Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Influence Of Horizontal Stress On Pillar Design And Mine Layout At Two Underground Limestone Mines

    By Garth Kuhnhein

    The Black River and Maysville underground limestone mines operated by Carmeuse Lime and Stone, Inc. in northeastem Kentucky are two of the largest underground limestone operations in the United States

    Jan 1, 2004

  • SME-ICGCM
    Monitoring For The Evaluation Of The Stability Of Underground Openings

    By P. K. Kaiser

    The purpose of deformation monitoring for the evaluation of the stability of underground openings is reviewed briefly and some results from laboratory tests of small tunnels are presented. The ground

    Jan 1, 1981

  • SME-ICGCM
    Modern Shield Technology: Better Than Ever But Still Not Perfect

    By Thomas M. Barczak

    A survey of the longwall industry was conducted to examine the performance of modern shield technology. The results of this survey indicate that state-of-the-art shields perform better and last longer

    Jan 1, 1999

  • SME-ICGCM
    Changes in Stress and Displacement Caused by Longwall Panel Retreats

    By Ihsan B. Tulu, David F. Gearhart, Gabriel S. Esterhuizen

    "Ground deformation and support response was monitored in a longwall gateroad as part of a research project into gateroad stability under changing loading conditions. In this study, instrumentation wa

    Jan 1, 2017

  • SME-ICGCM
    Application Of RMT's Remote Reading Telltale System To Monitor Roof Movement During Face Retreat At West Colliery, Germany

    By David Bigby

    Rock Mechanics Technology has developed an intrinsically safe remote reading telltale system which allows up to 4 sets of 100 dual height, water diverting telltales in a mine roadway to be remotely mo

    Jan 1, 2003

  • SME-ICGCM
    Preventing Roof Fall Fatalities during Pillar Recovery: A Ground Control Success Story

    By Michael Gauna, Christopher Mark

    "For decades, pillar recovery accounted for a quarter of all roof fall fatalities in underground coal mines. Studies showed that a miner on a pillar recovery section was at least three times more like

    Jan 1, 2016

  • SME-ICGCM
    Multi?stage Testing Procedures, Verification, and Results for Strong, Brittle Sandstone

    By Michael Murphy

    A multi-stage triaxial procedure has been developed for the enhanced servo controls and feedback systems at the National Institute for Occupational Safety and Health (NIOSH) rock mechanics laboratory.

    Jan 1, 2014

  • SME-ICGCM
    Ground Response As a Longwall Advances Into a Backfilled Recovery Room under Low Cover

    By David F. Gearhart

    A cooperative study was conducted between Signal Peak Energy and the National Institute for Occupational Safety and Health (NIOSH) to evaluate the behavior of a pre-driven recovery room under less tha

    Jan 1, 2014

  • SME-ICGCM
    Study on the Height of Fractured Zone inside Overlying Strata under High-Intensity Mining in China

    By Lou Gaozhong, Guo Wenbing, Zhao Gaobo, Wang Shuren

    "The height of a fractured zone due to high-intensity mining (HIM) plays a vital role in the safety analysis of coal mining under bodies of water. This paper described the characteristics of HIM. The

    Jan 1, 2018

  • SME-ICGCM
    Deep Cover Bleeder Entry Performance and Support Loading: A Case Study

    By Tulu B. Ihsan, Mark A. Van Dyke, Ted M. Klemetti

    "How well do current modeling procedures calculate the rear abutment extent and loading? Does an improved understanding of the rear abutment extent warrant a change in standing support in bleeder entr

    Jan 1, 2017

  • SME-ICGCM
    Three?Dimensional Ground Stability Study Around a Mine Tunnel in a Highly Discontinuous Rock Mass under Significant in Situ Stress

    By Pinnaduwa H. S. W. Kulatilake

    To exploit an underground mine effectively and safely, it is important to have a good understanding of the geotechnical behavior of the rockmass surrounding the underground mine excavation. The aim of

    Jan 1, 2013

  • SME-ICGCM
    Headgate Rehabilitation through Roof Fall Reconsolidation at Broadmeadow Mine

    By Robert J. Coutts, Dan A. Payne

    "The Broadmeadow mine is a punch longwall mine owned and operated by BHP Billiton Mitsubishi Alliance (BMA) in the Bowen Basin of Queensland, Australia. In 1999, an exploratory adit was driven as part

    Jan 1, 2010

  • SME-ICGCM
    Study on the Top Caving Mining Technology in Thick Coal Seam beneath the Earth-Rock Dam and Its Influence

    By Wenbing Guo, Yi Tan, Erhu Bai

    "It is important to study the mining technology under structures for raising the coal resources recovery ratio. Based on the geological and mining conditions, the top coal caving harmonic mining techn

    Jan 1, 2016

  • SME-ICGCM
    Underground Longwall Mining with the Impact of Disturbed Areas by Abandoned Gateroads and Small Gobs

    By Enguang Zhu, Kangning Zhang, Yang Li

    "Due to the use of outdated mining technology or room and pillar mining process in small coal mines, the coal recovery ratio is only 10% - 25%. In many regions of China: the damage area caused by the

    Jan 1, 2016

  • SME-ICGCM
    Comparison of L-Band and X-Band Differential Interferometric Synthetic Aperture Radar for Mine Subsidence Monitoring in Central Utah

    By Jessica M. Wempen, Michael K. McCarter

    "Differential Interferometric Synthetic Aperture Radar (DlnSAR), a satellite-based remote sensing technique, has potential application for measuring mine subsidence on a regional scale with high spati

    Jan 1, 2016

  • SME-ICGCM
    The Relationship between Ultrasonic Velocities and Mechanical Damage in Sandstone under Cyclic Loading

    By Hongwei Zhang, Sen Yang, Shimin Liu

    "This laboratory study investigates the damage evolution of sandstone specimens under two types of cyclic loading conditions through monitoring and analyzing the variations of elastic moduli and ultra

    Jan 1, 2017

  • SME-ICGCM
    Gateroads Layout and Entry Support in a Western Longwall Coal Mine in China

    By WenFeng Li

    Comparing to the coal seams in Eastern China, the coal seams in Western China usually have better geological conditions. Therefore, changes in the conventional gateroads layout are required for the We

    Jan 1, 2013

  • SME-ICGCM
    Cemented Coal Gangue-Fly Ash Backfill Technique

    By Baogui Yang, Jie Yang, Anthony Iannacchione

    "The cemented coal gangue-fly ash backfill technique (CGFB) has commonly been used to control subsidence damage caused by underground coal mining. This paper discusses the CGFB backfilling process use

    Jan 1, 2018

  • SME-ICGCM
    Roof Bolting in Low Seam Mining with Thick "Stack Rock" Roof under High Horizontal Stress

    By Peter Zhang, Gary Deemer, Rod Lawrence, Scott Peterson, Scott Wade, Mike Mishra, Rick Smith, Robert Bottegal, Ed Zeglen

    "Thinly-laminated silty shale that falls like ""stack rock"" is always difficult to support in underground coal mines. With thin laminations of 2.5 to 52 mm (0.1 to 2 in) thick and weak bonding betwee

    Jan 1, 2010

  • SME-ICGCM
    Evaluation of Seismic Potential in a Longwall Mine with Massive Sandstone Roof under Deep Overburden

    By Joe Wickline, Mark A. Van Dyke, Wen H. Su

    "Geological factors and mine design contribute to mining-induced seismic activity, and this is especially true in longwall mining. Massive rock units are a key cause of seismic activity due to catastr

    Jan 1, 2017