Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Use of a Laser Grid System for Accurate Roof Bolt Location

    By William Kendall

    "A tremendous amount of research, analysis, and engineering time is used to design a proper roof support system including the type, length, and location of the roof bolts. Unfortunately, since the roo

    Jan 1, 2016

  • SME-ICGCM
    Determination of Effective Column Lengths for Resin-Grouted Roof Bolts

    By W. A. Cincilla

    The use of resin-grouted rock anchors continues to gain popularity in underground wall mines in the United States. It is estimated that during 1985, more than 30% and as many as 35% of all roof bolts

    Jan 1, 1986

  • SME-ICGCM
    In-Situ Investigation Into The Causes Of Falls Of Roof In South African Collieries

    By J. Nielen van der Merwe

    The main objective of the research described in the paper was to determine the causes of falls of roof in South African coal mines. The south African Colliery Manager's Association and the member

    Jan 1, 2001

  • SME-ICGCM
    Monitoring and Prediction of Ground Movements Above Underground Mines in the Eastern United States

    By M. Karmis

    mining factors and representative ground movement parameters. Based on this analysis, the previously developed prediction methods were modified and tested for their applicability in the Appalachian co

    Jan 1, 1987

  • SME-ICGCM
    Influence Of Partings In A Coal Seam On Long Term Pillar Stability

    By K. Biswas

    So far, all pillar design methods or approaches consider the coal seam as a uniform structure From some mine visits in northern Appalachian Region. it is found that some coal seams have binder or part

    Jan 1, 1995

  • SME-ICGCM
    Prediction Of Shearer Cutting Performance (2d8ef98a-f84a-4c60-8ac8-2edff3e8f14f)

    By D. L. Price

    This paper presents a method of measuring field power consumption of shearers and deriving specific energy consumption versus shearer haulage speed performance curves. A description of a computer prog

    Jan 1, 1992

  • SME-ICGCM
    Prediction And Control Of Surface Subsidence Over Abandoned Mined Lands In Carbonia (Italy)

    By Pier Paolo Manca

    The investigated area lies close to a large town and covers an area of about lkm2. The mine was worked at depths ranging from 5 to 100 meters but mining operations actually ceased some 50 years ago. T

    Jan 1, 1999

  • SME-ICGCM
    The Directional Drill Monitor For Long Hole Gas Drainage In Coal Mines (d6b87c76-5ad8-4cc5-b4ae-23b79c52c32b)

    By G. Skybey

    The Directional Drill Monitor (DDM) is an advanced instrument for real time in hole surveying. It was developed by Du Pont (Australia) to suit Australian gassy coal mining conditions. The instrumen

    Jan 1, 1992

  • SME-ICGCM
    Selection of Pumpable Cribs for Longwall Gate and Bleeder Entries

    By Alan A. Campoli

    "Pumpable crib support for longwall gates and ventilation bleeder entries is becoming more prevalent in United States coal mines (Figure 1). The pumpable crib selection and spacing design has been gre

    Jan 1, 2015

  • SME-ICGCM
    Variation In The Load Transfer Of Fully Encapsulated Rockbolts

    By Paul Hagan

    A diverse range of rockbolt designs and resin anchors are available for use in underground mines. Despite their wide spread use, the factors that affect the performance a rockbolt is not fully underst

    Jan 1, 2004

  • SME-ICGCM
    The Coal Mine Roof Rating (CMRR) A Practical Rock Mass Classification For Coal Mines

    By Gregory M. Molinda

    The U.S. Bureau of Mines has developed a rock mass classification system for coal mine roof control. The Coal Mine Roof Rating System (CMRR) evaluates the structural competence of mine roof using simp

    Jan 1, 1993

  • SME-ICGCM
    Depillaring and Roof Bolting Practices at Quinsam Coal Mine

    By Kresho Galovich

    Quinsam Coal Mine located in Vancouver Island, BC, Canada is mining the No. 1 coal seam at the 2 North/3 North mine and the No. 3 coal seam at 4 South Mine. This paper describes its geology and struct

    Jan 1, 2005

  • SME-ICGCM
    A Lineament Analysis Case Study of the Fola Coal Co., LLC. No. 2 Surface Mine, West Virginia

    By Paul L. Tyrna

    The Fola Coal Co., LLC No 2 surface mine, located in Nicholas and Clay Counties, WV, exploits up to nine coal seams by contour, highwall, and mountain top removal mining methods. After encountering fa

    Jan 1, 2001

  • SME-ICGCM
    Mechanisms of Rib Sloughing and Methods of Controlling Thick Bolted Ribs

    By Shuangsuo Yang

    Coal ribs can roughly be divided into three types: (1) roof and floor rocks are similar to ribs, (2) roof and floor rocks are stronger than ribs, and (3) roof and floor rocks are weaker than ribs. Dif

    Jan 1, 2005

  • SME-ICGCM
    Development of the Laboratory Short Encapsulation Pull Test for a Revised British Standard on Rock Reinforcement Components Used in Coal Mining

    By D. Bigby

    The current British Standard on rock reinforcement components used in coal mining (BS7861:1996) employs the axial double embedment tensile PET) test to determine the main system load transfer performa

    Jan 1, 2005

  • SME-ICGCM
    Jointing Effects On Pillar Strength

    By Gabriel Esterhuizen

    When designing pillars in coal and hard rock mines it is necessary to determine the strength of the rock mass forming the pillars. Empirical strength equations, based on rock mass classification techn

    Jan 1, 2000

  • SME-ICGCM
    Effects of Longwall Mining on Streamflow in the Pittsburgh Seam Basin

    By Kenneth L. Johnson

    The effects of underground longwall coal mining on flow in perennial streams within the Pittsburgh seam basin were evaluated. Four streams above four different longwall mines were studied. Overburden

    Jan 1, 1997

  • SME-ICGCM
    Designing Shotcrete As Primary Support in Tunnels

    By Behdeen Oraee-Mirzamani

    Since the advent of New Austrian Tunneling Method (NATM), shotcrete as a primary means of support in tunnels has been widely applied. It?s most important features are durability, speed of application

    Jan 1, 2011

  • SME-ICGCM
    Single Point And Full Scale Laboratory Testing Of Timber Chock Construction

    By Jim Galvin

    4 and 6 point timber chock constructions are used extensively on both a systematic and spot basis by Australian longwall operators to support tailgate roadways. In 1996, the School of Mining Engineeri

    Jan 1, 2000

  • SME-ICGCM
    Influence of a Coal Mine Subsidence on An Adjacent Dam

    By Nengxiong Xu

    The WTZ coal mine is located adjacent to an auxiliary dam in P. R. China. The mining-induced ground movements are calculated using a 3-D numerical procedure based on the finite difference method (FDM)

    Jan 1, 2013