Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Ductile Fracture of AA2198 Aluminum-Copper-Lithium Alloys in the Aeronautical Industry

    By J. Q. Chen

    The elastic-plastic behavior and the fracture mechanisms of two 2198 Al-Cu-Li thin sheets are investigated. The first material (2 mm thick) is in a recrystallized state after cold rolling. The second

    Jan 1, 2011

  • CIM
    Numerical Information System Supporting Safe Management Of Copper Post-Flotation Tailings Pond "Elazny Most", Poland

    By W. Swidzinski

    "Zelazny Most" post-flotation copper mine tailings pond is the only place to of storeing wastes for KGHM POLSKA MI EDZ S.A. The flotation tailings is are the main waste stream in copper mining in Pola

    Jan 1, 2007

  • CIM
    Water Control in the Bluebell Mine

    The Bluebell mine of The Consolidated Mining and Smelting Company of Canada Limited extends under Kootenay lake, in southern British Columbia, and water control underground has always been a major pro

    Jan 1, 1966

  • CIM
    Recovery of Fine Gold Particles Using a Falcon 'B' Separator

    By S. Gregory

    Many gold treatment plants have sulphides and coarse particle gangue components that contain gold in their tailings (cyanide leach residues and flotation tailings). Coarse and very fine liberated gold

    Jan 1, 2005

  • CIM
    Presidential Address, M.S.N.S. (bf4510d8-a24d-490d-bccc-7b42645f0b7b)

    By G. G. Bowser

    THE time has come when, as your President, 1 turn the helm over to my worthy successor. When 1 was reminded by our Secretary that 1 had to prepare an address for this meeting, 1 was at a loss for a su

    Jan 1, 1943

  • CIM
    The Effectiveness of Different Methods of Methane Drainage for Selected Longwall of Katowice Coal Holding

    By R. Loj

    Katowice Coal Holding (KHW) is one of the largest coal companies in Europe. The company owns five coal mines with a daily output of around 60 000 tons of coal. In the Katowice city area, very good qua

    Aug 1, 2013

  • CIM
    A Reservoir Study of the Excelsior Pool

    By W. A. Bain

    "AbstractProduction from the Excelsior Reservoir has amounted to approximately one million barrels. This production has caused a 'Pressure •drop of 10 p.s.i. from the original pressure of 1,245 p.s.i.

    Jan 1, 1952

  • CIM
    Experiences from an IREDES Prototype Project Production drilling with Atlas Copco Simba L6C Drill Rig at LKAB Kiruna mine

    By Mikael Ramström

    The IREDES Special Interest Group (SIG) for Drill rigs has been active since its inception at MineExpo 2000, in Las Vegas USA. The SIG for drill rigs is responsible for the development of a IREDES Dri

    May 1, 2003

  • CIM
    Strain-Controlled Thermo-Mechanical Fatigue Testing of Aluminum Alloys Using the Gleeble® 3800 System

    By X. -G. Chen, J. Qin, K. Liu, D. Racine

    "Understanding the thermo-mechanical fatigue (TMF) behavior of materials plays a significant role in the safety design of critical components used in aerospace and automotive industries, such as engin

    Jan 1, 2018

  • CIM
    Nor-Acme Mine (38a3a98c-c47b-464f-b6c8-c0ff6e104948)

    By J. M. Harrison

    "The Nor-Acme gold mine is near the shore of Snow lake, northern Manitoba, about 75 miles east of Flin Flon. The claims that form the nucleus of the present property were staked in 1927 by C. R. Parre

    Jan 1, 1954

  • CIM
    Silver Standard Mine

    By Alexander Smith

    "The Silver Standard mine is 6 miles by road northwest of New Hazelton, B.C., a small town on the northern line of the Canadian National Railways some l 75 miles northeast of Prince Rupert. The deposi

    Jan 1, 1949

  • CIM
    Barytes at Pembroke, Hants Co., N.S.

    By C. O. Campbell

    THE recognition by C. W. McKee, field engineer for Springer Sturgeon Gold Mines, Limited, in the fall of 1940, of the economic possibilities of a small outcrop of baryres near Pembroke, in Hants count

    Jan 1, 1942

  • CIM
    SAG & Ball Mill Control by Model Predictive Controllers on 3 Lines at Collahuasi

    By I. Yutronic

    Compañía Minera Doña Inés de Collahuasi's (CMDIC) Concentrator Plant is located at 4300 meters above sea level, approximately 2000 kms north from Santiago, Chile. The concentrator has three grind

    Jan 1, 2012

  • CIM
    Loads on Friction Props on a Longwall Face

    By H Zorychta

    Based on underground measurements made at the Nova Scotia coal mines of the Dominion Coal Company, Limited, this paper presents a comparison between the physical properties of hardwood packs and steel

    Jan 1, 1965

  • CIM
    TSP-Based Model for on-Site Material Handling Operations with Tower Cranes

    By Amir Zavichi

    Today, with the necessity of timely, on-budget and high quality completion of projects, proper use of construction equipment is essential to ensure project success. Construction equipment places a lar

    Aug 1, 2013

  • CIM
    Materials for power sources to meet military requirements

    By Andrukaitis. E.

    The increasing use of electronic equipment by the Canadian Forces has increased the importance of electric power. A power source that is packed with energy and yet light, small and durable is the comm

    Jan 1, 2005

  • CIM
    Cadia Expansion ? From Open Pit to Block Cave and Beyond

    The Cadia mine is shifting from the open pit operation to the Cadia East underground block cave. The resulting increase in milled tonnes and the decrease in fines production through shifting to block

    Jan 1, 2012

  • CIM
    Characterization of the 75% Gd0.8Sr0.2Co03_6 / 25% Ce0.9Gd0.102-8 composite cathode system for use in intermediate temperature solid oxide fuel cells

    By L. B. Kilius

    The composite cathode system based on Ce0.9Gdo.1O2_,5 electrolyte with a painted cathode was used for an intermediate temperature (500-700°C) solid oxide fuel cell. This cathode system was chosen due

    Jan 1, 2005

  • CIM
    Safety Leadership in Tough Times (People)

    Safety Leadership The management and leadership of a mining operation is a challenge at all times. The pressure to make production, safety, and environmental goals is intense. At some point mini

    May 1, 2009

  • CIM
    Laboratory Flotation Separation of Inco "Bulk" Matte

    By A. Mukherjee, C. Kelly, B. Markovich, G. E. Agar, G. E. Robertson, F. Khan, B. Shea

    "Laboratory batch flotation tests were performed on a sample of bulk slow cooled converter matte (Cu:Ni = I) to optimize the time in each of the separation stages. Numerical simulations were carried o

    Jan 1, 1996