Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Rougher Flotation Cell Pulp Level Control to Increase Recovery

    By Mark Ferra

    Flotation is used in mining to produce concentrates of copper, gold and several other valuable ores. In 2017, a copper mine near Globe, Arizona improved their rougher cells productivity using technica

    Jan 1, 2019

  • CIM
    Brief Description of Similkameen Concentrator

    By R. W. Nice

    "The Similkameen Mining Company property is situated about 9 1/2 miles south and west of Princeton B.C. Owned and operated by Newmont Mining Corporation, mining is presently taking place in the Ingerb

    Jan 1, 1975

  • CIM
    The “Mill Redesign Project” at INCO’s Clarabelle Mill (54ceb038-1593-4f87-9a10-6e2a572d48df)

    By Jim Truskoski, Alain Bouchard, Andy Kerr, Germain Labonté, Jim Barrett

    "Improving mill grade recovery relationships is always good business. INCO’s Clarabelle Mill has just undergone a $16 million process upgrade that was designed to improve nickel recovery by 2%. The “M

    Jan 1, 2003

  • CIM
    Heterogeneity of Low-Grade Ores and Amenability to Sensor-Based Sorting

    By A. Mazhary

    "Although ore sorting in mining is not a new concept, sensor-based sorting has failed to gain broad acceptance due to perceived challenges with the technology. In order to gain wider applications, thi

    Jan 1, 2015

  • CIM
    The Use of Mine Sequencing Controlled Through Numerical Modelling and Instrumentation to Destress a Highly Burst Prone Sill Pillar - Draft

    In order to maintain a production rate of 6,000 tonnes per day from underground at the Williams Operating Corporation, two independent mining areas were required which created a long narrow sill pilla

    Apr 1, 2005

  • CIM
    The Cigar Lake project — Mining, ore handling and milling

    By 12670

    The Cigar Lake project will develop the world’s second largest high-grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U3

    Jan 1, 2004

  • CIM
    Reducing Mercury Production at Bald Mountain Gold Mine

    By Jim Wickens, Vince Lofftus, Mark Kravetz

    "This paper discusses how Bald Mountain Gold Mine (Ely, NV) dramatically reduced mercury production by treating process solutions with a liquid reagent based on organic sulfide chemistry. Cherokee Che

    Jan 1, 2001

  • CIM
    Ingénierie de la maintenance, de la conception à l?exploitation

    By Turcotte. Yves-Laurent

    Notre conférencier, Monsieur Yves L. Turcotte, Vice-président et Directeur général chez Promaintech Novaxa est diplômé en génie industriel de l?Université du Québec à Trois-Rivières et détient une maî

    Feb 1, 2008

  • CIM
    Observation of Ore Pass System Performance at Brunswick Mine

    Brunswick Mine employs an ore and waste pass system for material transfer. This paper reviews the evolution and performance ore pass systems at the mine. It presents the range of selected configuratio

    Feb 1, 2008

  • CIM
    Hydro-geotechnical and geochemical characterization of column consolidated cemented paste backfill

    By T. Belem

    The main objective of this study is to better understand the effect of underground CPB placement conditions on its microstructural, hydro-mechanical and geochemical properties. To reach this objective

    May 1, 2007

  • CIM
    Application of expert systems for peak power management

    By Y. L. Su, S. Vongpaisal, H. A. Smith

    "It is extremely difficult for a mine's central control room operator to control peakpower demands and to maintain normal materials handling operations at the same time. An investigation of the F

    Jan 1, 1993

  • CIM
    Man power in the Mining Industry

    By John J. Deutsch

    "1T is a great pleasure for me to be present at the Annual Dinner of the C.I.M.; a pleasure which is combined with a mutual opportunity that I value highly. First of all, this occasion gives me a chan

    Jan 1, 1966

  • CIM
    Optimizing Performance in Heavy Equipment Teleoperation

    By Jean-François Lapointe

    Many advances have been made concerning the automation of heavy equipment teleoperators such as those found in mining. Complete automation, however, is not achieved yet and the operation of these vehi

    May 1, 2001

  • CIM
    Huronian geology and the Blind River (Elliot Lake) uranium deposits

    By James A. Robertson

    "In the Blind River area Proterozoic clastic and sedimentary rocks and minor volcanic rocks (The Huronian Supergroup) uncomformably overlie and trangress northwards over dominantly granitic Archean te

    Jan 1, 1986

  • CIM
    Selection of rock depressants based on laboratory kinetic studies

    By Gordon E. Agar, Brian Lyons, Gregory H. Styles, William B. Kipkie

    "Rock rejection during the flotation of a copper-nickel ore was improved by adding carboxymethyl cellulose to both a rougher and cleaner flotation stage. The selection of the rock depressant was based

    Jan 1, 1987

  • CIM
    Advances in Mine Engineering to Enable Information Mobility for ?Intelligent Mining?

    By Leslie McHattie

    ?Intelligent mine? conjures up a futuristic image of unmanned extractors and loaders working in harsh conditions in a remote lunar landscape. The promise of increasing mine fleet productivity and solv

    Aug 1, 2013

  • CIM
    Development and field testing of a tension measuring gauge for cable bolts used as ground support

    By P. Choquet, F. Miller

    "The development and testing of a simple low-cost gauge for measurement of tension in a cable bolt grouted in a borehole are presented. Its principle is based on a resistance wire which is wound on a

    Jan 1, 1988

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • CIM
    Design and Implementation of Advanced Automatic Control Strategy Based on Dynamic Models for High Capacity SAG Mill

    By Rodrigo Toro, Ivan Yutronic N

    "The Copper Concentrator Plant of Compañía Minera Doña Inés de Collahuasi (CMDIC) is composed of three grinding lines, the third one being the largest. Due to the capacity feature of the third line, s

    Jan 1, 2010

  • CIM
    Kinetics and Mechanism of the Low-Temperature Water-Gas-Shift Reaction on Au/CeO2 Catalysts

    By M. Kinne

    Catalyst preparation/ characterization Slightly modified DP (~Schumacher et al. Catal. Lett. 89, 109, 2003) CeO2 HAS 15 from Rhodia calcined in air for~ 2h BET: ~188m2/g, particles size: 5.7nm (TEM

    Oct 1, 2003