Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Northern Link - Tunnel Blasting In Environmentally Sensitive Surroundings - Using NCVIB

    By Donald Jonson

    Stockholm’s Northern Link, currently Europe’s largest urban road tunnel project, will be about 5 km long from west to east. Running through two separate, mostly parallel tunnels, each with 2-4 lanes,

    Jan 1, 2009

  • ISEE
    High Resolution Seismic Refraction Tomography for Determining Depth of Blast Induced Damage in a Mine Wall

    By Stephan Iversan, Janae Singer

    High resolution seismic refraction tomography has proved to be a useful tool to effectively estimate depth of blast induced damage in rock. Excavation blast damage can be as shallow as 1 to 2m (3 to 7

    Jan 1, 2009

  • ISEE
    A New Blasthole Location Error Detection and Compensation System for Open Pit Mines

    By S. Klerkx, R Battulwar, J Valencia, J Sattarvand, E Emami, M. Soleymani Shishvan

    A new technology for energy distribution optimization, supported by NIOSH.

    Feb 1, 2020

  • ISEE
    The International Development of Dangerous Goods Transport Regulations

    By Ben Barrett

    Dangerous goods, known as hazardous materials in the USA, are subject to special controls during transport to ensure the safety of the public. Dangerous goods are divided into nine classes, and Class

    Jan 1, 2010

  • ISEE
    Stem Induced Fracturing Revisited

    By Uli Leiste

    Two papers are presented which examine Air Deck Blasting, one from a computational aspect and the other from a shock aspect.

    Jan 1, 2016

  • ISEE
    Trim Blasting Designs in the Morenci Mine

    By Karl Christopherson, Vanessa de Viterbo

    Trim blasting is an integral part of the mining processes at the Morenci Mine, a Freeport-McMoRan Copper & Gold Inc. property. Trim blasting near high-walls or Finals blasting requires a tighter distr

    Jan 1, 2011

  • ISEE
    Pump Protection Systems on Mobile Equipment

    By Tom Watts

    This paper will focus on the design, manufacture and use of pump safety systems on MMUs (Mobile Manufacturing Units – Bulk Trucks) with progressive cavity pumps. The practice of pumping bulk blasting

    Jan 1, 2009

  • ISEE
    New Model for Realistic 3D Blast Simulation

    By Thierry Bernard

    To be able to precisely predict the result of a mine blast before pressing the button is a goal for many blasters due to the environmental and economic constraints of our century. Based on the fundame

    Feb 1, 2020

  • ISEE
    Low Powder Factor Blasting to Take Advantage of Natural Rock Fissures is Uneconomical

    By R. F. Favreau, Patrice Favreau

    In many quarries and construction sites visited by the authors over the last 50 years, the latter have observed muck piles from blasting with explosives, which included numerous large blocks, in some

    Jan 1, 2018

  • ISEE
    Predictive Modelling for Equipment Blast Exclusion Zone Reduction

    By Kim Henley, Chris Batten

    This paper discusses the use of the Orica WildFireTM flyrock model to help mining operations in Australia and Asia minimise blast exclusion zones for equipment, increasing utilisation and productivity

    Feb 1, 2020

  • ISEE
    Automatic Blast Design Based on Autonomous Drone

    By Thierry Bernard

    New technology to automatically design a blast based on autonomous drone. The process of flying a drone, calculating the 3D cloud of points, generating the critical face profiles and placing holes aut

    Feb 1, 2020

  • ISEE
    Low Cost Method for monitoring Shock-Tube Detonator and Explosive Product performance in Blast holes.

    By W. Birch, G. D. Rangel-Sharp, L. Bermingham

    For many years, the accepted method of Measuring the Velocity of Detonation (VOD) in blast holes has been to use an electric cable of a constant resistance per metre. Thus as the wire is consumed by t

    Jan 1, 2011

  • ISEE
    Controlled Explosive Fracturing

    By Ulrich Leiste

    If the iron ore loss is 15% in the process of mining, the total iron ore loss in the world will be about 461 million tons, this is equal to the total production of 230 iron ore mines each of which pro

    Jan 1, 2014

  • ISEE
    Improving open-pit blast design through rock hardness estimation and prediction based on Measurement-While-Drilling data: Applications in large copper mines in Chile.

    By Sebastián Seria, Jorge Álvarez, Diego Cáceres

    The capacity to break the rock into adequate size fragments and in a cost-effective way is one of the main challenges in large open pit copper mines in Chile. That capacity is often compromised by the

    Jan 26, 2026

  • ISEE
    Predicting Vibration Through Linear-Regression Modelling

    By Anthony Konya, Calvin J. Konya

    The publication, RI8507, from the U.S. Bureau of Mines established an envelope equation that related scaled-distance to peak particle velocity in an attempt to predict ground vibration in the design p

    Jan 1, 2018

  • ISEE
    Reactive Ground Blast Management in a South Africa Open Pit Manganese Mine

    By Grant Small, Deon Pieterse

    Reactive ground conditions at an open pit manganese mine in the Northern Cape of South Africa resulted in an unexpected detonation.

    Feb 1, 2020

  • ISEE
    Global Implementation of Track and Trace Solutions and Challenges for Manufacturers

    By TTE-Europe GmbH

    A few years ago, the term Track & Trace for explosives was only known in Europe and Brazil at most; the introduction of this technology is experiencing an undreamt-of boom worldwide. More and more cou

    Jan 26, 2026

  • ISEE
    Effect of Blasting Vibrations from Deck Blasts on Pit Wall Stability

    "Large scale open pit mining and quarrying operations dictate safe and reliable pit wall stability. The current approach of employing the particle velocity-scaled charge distance approach to estimate

    Jan 1, 2017

  • ISEE
    Innovations for Improving Safety in the Mining Environment

    By Andre Pienaar, Larry Wilson

    Destruction of waste emulsion by blasting has been proven to be risky and disastrous incidents have been seen when using this practice. Our R&D department in conjunction with Lake International has de

    Jan 1, 2010

  • ISEE
    Blast optimisation at limestone quarry operations – good fragmentation, less fines

    By Benjamin Cebrian

    Rock blasting at quarries represents multiple challenges not easy to see at first sight. Aggregate industries face similar or superior prices for explosives while extracting a material that usually is

    Jan 1, 2010