Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Caving, Seismicity, and Mine Design in Four Utah Mines

    By Hamid Maleki

    Having developed a methodology for estimating mining-induced seismicity resulting from slip along geological discontinuities in 2003, in this paper, the importance of measurements are high-lighted in

    Jan 1, 2006

  • SME-ICGCM
    Factors Influencing the Occurrence of Coal Pillar Bumps at the 9-Right Section of the Olga Mine

    By David C. Oyler

    The Bureau of Mines conducted research at the 9-Right Section of the Olga Mine to determine the cause of bumps and aid in the development of appropriate control techniques. The purpose of this paper i

    Jan 1, 1987

  • SME-ICGCM
    Effect of the Interchamber Pi Yield on the Surface Strains in the Movement Trough Edges

    By Mikhail P. Nesterov

    The paper presents the results of the research that can forecast the development of subsidences and deformations of the earth surface with time in the permanent marginal areas of the movement troughs

    Jan 1, 1997

  • SME-ICGCM
    Control Of Roadway Closure In Underground Coal Mines By Sidewall Weakening Technique

    One of the problems associated with the maintenance of roadways in underground coal mines is that of dealing with roadway closure. Sidewall weakening technique is based on the transference of the h

    Jan 1, 1990

  • SME-ICGCM
    J?Crete: An Engineered Cementitious Composite Rock Coating

    By Alan A. Campoli

    The mining industry has long been searching for an effective structural application that prevents weathering and falls of loose rock, debris, and sediment. J-Crete is a fiber-reinforced, engineered, c

    Jan 1, 2012

  • SME-ICGCM
    Investigating Abutment Load

    By Ihsan Berk Tulu

    In the Analysis of Retreat Mining Pillar Stability (ARMPS) program, the magnitude of the abutment loading adjacent to a gob area is calculated using an ?abutment angle? concept. The extent of the abut

    Jan 1, 2012

  • SME-ICGCM
    Horizontal Stress and Coal Mines: Twenty-Five Years of Experience and Perspective

    By G. J. Hasenfus

    Although theoretical and conceptual knowledge regarding the impact of horizontal stress on underground coal mining excavations have existed since at least the mid-1900s, it wasn?t until the late 1970?

    Jan 1, 2006

  • SME-ICGCM
    Identifying Moisture Sensitive Roof Rocks in Coal Mines

    By Gregory M. Molinda

    Historically, miners have known that roof rocks originally composed largely of mud were prone to slaking and deterioration when exposed to water and humidity. Mine Safety and Health Administration (M

    Jan 1, 2006

  • SME-ICGCM
    Aspect Ratio and Other Parameters That Affect the Performance of Burrell Can Roof Supports

    By David F. Gearhart

    The Burrell Can1 is a thin, steel, tubular shell filled with aerated concrete that is used as a roof support in coal mines. The Can height is always shorter than the mining entry, so it is capped with

    Jan 1, 2012

  • SME-ICGCM
    Passive Seismic Imaging for Determination of the Longwall Rear Abutment Location

    By Erik Westman

    Few studies have been conducted regarding the location, movement, and relative magnitude of the rear abutment of a longwall coal mine. The rear abutment, or the abutment pressure arch in the gob area,

    Jan 1, 2012

  • SME-ICGCM
    A Hydrogeomechanical Study Of Overburden Aquifer Response To Longwall Mining

    By G. J. Hasenfus

    This paper presents the results of an extensive hydrological and geomechanical monitoring program which Gas conducted at a longwall coal mine in W. Va. The field program included monitoring of groundw

    Jan 1, 1988

  • SME-ICGCM
    Controlled Blasting During Drifting In Hard Rock Mine

    By S. P. Singh

    Drifts are an integral component of underground mining. They provide access for men and material, means for transporting ore and rock and serve as air passageways. In view of their importance on the o

    Jan 1, 1990

  • SME-ICGCM
    Application Of Seismic Tomography In Underground Mining

    By D. F. Scott

    Seismic tomography, as used in mining, is based on the principle that highly stressed rock will demonstrate relatively higher P-wave velocities than rock under less stress. A decrease or increase in s

    Jan 1, 1996

  • SME-ICGCM
    Geology, Ground Control, and Mine Planning at Bowie Resources, Paonia, CO

    By Collin Stewart

    Bowie Resources maintains one of the most pro-active ground control programs in the U.S. mining industry today. Its guiding philosophy is that everyone in the organization, from the miners at the fac

    Jan 1, 2006

  • SME-ICGCM
    Large Scale Ground Instability Caused By Failure of Underlying Pillars: A Case Study of Dynamic Multiple Seam Interaction

    By Christopher Mark

    Severe dynamic multiple seam interactions can occur when active mine workings are subsided by underlying mining activity. The most dramatic events are usually caused by longwall mining or pillar recov

    Jan 1, 2012

  • SME-ICGCM
    Fortrac® Geogrids For Mine Roof Control

    By Ray Brandon

    The recent introduction of polymer geogrids for ground control purposes in underground mines allows mine operators more flexibility in choosing improved products for several applications. This is evid

    Jan 1, 1996

  • SME-ICGCM
    Development of Mains in Challenging Ground Conditions

    By Kot F. v. Unrug

    The present combination of coal market prices and reserves, situated in the Central Appalachian Coal Field, is such that mining of smaller coal reserve blocks has become economically attractive. In

    Jan 1, 2006

  • SME-ICGCM
    Automated Monitoring Of Rock Slopes And Waste Dumps

    By Andrew G. Martin

    In 1991, Modular Mining Systems began marketing a Slope Monitoring System (SMS) now installed at twelve mines. The SMS uses automated wire line extensometers to monitor field conditions frequently. Ev

    Jan 1, 1996

  • SME-ICGCM
    Longwall Shield Recovery Using Mobile Roof Supports (64264c53-830d-4e84-b91e-78532103884a)

    By Frank Chase

    Longwall mining has gained the reputation as being the safest extraction method in underground coal mines. However, one of the most difficult tasks associated with longwall mining is moving the face

    Jan 1, 2007

  • SME-ICGCM
    Multiple Seam Mining Feasibility in the Illinois Basin (USA): LaModel Stress Analysis Programs

    By Rebecca Hardy

    The escalating demand for coal, in addition to the steady depletion of reserves, has produced increasingly difficult mining conditions for coal mining companies within the United States, resulting in

    Jan 1, 2006