Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Use of Steel Arches in Supporting Underground RoadwaysBy Louis Frost
The coal-mining industry of Nova Scotia, particularly of the island of Cape Breton, today faced as no other industry with economic problems calling for progressive engineering with production on an ec
Jan 1, 1928
-
Smelting Iron Oxide Pellets in the Shaft-Electric FurnaceBy G. V. Sirianni, G. E. Viens, R. A. Campbell, G. N. Banks
A combination shaft-electric furnace for the smelting of ores and the melting of metallized feed is being developed at the Mines Branch. When iron oxide pellets are smelted in this unit, they are preh
Jan 1, 1971
-
Numerical Analysis of Released Energy during Unstable Rock Failure under True-Triaxial Unloading ConditionBy A. Manouchehrian, M. Cai
"Rockburst, which often occurs around underground openings in highly stressed hard rocks, is a sudden and violent unstable rock failure and is associated with energy release. Rockburst is very dangero
Jan 1, 2015
-
Geology of the Clinton Creek asbestos deposit of Cassiar Resources LimitedBy D. R. BUDINSKI
Clinton Creek Mine in west-central Yukon produced 0.94 million tonnes of fibre from 15 million tonnes of asbestos ore between 1968 and 1978. The mine closed in 1978. The deposit lies along the margin
Jan 1, 1984
-
Addressing Canada’s mining legacy — How government uses modern technology to evaluate and monitor long-term stability and land use in Canada’s historic mining districtsBy M. C. Bétournay, J. E. Udd
"The legacy of abandoned mines in Canada creates issues that impact on both the health and safety of Canadians and the environment. Solutions to the problems of abandoned minesites require a detailed
Jan 1, 1997
-
Impact on Mill Design and Flotation Control of New Discoveries in the Relationship between Macro and Micro GrindabilityBy J. H. Starkey
Large differences between macro and micro grindability relationships have been discovered for mill design measurements using the patented SAGDesign(TM) test. Crushing, Rod and Ball Mill Wi tests, and
Jan 1, 2009
-
A Horizontal-Type Mine ModelBy A. J. Pearce
MOST mines have a model of some kind to illustrate either geological structure, mining operation, or some special condition or feature of the property. The type used depends on the particular feature
Jan 1, 1945
-
Use of Numerical Methods, Scale-Up and Lab Tests in the Design of HPAL AutoclavesBy J. Jung, W. Keller, A. Zucht
"The agitator design for nickel high pressure acid leach autoclaves (HPAL) is critical with regard to the process result, i.e., the recovery rate. Further considerations during the design phase are th
Jan 1, 2012
-
The rebirth of Corbin: the Byron Creek Collieries storyBy J. Aiello
"Introduction Byron Creek Collieries Limited Corbin mine is located in southeastern British Columbia approximately 180 air kilometres southwest of Calgary (Fig. I), twenty four kilometres south of Hig
Jan 1, 1985
-
Lower level operations in a thick steeply pitching seam at Cadomin Coal Mine; in Cadomin, AlbertaBy N. Melnyk
"FOREWORDThis paper provides a unique description of a method devised for mining a very thick steeply dipping seam of soft gassy coal which was prone to spontaneous combustion. The editors con¬sider t
Jan 1, 1985
-
Symposium on Mineral ExplorationBy W. G. Robinson
"MINING is one of Canada's most important industries and exploration is the life-blood of this dynamic and exciting business. The health and growth of the mining industry of tomorrow depends on the ef
Jan 1, 1967
-
Geology and Ore Deposits of the Matagami DistrictBy W. H. MacLean
The Matagami district lies directly west of Chibougamau on the north side of the Abi tibi greens tone belt. Ores at Matagami are volcanogenic massive sulphides and occur in the dominantly rhyolitic Wa
Jan 1, 1984
-
Filterability of Asbestos Fibres Used in Wet ProcessesBy M. S. Badollet
Introduction The manufacture of some asbestos products involves the use of asbestos in combination with water, cement and granular fillers. This type of production is often called the wet or semi-w
Jan 1, 1949
-
Enhanced Liberation In HPGR CircuitsHigh Pressure Grinding Rolls (HPGR) are said to be a good option in new grinding circuits. Due to their low energy consumption compared to other grinding systems such as SAG milling, there is a strong
Jan 1, 2012
-
Electrical Demand Reduction and Response Strategies for Underground MiningBy Nicholas C. Williams
This paper presents the development of a demand reduction and responsive strategy capable of reducing the electrical power demand, particularly during peak conditions. The work presented includes a ca
Aug 1, 2013
-
The Need for a Mine Erosion and Sedimentation Control Plan Guidance Document for Exploration, Construction, Operation and ClosureBy J. Clark
Erosion control during the mining cycle can be more effectively planned using Erosion and Sedimentation Control Plans (ESCPs). This raises the issue of who should develop an Erosion and Sedimentation
Aug 1, 2013
-
Technology and Operational Improvements in Tuyere Punching, Silencing, Pyrometry and Refractory Drilling EquipmentBy M. J. Marinigh
Increased safety requirements, higher operational costs, greater environmental restrictions, and new competitive processing techniques are the challenges smelter operators must confront in order to re
Jan 1, 2007
-
Handling Snow Lake Ore at Flin FlonBy M. N. Collison
"In 1960, with the opening of the Chisel Lake mine near Snow Lake, Manitoba, the Hudson Bay Mining and Smelting Co., Limited, commenced a new phase in their mining operation -that of bringing ore to F
Jan 1, 1966
-
Mining At Noranda (69fba177-b419-47b0-a3c4-b02c2dfc83f3)By Oliver Hall
WITH the friendly consent both of the Institution of Mining and Metallurgy, for whom this paper was written, and of the author, we had the pleasure of publishing Mr. Oliver Hall's paper on Mining
Jan 1, 1937
-
Large Flotation Cell Operation at Falconbridge Copper Limited – Opemiska DivisionBy J. R. Maxwell
In 1970 expansion was completed increasing mill capacity from 2,000 to 3,000 T.P.D. Actual grinding capacity is 3,400 T,P,D. at a grind of 60% -200 mesh,The ore bodies are vein type, containing about
Jan 1, 1974