Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Optimizing Plant 2 at Kinross Paracatu, the World’s Largest Tonnage, Lowest Grade Primary Gold Milling Operation

    By Kevan Ford, Getulio Junior, Rob Henderson, Wayne Philips, Chris Martin, Rob Thorpe

    "Plant 2 at the Kinross Paracatu gold operation in Minas Gerais State, Brazil, was commissioned in late 2008. Designed to be the largest tonnage, lowest grade gold milling operation in the world, Plan

    Jan 1, 2011

  • CIM
    On-site evaluation of diesel contaminants produced by an electronically controlled diesel engine

    By Michel Grenier, Robert Scott, Mahendra Gangal, Andrew Dasys

    This research project which took place at Brunswick Mining and Smelting's Brunswick mine, was undertaken to assess the ability of new diesel engine technology to meet current and anticipated unde

    Jan 1, 1994

  • CIM
    The Use of Rubber Mill Liners at Denison Mines Limited

    By L. Connolly, F. R. De Luca

    "Rubber liners at Denison Mines Limited are used in 10 1/2x 24' low discharg0 pebble mills. These were originally 10 1/2 x 13 Dominion overflow type ball mills. Experience here shows that the wear of

    Jan 1, 1974

  • CIM
    A pilot-scale evaluation of the effect of grind size on the recovery of a UG2 platinum ore

    By Trevor Harris, Martin Harris

    "This paper evaluates the effect of grind size on the flotation performance of a platinum ore from the UG2 reef of the Bushveld Igneous Complex, in South Africa. The study was conducted on the Mintek

    Jan 1, 2002

  • CIM
    The Effect of Particle Production History on Gold Leaching

    By Jessica Egan, Daniel Hodouin, Claude Bazin

    "The recovery of gold by leaching is influenced by the size of the gold carrier particles and the chemical environment. Using the relationships between the leaching rate, infinite recovery and particl

    Jan 1, 2009

  • CIM
    Novel Vat Leaching System

    By W. J. Young, K. B. Macneill, C. N. Smith

    "A BRIEF HISTORY OF THE MURRAY BROOK MINERAL DEPOSITDuring the mid-1950's intensive exploration activity in northern New Brunswick followed the discovery of the world class Brunswick base metal deposi

    Jan 1, 1993

  • CIM
    Optimizing Performance at the David Bell Mine Concentrator

    By K. Meyer

    "The largest cost centres of the David Bell Mine concentrator are grinding, leaching and effluent treatment. Optimizing results during the 6th year of operation are listed below: o SAG mill slurry den

    Jan 1, 1991

  • CIM
    The Pierina Project: From Acquisition to Production

    By Barrick Pierina, John Frostiak, Igor Gonzales, Kenneth G. Thomas, Ken Manning

    "1.0 SummaryThe Pierina deposit was acquired in August 1996 when Barrick Gold Corporation purchased Arequipa Resources, a junior mining company with extensive land positions in Peru. At the time of ac

    Jan 1, 2000

  • CIM
    Design and Construction Evolution of the Kemess Mine Tailings Dam

    By Georgia J. Lysay

    The Kemess Mine tailings impoundment is retained behind an earthfill and rockfill dam that, when complete, will measure about 140 m in height with a crest length in excess of 1 km. Due to weak foundat

    May 1, 2007

  • CIM
    Induration Machine Advanced Process Control (APC) at the Iron Ore Company of Canada

    By Robert J. Kuhne

    The Iron Ore Company of Canada has successfully employed advanced process control (APC) to optimize the operation of their induration machines. A significant increase in machine throughput and a redu

    May 1, 2007

  • CIM
    Effect of Various Additives on Valuable Metals Recovery from Copper Cliff Converter Slag

    By A. Mitrašinovic, A. Wolf

    "The aim of this investigation was to determine the most suitable additive for recovering metals from converter slags generated during Ni extraction. Fluxes analyzed were silica and lime and reductant

    Jan 1, 2015

  • CIM
    The Use of Tomographic Imaging in Mineral Exploration

    By A. Fawcett, B. C. Dyer

    Abstract - The basis of the tomographic velocity imaging technique is briefly described and an application of the method to detect and image a cross-section through a chromite pod is presented. Using

    Jan 1, 1994

  • CIM
    High Chromium White Irons for Slurry Pump Service in Mineral Processing

    By Rees J. Llewellyn

    High chromium white irons can be formulated to provide required combinations of abrasion and erosion wear resistance, toughness and capability to withstand corrosion attack. As a consequence, they are

    May 1, 2004

  • CIM
    Pyrrhotite Rejection at Strathcona Mill - DETA/SMBS Plant Trials

    By J. Coffin, R. Multani, C. Deredin

    Glencore’s Strathcona Mill has recently evaluated a pyrrhotite depressant combination of diethylenetriamine (DETA) and sodium metabisulfite (SMBS) to improve its overall plant pyrrhotite- pentlandite

    Jan 1, 2019

  • CIM
    Comminution Circuit Comparison Conventional versus Semi-Autogenous

    By G. H. Babcock, D. A. Knight, V. G. Medina

    "Production commenced at the Golden Sunlight Mine in 1983 and at Kidston Gold Mine in 1985. These projects were both constructed under the management of the Placer Dome Inc. (Technical Services) group

    Jan 1, 1991

  • CIM
    Destruction of Cyanide in Tailing Pond Reclaim Water Using Peroxymonosulfuric Acid at Barrick Goldstrike

    By M. Drozd, A. Ibrado, P. Butcher

    While effective in treating refractory sulfide ores, pressure oxidation leaves carbonaceous matter unscathed and able to adsorb gold from cyanide solutions. Barrick Goldstrike's strategy to mitig

    Jan 1, 2005

  • CIM
    Reflectance Spectroscopy with X-Ray Fluorescence for Rapid Slurry Analysis

    By Olli Haavisto, Juha Timperi

    "Accurate on-line assays of mineral slurries are the basis for effective operation of flotation circuits. Typically the elemental content measurements are obtained by an X-ray fluorescence (XRF) analy

    Jan 1, 2016

  • CIM
    Inspection Techniques - Non-Destructive Evaluation – Mill Gear Inspection Using Eddy Current Array (ECA) Combined With Alternating Current Field Measurement (ACFM) Techniques

    By Tom Shumka

    "All mineral processing facilities that use girth gear driven mills need to inspect the gear teeth on a routine basis, whether it be every six months to every three years. The inspection frequency dep

    Jan 1, 2012

  • CIM
    Current Trends in Heap Leaching

    By R. B. Throndycraft

    "1. Belt-Drop Agglomeration Preferred at Heap Leach Operations. The agglomeration method now preferred at heap leach operations utilizes belt-drops along conveyors. Belt-drop agglomeration is being de

    Jan 1, 1989

  • CIM
    Process Development at the Raglan Concentrator

    By Joe Holmes, Peter Langlois

    "Falconbridge’s Raglan Concentrator, located at the northern limit of Quebec’s Nunavik Region, has been in operation since December 1997. Originally designed to process 800,000 tonnes per year of high

    Jan 1, 2001