Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Numerical Modeling of the Pillar Confinement with Backfilling Material in Room?and?Pillar Coal Mining

    By Andre Zingano

    It is known that the backfilling confinement increases the pillar strength and also reduces the rib lateral displacement. With backfilling, it is possible to increase the room-and-pillar mining recove

    Jan 1, 2011

  • SME-ICGCM
    Injection Techniques for Cost-effective Stabilization of Brittle and Faulted Strata Zones

    By Martin Bolesta

    The use of strata injection as a means of stabilizing brittle and heavily stressed ground as well as faulted zones is now state-of-the art technology. Users are obliged to select the right combination

    Jan 1, 2001

  • SME-ICGCM
    Shear Bond Stresses Along Cable Bolts

    By Hani S. Mitri

    The behaviour of grouted cable bolts used for rock reinforcement as a means of ground control in hard rock mining is investigated. The study utilizes an analytical model which is based on the variatio

    Jan 1, 1990

  • SME-ICGCM
    Study on Top-Coal Loss and the Optimum Drawing Interval of Longwall Top-Coal Caving Mining

    By Qiang Fu

    ABSTRACT This paper aims to identify the main issues concerning top-coal loss and the optimum drawing interval of LTCC (Longwall Top-coal Caving) mining by underground tests and DEM (Distinct Element

    Jan 1, 2002

  • SME-ICGCM
    A Method For Establishing Site Specific Coal Pillar Design Guidelines

    By Winton J. Gale

    Coal mine pillar design formulae available to mine planners are typically based on relationships determined for specific site conditions. Application of these methods is difficult when other factors,

    Jan 1, 1992

  • SME-ICGCM
    Evaluation of Rockburst Hazard from Core Testing

    By Michael Alber

    Coal resource extraction reaches higher depth of overburden and rockbursts as well as associated seismic events appear to become an additional problem to he addressed by ground control engineers. For

    Jan 1, 2004

  • SME-ICGCM
    Case Studies Of Depillaring Under Special Strata And Mining Conditions

    By P. R. Sheorey

    Four case studies of special geomining conditions from Indian coalfields are discuss- ed. These cases relate to (a) pillar extraction in two seams simultaneously under a difficult roof (Satpura I and

    Jan 1, 1988

  • SME-ICGCM
    Leached Salt Cavern Design Using a Fracture Criterion for Rock Salt (81ddea75-bb8e-4c9d-8bc7-d9299dc4873e)

    By Dale S. Preece

    In 1975 Congress passed the Energy Conservation Act to establish a U. S. Strategic Petroleum Reserve (SPR) with a capacity of 750 million barrels of crude oil. The most economic storage medium was det

    Jan 1, 1984

  • SME-ICGCM
    Development Of A Slope Stability Program For Improved Quarry Design

    By John Bullock

    Limestone and dolomite quarries were mapped to determine specific failure mechanisms for the various geologic and structural conditions. Algorithms for analyzing these mechanisms were incorporated int

    Jan 1, 1993

  • SME-ICGCM
    Progress In The Knowledge Of Granite Cutting With Diamond Wire (bf80b832-f557-4b46-b5c9-31193e67bf2d)

    By A. Bortolussi

    The paper discusses the state of the progress reached in the development of the diamond wire tool for cutting hard rocks. To the advances of this relatively new technology a substantial contribution h

    Jan 1, 1992

  • SME-ICGCM
    Design And Planning Of Lower Seam Longwall Gateroads

    Case study data were analyzed to develop and quantify empirical stress transfer relationships between seams for both longwall and room and pillar mines. Layering in the innerburden and the distance be

    Jan 1, 1995

  • SME-ICGCM
    Field Testing of the Fully Grouted Thrust Tensioned Bolts

    By Kot Unrug

    Fully grouted tensioned bolts provide a desirable compressive of laminated roof and bondage along the entire bolt length, at the same time the entire surface of the hole is protected against penetrati

    Jan 1, 2002

  • SME-ICGCM
    Load Transfer Mechanics In Fully-Grouted Roof Bolts

    By Maynard O. Serbousek

    The mechanics of load transfer of fully-grouted roof bolts in coal mines has been investigated in laboratory and analytical studies. The purpose of this research is to increase the understanding and b

    Jan 1, 1984

  • SME-ICGCM
    Stone Mine Design in Highly Fractured Rock (af82e9d2-530a-42f2-9d22-f8c466af0da2)

    By Vincent Scovazzo

    Cost-effective underground mine configurations have been designed in highly fractured rock masses where the stone possesses a high material strength. A limestone mine in the eastern United States is u

    Jan 1, 2002

  • SME-ICGCM
    Tension-Torque Relationship For Mechanical Anchored Roof Bolts

    By H. N. Maleki

    Tension-torque relationships were investigated *n a coal mine for bath standard 5/8 in. (16 mm) bolts and a vibrating wire instrumented bolt, using conventional and controlled installation techniques.

    Jan 1, 1984

  • SME-ICGCM
    Tekflex As A Sprayon Screen Replacement In An Underground Hard Rock Mine

    By Chris Pritchard

    Falconbridge Ltd., a major base metal producer in the Sudbury Basin of Ontario, Canada, identified a need to find a safe and cost effective replacement for welded-wire mesh used to support loose groun

    Jan 1, 1999

  • SME-ICGCM
    Application Of Bolt Design Criteria At Galatia Mine

    By Tom Denton

    The bolt design criteria, since it was first published by Dr. John Stankus (Stankus, 1997), has been recognized as an important tool in ground control design. This concept is based on the Optimum Beam

    Jan 1, 2000

  • SME-ICGCM
    Evaluation Of Measurement System For Monitoring The Stability Of Roof Bolted Roadways With Rectangular Cross Section By Selected Examples

    By Axel Preusse

    To detect improper deformations of a roof bolted roadway in order to reduce inner mine damages in the most early stage and to initiate suitable countermeasures if necessary, several different measurem

    Jan 1, 2000

  • SME-ICGCM
    Cross Well Acoustic Tomography To Locate Abandoned Underground Mines And Subsidence Failure

    By Linda K. Killoran

    The U.S. Bureau of Mines has developed a prototype cross well acoustic logging system and complementary tomographic image reconstruction software for the detection and delineation of abandoned undergr

    Jan 1, 1992

  • SME-ICGCM
    lnterpanel Barriers for Deep Western U.S. Longwall Mining

    By Leo Gilbride

    Western U.S. longwall operators face increasing challenges with optimizing ground control and productivity as mines reach greater depths and coal bursting hazards increase. Some western U.S. mines, ma

    Jan 1, 2004