Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Rion-Antirion Bridge - An Olympian Effort Overcomes Extreme Geohazards

    By Ricardo Dobry, Alain Pecker, George E. Leventis, Ralph B. Peck

    "This year’s DFI Outstanding Project Award is for the design and construction of the foundation scheme for the largest cable-stayed bridge in the world. In 1993, Gefyra, SA (a French/Greek consortium

    Jan 1, 2007

  • DFI
    Strength Behavior of Soilcrete Improved by Cement and Metakaolin

    By Guo Qian, Du Guangyin, Deng Yongfeng, Liu Songyu, Wang Ningping

    "Metakaolin (MK) can efficiently enhance the strength and the impermeability of concretes and mortars. However, it has rarely been attempted in admixtures of cement-stabilized soils until presently. A

    Jan 1, 2015

  • DFI
    A Study Of Aspects Of The Historical Development Of Geotechnical Engineering

    By Thomas J. Kennedy, Michael D. Bennett

    The study of geotechnical history is well-established. Most geotechnical practitioners, teachers, and graduate students have some grasp of the origins of the field. However, this understanding often c

    Oct 1, 2022

  • DFI
    Seepage Barrier at Bolivar Dam

    By Mohamed Elgouhary, Carol L. Tasillo, Daniel Koziol

    "The Bolivar Dam, located near the Village of Bolivar, Ohio is one of a system of dams designed to provide flood control and water conservation in the Muskingum Watershed. The Bolivar Dam is a “dry da

    Jan 1, 2016

  • DFI
    Newtown Creek Pile Foundation Work 2009

    By Thomas Trochalides

    Newtown Creek Water Pollution Control Plant in Brooklyn, NY is the largest of 14 Water Pollution Control Plants in New York City. It services over 1 million people with a current processing capacity

    Jan 1, 2010

  • DFI
  • DFI
    Construction Of Long Tubular Column Foundations Under Deep Water ? Synopsis

    By C. L. Liao

    The chief experiences for constructing deep tubular columns foundation under deep water are as follows: 1. P.C. tubular columns were sunk inside the caisson. 2. P.O. tubular columns of 3.6 M. diameter

    Jan 1, 2010

  • DFI
    8000 Series Piling Rig

    By Roger A. Bullivant

    The introduction of this size and type of piling rig is intended to address a multipurpose foundation activity. The 8000 denotes the size of equipment that is attached to the mast, namely 8000 Kg. Lar

    Jan 1, 1995

  • DFI
    Using Multiple Pile Types On A Single Project To Maximize Benefits

    By James F. Davis, Matthew A. Conte, Robert F. Tonning

    This is a paper demonstrating the steps taken to combine multiple types of piles for a single site to maximize the benefits and characteristics of each method. We intend to discuss the use of grouted

  • DFI
    Innovations and Challenges during Urban Development – Shoring and Foundations of Canada’s Tallest Residential Building

    By Shawna Munn, Nadir Ansari, Toben Jerry

    With ever increasing demands on space in urban environments and smaller available footprints, buildings are being designed to increasing heights to meet the need. This case study discusses the increas

    Jan 1, 2019

  • DFI
    Monitoring Auger Cast In Place Pile Construction And Testing In Hard Clay

    By C. Vipulanandan

    Installation procedure and the quality of the material used in the construction have significant effects on the behavior of the Auger Cast in Place (ACIP) piles. In this study, Installation and curing

  • DFI
    Applying The Carbon Hierarchy To Geotechnical Contractors

    By J. E. De Waele, J. J. Lee, M. J. Mulheron, Luke R. Deamer

    There is increasing demand for geotechnical contractors to commit to carbon reduction, net zero or science based targets. A lot of focus has therefore been placed on using low carbon materials and low

    May 1, 2022

  • DFI
    Monitoring Auger Cast in Place Pile Construction and Testing in Hard Clay (c1a730a8-7e87-4cd7-85b2-336e4f7995da)

    By Onur Guvener, Kalaiarasi Vembu, C. Vipulanandan

    "Installation procedure and the quality of the material used in the construction have significant effects on the behavior of the Auger Cast in Place (ACIP) piles. In this study, Installation and curin

    Jan 1, 2017

  • DFI
    Behavior Of Large Bored Piles With Grouted End

    By Zhang Yaonian

    This paper describes full-scale tests on ten large bored piles with grouted end conducted for three projects in the urban area of Fuzhou city. Test program included site investigation, pile installati

    Jan 1, 2004

  • DFI
    Performance of Footings in Rock Based on Serviceability

    By C. M. Haberfield

    "1 INTRODUCTION Around the world, there is a demand for larger structures, tall buildings and large bridges. While good footing design is important for all structures, it is even more important in the

    Jan 1, 1900

  • DFI
    Analysis Of Driving Stress Measured In The RC Long Pile

    By Yu Zhenquan

    At the construction site of Bao Shan Iron &. Steel Mill in Shanghai, lots of RC driven piles with length of 50 to 60m were applied. The most unfavourable distribution of stress along the pile shaft wa

    Jan 1, 1991

  • DFI
    The Final Piece of the Puzzle: Re-Design Of Grouted Closures for a Dam Cutoff Wall

    By Daniel P. Stare, Lucian P. Spiteri, Christopher M. Hallahan, James C. Myers

    Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable dam safety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall (SM

    Jan 1, 2019

  • DFI
    Case Study: Natomas Levee Improvement Program Cutoff Walls

    By Matthew D. Marks

    The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applicab

  • DFI
    Case Study: Natomas Levee Improvement Program Cutoff Walls

    By Matthew D. Marks

    "The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applica

    Jan 1, 2017

  • DFI
    Influence Of Freeze–Thaw Cycles On Strength And Heavy Mental Leaching Performance Of Petroleum Drilling Mud Stabilized By Waste

    By Tian Miaomiao, Cheng Yin, Shen Jun, Yu Hao, Li Yafei

    Vast amounts of waste drilling mud containing heavy metals is produced during oil drilling process, which causes great pollution to the environment. Therefore, it needs to be treated until it is harml

    Nov 1, 2022