Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Development and Application of Geotechnical and Rockmechanical Standard Planning System for Roadway Development in German Coal Mines

    By K. H. Brandt

    A standard planning system for the development of roadways was adopted for German coal mines based on the results of geotechnical and rockmechanical investigations. Its goal is to provide for sufficie

    Jan 1, 2004

  • SME-ICGCM
    Influence Of Discontinuity Orientations And Strength On Cavability In A Confined Environment

    By L. J. Lorig

    Much of the present knowledge about caving behavior of rock masses has been obtained from empirical observations. Additional notions about caving have been developed through inferences derived from tw

    Jan 1, 1989

  • SME-ICGCM
    Study on Appropriate Support System and Control Criteria for Main Roadway under Weak Geological Conditions in Indonesia

    By Takashi Sasaoka, Hiroshi Takamoto, Akihiro Hamanaka, Pongpanya Phnthoudeth, Hideki Shimada, Jiro Oya

    "Indonesia is the second largest coal exporter to Japan, accounting for about 30 Mt annually. They produced over 400 Mt in 2015, over 99% of which is from open-cut mines. However, the conditions of su

    Jan 1, 2017

  • SME-ICGCM
    An Integrated Approach To Subsidence Modelling And Prediction In The Collie Coal Basin (Western Australia)

    By Ian Misich

    A research programme has been undertaken to evaluate and predict the effect of total extraction of coal by underground methods on the superimposed strata, aquifer systems and ground surface in the Col

    Jan 1, 1993

  • SME-ICGCM
    Modal Testing and Dynamic Finite Element Analysis of a Roof Bolter?s Drilling Boom

    By Youzhen Zhang

    The drilling boom is the key component of a roof bolter, and it has significant impact on the performance, safety, and reliability of the overall working device. In this paper, the experimental modal

    Jan 1, 2012

  • SME-ICGCM
    Supporting Method of the Bolted Strata in Large Deformation Roadways

    By Shuangsuo Yang

    Based on field observations and physical modeling of simulated materials, the dynamic equilibrium principle on the whole interaction process between the surrounding rocks and support of large deformat

    Jan 1, 2005

  • SME-ICGCM
    Coal Pillar Life Prediction in the Vaal Basin, South Africa

    By J. Nielen van der Merwe

    This investigation was done to develop a method to predict the lie of coal pillars. It has long since been known that coal pillars deteriorate over time, but there was no method to quantify the deteri

    Jan 1, 1998

  • SME-ICGCM
    Coal-Mining-Induced Seismicity in Utah?Improving Spatial Resolution Using Double-Difference Relocations

    By Kristineq Pankow

    The August 2007 Crandall Canyon mine disaster raised national awareness of mining-induced seismicity (MIS) in Utah as well as general interest in how seismic monitoring might improve mine safety in th

    Jan 1, 2008

  • SME-ICGCM
    Outburst Control in Underground Coal Mines,

    By Floyd D. Varley

    Outbursts, the sudden and violent out- pouring of material into mine openings, is a ground control problem increasingly encountered in the United States as deeper seams are developed. Outbursts, cause

    Jan 1, 1986

  • SME-ICGCM
    Beyond Coalbrook: Critical Review of Coal Strata Control Developments in South Africa

    By J. Nielen van der Merwe

    Rock engineering research and technology development in South Africa only received serious attention in reaction to the Coalbrook disaster in 1960. At the time, a number of gaps in knowledge of rock r

    Jan 1, 2006

  • SME-ICGCM
    Outcomes of the Landmark Longwall Automation Project with Reference to Ground Control Issues

    By Michael Kelly

    Inertial navigation technology has, for the first time, allowed the position of a longwall shearer to be mapped in three dimensions. Following the success of the technology in highwall mining and succ

    Jan 1, 2005

  • SME-ICGCM
    Estimation Of Long-Term Stability Of Mine Pillars In Underground Pit

    By S. Yamashita

    Recently in Japan, unexpected degradation (surface subsidence) at old underground quarry sites, such as 'Ohya-Ishi' (pumice tuff) pit field has often been occurred. At these quarry sites, th

    Jan 1, 1996

  • SME-ICGCM
    Application Of Short-Term Time-Dependent Plate Loading Tests For Estimation Of In-Situ Elastic And Viscous Parameters Of Weak Floor Strata

    By Gang Chen

    This paper explores the possibility of using short-term time-dependent plate loading tests to estimate the elastic and viscoelastic parameters of the weak floor strata typically associated with coal s

    Jan 1, 1990

  • SME-ICGCM
    Twenty-Four Conferences; More Than One-Hundred and Seventy Papers; Understanding Roof Bolt Selection and Design Still Remains Priceless (2784433d-38ec-4606-8972-993e284de8c3)

    By Stephen C. Tadolini

    The International Ground Control Conference in Mining has always provided an open forum for the publication, presentation, discussion, and often heated debate on roof bolting systems mostly with atten

    Jan 1, 2006

  • SME-ICGCM
    Correlation of Sonic Travel Time to the Uniaxial Compressive Strength of U.S. Coal Measure Rocks

    By David Oyler

    Sonic travel time logging of exploration boreholes is routinely used in Australia to obtain estimates of coal mine roof rock strength. Because sonic velocity logs are relatively inexpensive and easy

    Jan 1, 2008

  • SME-ICGCM
    Roof Bolter Rocker Pad Deflector Systems (6ff5d1f9-2211-4169-8a90-2ad9493ee24a)

    By Arnold Hammons

    Automated temporary roof support (ATRS) systems have been incorporated into roof bolters since the 1970?s. During roof bolting, many injuries have occurred from large pieces of draw rock falling inby

    Jan 1, 2009

  • SME-ICGCM
    Pillar Stability Issues Based on a Survey of Pillar Performance in Underground Limestone Mines (08bccb54-5d4b-443a-860e-90b5a6841ec3)

    By Gabriel S. Esterhuizen

    A survey of pillar conditions was carried out at 21 operating limestone mines that use the room-and-pillar method. The surveyed pillars were all located in rock that was classified as ?Good? to ?Very

    Jan 1, 2006

  • SME-ICGCM
    Development of Timedependent Surface Subsidence Over the Total Extractions Areas of the Potash Beds Stoped with Interchamber Yield Pillars

    By M. P. Nesterov

    The method of predicting the time-dependent surface subsidence for gently-inclined potash deposits where total extraction using various sizes of yielding bamier pillars was discussed.

    Jan 1, 1998

  • SME-ICGCM
    25 Years of Progressive in Numerical Modeling for Ground Control ? What Have We Accomplished and Where Do We Go Next?

    By Keith A. Heasley

    Exactly 25 years ago this month (August 12, 1981), IBM introduced the ?Personnel Computer? with a 16 bit operating system called MS-DOS 1.0. Since then, Moore?s Law, which essentially states that

    Jan 1, 2006

  • SME-ICGCM
    Rib Support Innovation At Daw Mill Colliery (a22a0861-1502-4d3d-a2cd-8a6ba0c13271)

    By Jon Bowler

    Daw Mill Colliery, UK Coal, near Coventry in England, mines the Warwickshire Thick Seam at 800 m/2500 ft depth using longwall retreat with gateroads supported by rockbolts. Over the last eight years

    Jan 1, 2009