    Plenary Presentation “Electrons to Dollars” - The Real Value In Geometallurgical Operations

    By K. J. R. Ford

    "Significant advances in mining and metallurgical operations have occurred over the last two decades, to define ore bodies via geological mapping, mineralogical analyses, geostatistical models and res

    Jan 1, 2013

  • CIM
    Automatic Generation of COBIE Data from Revit

    By J. Lee

    As the usage of BIM increased in the construction industry, some construction owners started exploring the use of BIM for maintaining their facilities. Construction Operations Building Information Exc

    Aug 1, 2013

  • CIM
    GET: A Function for Preferential Site Selection of Additional Borehole Drilling

    By M. Sharafodin, A. A. Hassanipak

    Abstract - The essential aims of additional borehole drilling are to improve the reliability of grade and tonnage estimates in each reserve class and to increase ore tonnages. The "GET" function prese

    Jan 1, 2004

  • CIM
    The Cigar Lake project - mining, ore handling and milling (1463a4ec-6903-4c1d-b800-831570ba9799)

    By C. R. Edwards

    "The Cigar Lake project will develop the world’s second largest high grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U

    Jan 1, 2002

  • CIM
    150th Anniversary Victoria Bridge, 1859 - mid-December, first train; 1860 August, celebration

    By H. J. McQueen

    ORDER OF PRESENTATION ?INTRODUCTION TO THE VICTORIA BRIDGE ?REASONS FOR A BRIDGE AT MONTREAL ?RAILROAD BRIDGE REQUIREMENTS ?IRON PRODUCTION CANADA / WORLD AL ?METALLURGICAL INDUSTRY CANADA ?FA

    May 1, 2011

  • CIM
    The G-9 Mine Story

    Overview ?G-9 Discovery Hole 420 drilled May 2005 ?14.16% Zn, 1.76% Cu ?Greenfield discovery built into the G-9 Mine in under 4 years. ?Utilized a unique ?Parallel Track? approach to fast-track min

    May 1, 2010

  • CIM
    Erosion/Corrosion Effects on the Design and Maintenance of a Potash Refinery

    By J. Davis, M. G. Reading

    "INTRODUCTIONInternational Minerals and Chemical Corporation (Canada) Limited operates two potash mine/refinery complexes near Esterhazy, Saskatchewan. Annual production of approximately 4.2 million t

    Jan 1, 1983

  • CIM
    Industrial Validation of the Functional Performance Equation – A Breakthrough Tool for Improving Plant Grinding Performance

    By Robert E. McIvor

    The Functional Performance Equation for Ball Milling” was first presented in 1988. It now has been used successfully in more than a dozen mineral processing plants. This powerful, yet simple tool prov

    Jan 1, 2005

  • CIM
    Enhancing the safety of remnant pillar recovery in lignite by numerical modelling

    By C. O. Aksoy, H. Kose, K. Heasley, E. Yalçin

    "In Turkey, the growing demand for lignite has resulted in increased lignite production and an emphasis on improving underground recovery. This has resulted in a gradual increase in the application of

    Jan 1, 2004

  • CIM
    Improving reliability and productivity at Syncrude Canada Ltd. through materials research: past, present, and future

    By S. Hoskins, S. Chiovelli

    "The annual budget for the repair and maintenance of equipment at Syncrude Canada Ltd. is in excess of $450 million. Of this amount, a significant portion can be attributed to the loss of material on

    Jan 1, 2004

  • CIM
    Geophysical Case Study of the Gallen Deposit, Québec, Canada

    By D. Bois, P. Keating, J. Lemieux, M. A. Vallée, M. Allard, R. S. Smith, L. Z. Cheng, M. Chouteau, D. K. Fountain

    "As part of a larger research program, a number of MEGATEM airborne electromagnetic (EM) test flights were flown over the Gallen massive sulfide deposit in northwest Québec. A particularity of this te

    Jan 1, 2007

  • CIM
    Leaching Behaviour and Metal Fixation Within Cemented Paste Backfill Materials

    By E. Fried

    Cemented paste backfill (CPB) is an innovative tailings management method that consists in returning considerable amounts of mine tailings into the underground mine openings. The filled stopes thus pa

    May 1, 2007

  • CIM
    Improved Cleaner Circuit Performance at the Degrussa Copper Mine with an In Situ Column Sparging System

    By E. Wasmund

    "Sandfire’s DeGrussa Copper-Gold operation in West Australia is a new high grade copper sulfide mine, which includes a 1.5 Mtpa concentrator which was completed in 2013.Early after commissioning, it w

    Jan 1, 2016

  • CIM
    Iron Ore Symposium

    By Jean G. Fortin

    The manufacturers' proposed technology has been a key factor in selecting production, mobile and fixed equipment in order to achieve the targets set in our 2026 mining plan. This paper will pres

    May 1, 2007

  • CIM
    Sophisticated Ring Geared Mill Drives Features and Experiences

    By Maarten van de Vijfeijken, Marco Rufli

    "By using the latest generation of medium voltage frequency converters, new possibilities have arisen to improve the grinding process. Beside all the direct and indirect advantages, several dedicated

    Jan 1, 2011

  • CIM
    Reducing CIP Tails Solution Losses at Goldcorp’s Campbell Processing Facilities

    By Monique Pharand, Jeet Basi, Simon Hille

    "High quality activated carbon is essential in the recovery of gold in Carbon-in-Leach (CIL), Carbon-in-Pulp (CIP), and Carbon-in-Column (CIC) circuits. Goldcorp’s Campbell complex at Red Lake Gold M

    Jan 1, 2016

  • CIM
    The Nanuq Diamond Project, Rae Domain, Western Churchill Province, Nunavut

    By Jennifer Pell

    Dunsmuir Ventures? Nanuq diamond project is located approximately 250 km northeast of Baker Lake and 170 km north of Chesterfield Inlet. It occurs at the intersection of the Wager Bay shear zone with

    May 1, 2004

  • CIM
    Explosions in Mines ? Systematic Failure

    In some parts of the world explosions in mines are more commonplace events. Even in the more developed nations explosions have occurred in recent times. In some cases these mines have significantly lo

    Aug 1, 2013

  • CIM
    Recovery of Platinum Group Minerals from Grinding Circuits: A Protocol for Prediction

    By N. Mejia, Z. Xiao, D. Fragomini, A. R. Laplante

    "The adaptation to platinum-group minerals (PGMs) of a protocol developed to predict gold recovery by gravity is presented. The protocol is based on three different data sets: ore characterization of

    Jan 1, 2004

  • CIM
    Sudbury Regional Seismic Network

    By Marty Hudyma

    Large seismic events have been reported in mines in the Sudbury mining camp for more than 70 years. Nevertheless, no detailed record of the events has been compiled. In 2008, the Sudbury Regional Seis

    Oct 1, 2010