Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Magnetic Processing of a Rare Earth Element Bearing Ore

    By Adam Jordens

    Along with gravity separation and froth flotation, magnetic separation is one of the most common techniques for separating minerals. Minerals are separated by a magnetic force that is dependent on a c

    Aug 1, 2013

  • CIM
    Arsine Risk Management at CCR’s Electrolyte Purification Plant

    By A. Majumdar, B. Servière, H. Persson

    The CCR refinery, which was built in 1931, treats both internal and third party copper anodes to produce 325,000 mt of copper as cathodes. These anodes contain high levels of impurities, such as Ni, A

    Jan 1, 2019

  • CIM
    Use of LCA in the Mining Industry and Research Challenges

    By Pascal Lesagel

    Life Cycle Assessment (LCA) is a holistic environmental assessment tool that allows the compilation and evaluation of the inputs, outputs, and potential environmental impacts of a product or service t

    Nov 1, 2008

  • CIM
    Use of a Chelating Agent in Kinetic Studies for Contaminated Neutral Drainage Prediction of Metal Bearing Waste Rocks

    By P. Plante

    Contaminated neutral drainage (CND) is characterized by the presence of metal concentrations above regulatory requirements at circumneutral pH in mine drainage. The generation of CND by tailings and w

    Aug 1, 2013

  • CIM
    Material Status Index in Support of EVM

    By O. Moselhi

    Material can be seen as the fuel needed to execute the project from inception to completion. Material installed provides good indicators of progress achieved onsite vis-a-vis project schedule performa

    Aug 1, 2013

  • CIM
    Active area control in a fuel cell flow field

    By D. P. Wilkinson

    Flow field design is critical to determining fuel cell performance with respect to operating conditions. Flow fields are normally designed around their maximum power operating point with the goals of

    Jan 1, 2005

  • CIM
    Loading and Blasting a Hot Pillar Remnant

    By Roland Hunt

    This paper deals with the practical problems as sociated with blasting a heated pillar remnant. This pillar remnant was the final stage in the blasting of a multi-stag e pillar blast. Production from

    Jan 1, 1977

  • CIM
    Integrity Monitoring Of Xstrata Copper's Kidd Metallurgical Division Mitsubishi 3-Line Furnaces Using Multivariate Methods

    By P. Nelson

    Extending the campaign life of the Mitsubishi furnaces at Xstrata Copper's Kidd Metallurgical Division Copper Smelter has been a major focus of attention for many years. One aspect of this effort

    Jan 1, 2007

  • CIM
    Oil and Gas in Ontario

    By R. B. Harkness

    Many of us are familiar with the history of oil in the Province of Ontario, but for the benefit of those who have never heard the story I will repeat it. In 185 7 J. H. Williams, of Hamilton, an old-c

    Jan 1, 1924

  • CIM
    Nexgen Energy’s Rook I Project, Southwestern Athabasca Basin, Saskatchewan: The Next Generation Of Uranium Operations

    By Troy Boisjoli

    Since its discovery in February 2014, the Arrow Uranium Deposit has undergone rapid development through aggressive and systematic drilling programs and is now being progressed through advanced enginee

    Jan 1, 2020

  • CIM
    The Earth Moving Equipment Safety Round Table Design Evaluation for Equipment Procurement Process

    Diverse and considerable energies are associated with mobile equipment operated and maintained on mine sites. Loss of control of these energies is a common cause of injury on mine sites and this is we

    Aug 1, 2013

  • CIM
    Evolution Of Environmental Monitoring Programs At Canadian Uranium Mines And Mills

    By Patty Simpson, Sarah Benson

    In an effort to improve consistency across the nuclear industry, over the past 10 years the Canadian Standards Association has developed a series of standards related to environmental management at Cl

    Jan 1, 2020

  • CIM
    Application of ERP System Module as a Mine Foreman Assistance

    By A. Burduk

    The traditional approach to managing information flow between a mine underground and overground, applied in copper mines of KGHM Polska Miedz S.A., is mostly based on exchanging spoken information usi

    Aug 1, 2013

  • CIM
    Characterization of Aluminium Alloy Sheets Accumulative Roll-Bonded at Different Temperatures

    By P. Homola, M. Karlík, M. Slámová

    "Aluminum sheets (AA1199, AA8006, and AA5754) were processed by accumulative roll-bonding (ARB) in the temperature range from 20 to 350°C. The microstructure of the sheets was characterized by means o

    Jan 1, 2018

  • CIM
    Relationship between Porosity and Surface Deposit Coverage for Wire and Arc Additive Manufactured Aluminium Alloy 2319

    By K. E. Harley, M. J. Whiting, T. J. Sabin, E. M. Ryan, J. F. Watts

    "Wire and Arc Additive Manufacturing (WAAM) has the potential to enable a very significant reduction in buy-to-fly ratio compared to conventional manufacturing through the ability to build near-net sh

    Jan 1, 2018

  • CIM
    Determination of Refractory and Castable Quality in Operating Industrial Furnaces, Using a Stress Wave Reflection Technique

    The quality of refractory bricks and castables could be determined by direct measurements of their material properties such as elastic properties, porosity, density, etc. using conventional static or

    Jan 1, 2005

  • CIM
    Kinetic study of methanol oxidation at different temperatures using a new and improved electrochemical cell design

    By R. Baker

    A novel electrochemical half-cell and corresponding working electrode were designed to evaluate the electro-catalytic activities of catalysts in an environment close to that of an operating proton exc

    Jan 1, 2005

  • CIM
    Update on Falconbridge's Sudbury Nickel Smelter

    By J. Chenier, M. Boissoneault, D. Ducharme, R. Schonewille

    The operation of Falconbridge's Sudbury nickel smelter has undergone significant change since the production was consolidated to a single electric furnace in 1994. In the late 1990's a capit

    Jan 1, 2005

  • CIM
    Cold Water Thawing of Frozen Placer Gravel

    By John Lund

    INTRODUCTION GOLD-BEARING placers of Alaska and the Yukon Territories are buried under a layer of permanently frozen alluvial overburden, or 'muck', which varies in depth from twenty to one

    Jan 1, 1951

  • CIM
    Some Geological Features of the Swayze Gold Area

    By H. C. Rickaby

    Introduction The township of Swayze, from which the Swayze gold area derives its name, is in the Sudbury mining division, approximately 150 miles northwest of Sudbury. The gold area may be regarded a

    Jan 1, 1933