Anticipated Behavior Of Silty Sands In TunnelingBy Ronald E. Heuer, Debra L. Virgens
INTRODUCTION Behavior of clay soils in response to tunneling is reasonably well understood by reference to the tunnel stability factor NT = Pz/su (Peck, 1969; Heuer, 1974). With this analysis tool,
Jan 1, 1987
-
Current Status of Federal Regulations and Rulemaking in Governing Subsidence Due to Underground MiningBy Dermot Winters
The Surface Mining Control and Reclamation Act (SMCRA, or the Act) was enacted on August 3, 1977. The Act was written, in part, to put an end to uneven environmental standards and to establish minimum
Jan 1, 1986
-
Mining ?nance Challenges;Second Annual Conference Explores the IssuesObtaining financing for mining and exploration projects has been difficult for the last several years, particularly for junior companies. Today, though, the purse strings of investors appear to be loo
-
Evaluation Of Cyanide Producing Microorganisms To Recover Gold From Low-Grade Ore ? IntroductionBy D. Shin
The gold leaching using cyanide from ore or waste has been almost universally in use [1]. Recently, biological gold bioleaching using cyanide producing bacteria, e.g. Chromobacterium violaceum, Pseudo
Jan 1, 2012
-
Mineral Resources Evaluation with Mining Selectivity and Information Effect "Mining, Metallurgy & Exploration (2020)"By Ana Chiquini, Clayton V. Deutsch
The most common approach used in the mining industry for mineral resources modeling is to estimate the grades using ordinary kriging and report the recoverable resources based on this deterministic es
May 26, 2020
-
In Situ Stress Measurement In A Jointed Basalt: The Suitability Of Five Overcoring TechniquesBy T. A. Rundle, K. Kim, W. M. McCabe, E. C. Gregory
Overcoring tests were conducted at the Near-Surface Test Facility(NSTF) to assess the suitability of five techniques (U.S. Bureau of Mines borehole deformation gauge (BDG), Commonwealth Scientific and
Jan 1, 1983
-
Social, Economic, And Planning Impacts Of Rapid Excavation And Tunneling TechnologyBy W. L. Garrison
Improvements continue to be made in rapid excavation and tunneling technology. There are several ways to examine the impacts of such improvements. The most common procedure is to monitor current devel
Jan 1, 1974
-
The Expectations For Coal: Is Our Government And The Coal Industry Prepared?By M. S. Miller
With prevailing assumptions that plentiful domestic coal reserves will be available for meeting our Nation’s expectations for on future low emission, coal-fired power plants, major government funding
Jan 1, 2004
-
Geologists Add Value at Newmont’s Nevada Mines – Part TwoBy Wayne Trudel, Eric Saderhold, Lloyd McEvers, Lori Clarke, Charles Lynn Bolin, Leroy Schutz
Editor’s note: This is the second part of a two-part series on how mine geologists added about 141t (4.53 million oz) at Newmont Mining’s gold operations in Nevada during 2003. Part one (ME, July2004
Jan 1, 2004
-
Comparing Simulated And Interpreted Geologic ModelsBy M. Rossi
Geologic ore controls are usually interpreted and modeled from cross sections and plans, as they are critical to construct meaningful and accurate ore reserves models. The geologic boundaries are oft
Jan 1, 2004
-
Development in Utility Tunnelling in the United Kingdom During the Years 1990–2000By Andy Mille
The paper highlights development of tunneling methodology in the UK during the years 1990-2000 using the example of two major tunneling contracts where there solution of difficult tunneling problems d
Jan 1, 2001
-
Mine Pillar Design Using the Ground Reaction Curve ConceptBy Ravi Ray, Kostas Kaklis, Zach Agioutantis
"Modern underground mining is becoming more complex and geotechnically challenging. The engineer uses numerical, analytical, and data-driven methods (empirical and/or experimental) or their combinatio
Jan 1, 2019
-
Long-Term Stability Of Overburden Above Room And Pillar MinesBy Gennaro Gerald Marino
Vast improvement in methods of design and analysis of the long- term stability of overburden above room and pillar mines is needed. Improved methods are vital for planning and land development and for
Jan 1, 1986
-
Materials Flows Generated by Pyromet Copper SmeltingBy Thomas G. Goonan
Copper production through smelting generates large volumes of material flows. As copper contained in ore becomes copper contained in concentrate to be fed into the smelting process, it leaves behind
Jan 1, 2005
-
Jet Grout Ground Modifications for the Brightwater Conveyance SystemBy Richard Hanke
Tunnel construction on the Brightwater Conveyance System?s East and Central contracts required ground modifications of the existing site soils, comprised of sandy alluvium to very dense glacial till,
Jan 1, 2008
-
Making Headway: All-Tool Carriers And Attachments Are Making An Impact On Advanced TunnelingBy Peter Bigwood
Whether drilling through tough clay or breaking rock, or facing the most severe conditions including mixed face ground, perched water and running and flowing sands, working under-ground certainly come
Jan 1, 2012
-
Methods To Improve Mine Ventilation System Efficiency - Introduction - Preprint 09-070By C. Pritchard
John Marks said in his acceptance of the Hartman Award in 2008 ? ?I guess that without the occasional complaint, your mine is probably over-ventilated? (Marks, 2008). Miners are seldom in this situati
Jan 1, 2009
-
American steelmaking is becoming a market-oriented enterpriseBy Frank W. Luerssen
Introduction "Austerity" is perhaps an overly generous description of the past three years in the American steel industry. Steel plants operated at an average of only 57% of their capability in 1982-
Jan 6, 1985
-
Estimating Strain and Stress in Oriented Rock Cores Using a Diametral Deviation MethodA practical core-based method for estimating in situ stress was tested using 360° measurements of rock core diameter in a laboratory setting. In several mining districts across West Virginia, rock cor
Jan 7, 2020
-
Final Tunnel Liner At The Mill Creek 3 ProjectBy M. Schafer
The 6-m- (20-ft-) diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT3) has been completed. This article summarizes aspects of liner design and ad-dresses the construction a