New Developments In Headed Rebar Ground Support (e1369dc5-cd64-41ac-8b6d-861d8d628824)By Roland C. Walker
Traditional headed rebar has existed in the mining industry as a ground support product for many years. The head of a rebar bolt is most commonly produced by hot upset die forging. Upset die forging
Jan 1, 2009
-
The Effect of Immediate Strata on Pillar Behavior in Retreat Pillaring-- A Case StudyBy A. W. Khair
This paper deals with the analysis of pillar failure in a room and pillar mining operation of a deep underground coal mine. The incident here involved the failure of more than 100 pillars. The mechan
Jan 1, 1986
-
Design Methods To Control Violent Pillar Failures In Room-And-Pillar Mines (V. S. Bureau of Mines)By R. Karl Zipf
The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard to miners and mine operators. This type of failure, termed a "Cascading Pillar Failure" (CPF), occurs when o
Jan 1, 1996
-
Direct determination of failure surfaces in earth slopesBy S. L. Huang
The location and shape of potential failure surfaces in soil slopes were directly determined based on the stresses induced in the soil mass and the strength of the soil itself. Stress calculations wer
Jan 1, 1989
-
Improved Intersection Design And Monitoring In The Sydney CoalfieldBy G. R. Corbett
The introduction of roof bolts to Phalen Colliery in the Sydney Coalfield, Nova Scotia (annual output of 2Mt) has been successfully implemented in maingate and tailgate entries over the last four year
Jan 1, 1995
-
Geomechanical and Weathering Properties of Weak Roof Shales in Coal MinesBy Hakan Gurgenli
Many coal seams have weak shale immediate roofs that cause ground control problems. Therefore, it is important to know the properties of these shales so that preventive measures can be developed in a
Jan 1, 2006
-
Top Coal Failure Mechanism Of Extremely Thick Seam In Top Coal Caving Mining (b4774a45-fd0f-4916-8ea9-0dac0bf96077)By Nan Hua
As a high production and high efficient mining method, top coal caving method is now widely used in China. However, as more extra-thick coal seams are mined, it becomes more and more difficult to make
Jan 1, 2009
-
A Test Of Predictive Numerical Models To Simulate Entry Design Changes Using Field Measurements From A Longwall Mining GateroadBy Jennifer Riefenberg
Research efforts by the U.S. Bureau of Mines include running a series of displacement-discontinuity, boundary-element models to simulate the gateroad design at an underground coal mine in northwestern
Jan 1, 1993
-
Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and MonitoringBy Peter (Yunqing) Zhang
Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution
Jan 1, 2006
-
Determination Of Horizontal Stress Direction By Underground Mine Mapping (2f4eaf66-10ce-4f4d-9f7a-64c6c21e6400)By S. E. Phillipson
Underground mine mapping is a critical component of understanding the controls on ground instability. Many relatively localized examples of ground failure are associated with geologic features, such
Jan 1, 2009
-
Mine-Wide Monitoring Applications In Ground Control ResearchBy David Conover
Technological advancements in electronic sensors and mine-wide monitoring systems have improved remote monitoring and analysis of underground mining information. The effective use of . these systems f
Jan 1, 1990
-
Analysis Of Multiple-Seam Interaction In A Bump-Prone Western Coal Mine Using MULSIM/PCBy D. A. Donato
It is often necessary for a mining company to extract coal from a seam underlying a previously mined coal seam. The impact of the overlying mine workings on the stress distribution within the underlyi
Jan 1, 1996
-
The Response Of A High Order Stream To Shallow Cover Longwall Mining In The Northern Appalachian CoalfieldBy John A. Owsiany
The effect of longwall mining on streams and shallow aquifers has been the subject of numerous research studies for more than twenty years. As a result of these studies, it has become common to consid
Jan 1, 2001
-
The In-Situ Pillar Strength and Overburden Stability in U.S. MinesBy Hamid Maleki
Prudent design of coal pillars in any mining system requires an estimation of in-situ pillar strength, overburden lateral load transfer capability, and a failure criterion. Pillar strength is typicall
Jan 1, 2008
-
Coupon Testing for Field Assessment of Stress Corrosion Cracking of Rock BoltsBy Damon P. Vandermaat
Coupon testing allows for the rapid understanding of a material?s likely behavior in service conditions, allowing engineers and operators to make informed decisions about the likely service-life of pa
Jan 1, 2012
-
Coal Pillar Strength Based On The Ground Reaction Curve - A New ApproachBy Kazem Oraee
In underground coal mining, particularly room-and-pillar methods, the coal pillars play a significant role in roof stability. If the pillar dimensions are increased, the pillar bearing capacity also i
Jan 1, 2009
-
The Contributions of the Alpha Foundation to Ground Control Research and DevelopmentBy Tom Barczak, Julian Restrepo, Zach Agioutantis
"The Alpha Foundation for the Improvement of Mine Safety and Health, Inc. (Foundation) was established as part of a Non-Prosecution Agreement (Agreement) entered in December 2011 by the United States
Jan 1, 2016
-
Stability Mapping To Examine Ground Failure Risk: A Field Study At A Limestone Mine (b0d73e07-1fdd-41b0-ab9e-b3e15e89a17e)As the surface reserves are being depleted, more and more stone operators are seeking underground mining options. Stability of underground openings is a major concern for the safety and productivity.
Jan 1, 2009
-
Mine Layout Deign for Coal Bump ControlBy Hamid Maleki
A comprehensive study consisting of stress determinations, core logging, laboratory testing, and numerical analyses was conducted to investigate the cause and potential alternatives to the coal bump c
Jan 1, 1987
-
Surface damage due to longwall mining - A case studyBy P. M. Lin
A subsidence monitoring program over a longwall panel was established (1) to explore the impacts of dynamic subsidence on the ground surface and structures and (2) to correlate the movements between t
Jan 1, 1989