Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Outbursts And Rockbursts In Coal Mines

    By Ian W. Farmer

    A description of the factors causing outbursts and rockbursts in coal mines is given. The mechanics of both outbursts and rockbursts can be described in terms of conversion of stored strain energy in

    Jan 1, 1988

  • SME-ICGCM
    Full-face Pressure Monitoring in Medium-Weak Roof Condition

    By Syd S. Peng

    Full-face shield leg pressures in a longwall panel for a three-month period were collected and analyzed. The pressure data were presented in the following forms: full- panel full-face shield pressure,

    Jan 1, 1997

  • SME-ICGCM
    Floor Failure Induced By Lateral Stress Ahead Of Longwall Supports

    By J. A. Nemcik

    Although floor failure at longwall faces has been traditionally associated with a soft floor, in many csses floor buckling has been observed just ahead of the longwall supports, despite the floor bein

    Jan 1, 1995

  • SME-ICGCM
    Quality Management For Grouted Rockbolts

    By Dieter Wittenberg

    The successful extension of the applications in which rockbolts can be used in the German coalmining industry is, because of the very great raining depth combined with a high degree of stress in the n

    Jan 1, 2000

  • SME-ICGCM
    Investigation Of Subsidence Event Over Multiple Seam Mining Area (b421bdde-19e7-491b-bc6d-a4cce9ef42b4)

    By Kewal K. Kohli

    An investigation was performed to determine the sequence of events which caused the 1987 surface subsidence and related damage to several homes in Walker County, Alabama, USA (see Figure 1). Surface a

    Jan 1, 1992

  • SME-ICGCM
    Research, Development, And Use Of Steel-Fiber-Reinforced Concrete Cribbing For Mine Roof Support

    By Dale A. Didcoct

    Through the combined efforts of the C. S. Bureau of Mines, the coal industry, and Burrell Construction and Supply Company, New Kensington, PA, a steel fiber reinforced concrete crib block to improve c

    Jan 1, 1982

  • SME-ICGCM
    Determination Of Plate Size Effect On Ultimate Bearing Capacity Of Weak Floor In Underground Coal Mines Using A Boundary Integral Approach

    By Zhanjing Yu

    In this paper, an equation is developed to characterize the relationship between the UBC and plate size using a boundary integral approach. The equation was validated by the results from mo& than seve

    Jan 1, 1993

  • SME-ICGCM
    Roof Bolt Bond Tester; A Device For Nondestructive Testing Of Grouted Bolts

    By Raymond M. Stateham

    The Bureau of Mines has developed a portable, lightweight device for determining the integrity of resin-grouted roof bolts. The instrument functions by sending a known pulse of ulstrasonic energy into

    Jan 1, 1982

  • SME-ICGCM
    Ground Control Problem Associated with Longwall Mining of Developed Pillars

    By T. N. Singh

    Board and pillar system of mining has beer, practised in India in view of abundant availability of cheap labour force, low investment and quick return. Subsequently, selective mining from thick seems

    Jan 1, 1984

  • SME-ICGCM
    Methods of Designing Mechanical Roof Bolting in Horizontally Bedded Strata (7261e3ed-3657-491d-b3f5-21e326427bd6)

    By David H. Y. Tang

    The reinforcement mechanism of suspension effect is analyzed based on beam-column theory. The equations of the maximum bending stress, deflection and transferred bolt load for the bolted roof strata

    Jan 1, 1984

  • SME-ICGCM
    Seepage and Reinforcement Behavior of Grouting Into Slaking-Prone Mine Tunnel Floor

    By Hideki Shimada

    In underground coal mines, grouting method is employed in order to reinforce the floor and to control the movement of groundwater into the roadway. However, the seepage and the reinforcement behavior

    Jan 1, 2002

  • SME-ICGCM
    Eclipse System Bolting In The Illinois Basin

    By Alan Campoli

    Approximately 100 million fully grouted rebar roof bolts are installed each year in the United States, 80% are B-Series (5/8 inch fully grouted rebar in a one-inch borehole). The lesser used more expe

    Jan 1, 2004

  • SME-ICGCM
    Ground Control Worker Safety During Extended Cut Mining

    By Roy H. Grau

    The trend in underground room-and-pillar cod mining is to employ remote-control continuous mining machines to take extended cuts of 40 A or more. Roof fall safety hazards to the mine worker associated

    Jan 1, 1997

  • SME-ICGCM
    Application Of Polyurethane Injection For Rehabilitation Of The Maingate Of A Deep Single Entry Longwall Mine

    By Kevin MacPherson

    After 34km of roof bolted drivage the first fall of ground occurred at the Phalen Colliery in the maingate of the 8th East longwall panel. The fall occurred over the stage loader as the wall approache

    Jan 1, 1999

  • SME-ICGCM
    Modelling Of Pillar Stability In Room And Pillar Mines

    By Douglas Morrison

    By applying modern 3D numerical modelling techniques to the analysis of a pillar cascade failure in a room and pillar mine, it has been possible to simulate the collapse and develop an understanding o

    Jan 1, 2003

  • SME-ICGCM
    Support Resistance And Roof Behaviour Of A Longwall Face With 4-Leg Shields

    By S. S. Peng

    The hydraulic powered supports have been employed in U. S. longwall mining for the past two decades. Yet the sciences of roof control at the powered supported faces remain largely unknown. In order to

    Jan 1, 1982

  • SME-ICGCM
    Ground Deformation In The Case Of Underground Mining Of Thick And Dip Coal Seams In The Jiu Valley Basin

    By Gheorghe Oncioiu

    The phenomena developed on the influence of thick coal seam no.3 mining, by horizontal slices and rocks caving roof control, in the Jiu Valley coal basin, are very complex. By analyzing the influence

    Jan 1, 1999

  • SME-ICGCM
    Analysis Of Longwell Shields And Their Interaction With Surrounding Strata In A Deep Coal Mine

    By Duk-Won Park

    A vast majority of the operating longwall sections use shield-type face supports to provide ground control in the United States. As a co-operative research program between the University of Alabama (U

    Jan 1, 1992

  • SME-ICGCM
    Coal Mine Primary Support Selection: Tension Versus Non Tensioned Roof Bolt Systems

    By Kot Unrug

    The selection of tensioned versus non-tensioned roof bolts, for primary coal mine roof support, has been debated for well over 25 years. The wide spread use of fully grouted rebar marked the beginning

    Jan 1, 2004

  • SME-ICGCM
    Seismic Events Due To Underground Mining Activities

    By R. Fritschen

    In order to investigate locations, source parameters, and source mechanisms of mining induced seismic events, a local network of seismic stations was installed at a coal mine in the eastern part of th

    Jan 1, 1999