literature contains many reports on the relative permeability properties of porous media. However, only recently have studies of relative permeability at elevated temperatures been made.

    Jan 1, 1970

  • SME
    Queens Bored Tunnels, East Side Access, New York

    By David Smith, Bernie Martin

    The Queens Bored Tunnels consist of 11,000 feet of 19'-6" inside diameter tunnels mined through rock, mixed face and dense glacial till, constructed with bolted gasketed one pass reinforced concr

    Jan 1, 2005

  • SAIMM
    Important Considerations In The Testing Of High-Density Tailings For Beach Profile Prediction ? Synopsis

    By G. I. McPhail

    The authors have conducted several investigations into the prediction of the beach profile of high-density tailings and have found that there are a number of important considerations that need to be t

    Jan 1, 2012

  • ABM
    Cost Reduction And Better Quality Control By On-line Roughness Measurement During Continuous Strip Processing - Sorm3plus

    By Anderson Pereira

    SORM 3plus (SORM = Superfast Optical Roughness Measurement) is a system enabling online measurement of roughness parameters during continuous strip processing. Increased requirements for new materials

    Oct 8, 2019

  • SME
    The Factorial Model As A Way Of Thinking About The Results Of A Multi-Factor Lab Experiment Or Plant Trial

    By F. Bruey

    The Factorial Model Experimenters are often interested in systems that are multi-factorial. A multi-factorial system is one whose output is believed or known to be dependent on the particular setti

    Jan 1, 2007

  • DFI
    Extrapolation of Unit Side Resistance in Drilled Shaft Foundations Based on Bi-Directional Load Test Data

    By Ramin Motamed, Joseph A. W. Toth

    Evaluation of the capacity of large-diameter drilled shafts using current load test methods present challenges when considering the magnitude of loads required to fully mobilize their capacities. Ofte

    Jan 1, 2018

  • SME
    Industrial Minerals 2004 – Talc and Pyrophyllite

    By G. P. Tomaino

    Talc is a layered, hydrous magnesium silicate mineral. It has a soft, soapy feel and typically a smooth texture. Talc is also known for its insulation, heat resistance, chemical stability, oil absorpt

    Jan 1, 2005

  • SME
    Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration (444ce330-9c49-45a1-9758-2c54438ceb81)

    By · J. B. Boisvert, O. Leuangthong, T. Acorn

    Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin

  • SME
    Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration

    By · J. B. Boisvert, O. Leuangthong, T. Acorn

    Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin

  • SME
    Construction of the Powerhouse Cavern for the Pumped Storage Scheme Kops II in Austria

    By Helmut Westermayr, Michael Tergl

    DESCRIPTION OF PROJECT Geographic Setting The Kops II plant is a pumped storage scheme of the hydroelectric power producer ‘Vorarlberger Illwerke AG’ which is currently under construction in t

    Jan 1, 2007

  • AUSIMM
    The Uses of Electricity in Mining with Special Reference to the Electrical Operations at Mount Morgan

    That electricity is an important and valuable agent, the limit of whose capacity for utilisation is as yet unknown, is a truism; although enormous advances have been made, the possible developments ar

  • DFI
    Video Inspection Of Rock Sockets For A Piling Project

    By Ali Ameli

    Design loads are limited for piles relying upon toe stresses in rock due to uncertainty about the rock quality over the whole pile diameter because of rock mass properties or construction effects. Th

    Jan 1, 2006

  • DFI
    Sonic Drilling Offers Quality Control And Non-Destructive Advantages To Geotechnical And Construction Drilling On Sensitive Infrastructure Sites

    By John P. Davis

    The use of conventional, circulatory air rotary and fluid rotary, cased and uncased drilling methods in the vicinity of sensitive infrastructure can have deleterious effects on the ground conditions s

    Jan 1, 2006

  • CIM
    Characteristics of Mineralization at the Main Zone of the Clarence Stream Gold Deposit, Southwestern New Brunswick, Canada: Evidence for an Intrusion-Related Gold System in the Northern Appalachian Orogen

    By K. G. Thorne, L. J. Cabri, L. R. Fyffe, D. R. Lentz, D. Hoy

    "Mineralization at the Main zone of the Clarence Stream gold deposit in southwestern New Brunswick occurs within a parallel series of quartz veins that occupy a NE-trending, steeply north-dipping, bri

    Jan 1, 2008

  • CIM
    Maximising Concentrate Revenues at the Xstrata Copper Kidd Concentrator

    By G. R. Morin, A. R. Leggett

    "In 2010, closure of the Kidd metallurgical plants along with structural changes to the historical ratios of payable metals led to a review of the operating targets at the Kidd concentrator. Previous

    Jan 1, 2013

  • NIOSH
    IC 9371 Aluminum Availability And Supply - A Minerals Availability Appraisal

    By David R. Wilburn

    The U.S. Bureau of Mines investigated the resources, costs, capacities, market relationships, and short-and long-term supply of bauxite, alumina, and aluminum. The 45 evaluated mines and deposits in 1

    Jan 1, 1993

  • SAIMM
    Interfacial Phenomena And Reaction Kinetics Between Carbon And Slag Containing MnO

    By Haiping Sun, Samir Ganguly, Oleg Ostrovski, M. Yaser Lone

    Wettability of graphite by synthetic SiO2-Al2O3-CaO-MnO slags with varied MnO content and by industrial slags was studied at 1350-1600 °C using sessile drop method under argon atmosphere. Initial con

    Jan 1, 2007

  • AUSIMM
    The Dwight-Lloyd Blast Roasting Section for Sintering Lead Ores at The Broken Hill Associated Smelters Proprietary Limited, Port Pirie, South Australia

    This Department handles all ores prior to blast-furnacing, the object of the operations being to mix the lead-bearing material with fiuxes, eliminate sulphur from the mixture, and produce a homogeneou

    Jan 1, 1937