Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Waihi Basin Structure in Light of Recent Geophysical Surveys

    By R L. Brathwaite

    As part of an investigation of the deep structure of the Waihi Basin, an extensive set of resistivity measurements was recently collected by DSIR Geology & Geophysics. The objective of this work i

    Jan 1, 1991

  • AUSIMM
    The Design, Construction and Commissioning of No. 2 Concentrator, Mount Isa Mines Limited

    The ore treatment expansion programme at Mount Isa Mines required the erection of a new lead-zinc concentrator to be known as No. 2 Concentrator. This concentrator was designed by Western-Knapp Engine

    Jan 1, 1968

  • AUSIMM
    Statistical Analysis of Sampling and Assaying Results, Drilling Campaign, King Island Scheelite Mine, Tasmania

    During the drilling campaign conducted between October, 1942; and May, 1943, to prove the extent of the scheelite deposit worked by King Island Scheelite N.L. at Grassy, King Island, Tasmania, 35 hole

    Jan 1, 1950

  • AUSIMM
    Gravity Concentration ù A Better Way (or How to Produce Heavy Mineral Concentrate and Not Recirculating Loads)

    By D Wyatt, J Domenico, W Kow

    Over the past few years developments in heavy minerals processing have concentrated on the mineral separation portion of the business. The best example of this would include new developments in rare-e

    Jan 1, 2001

  • AUSIMM
    Polymetallic Mineralisation Associated with Cenozoic Volcanism in Northern Puna, Argentina

    By M K. de Brodtkorb

    Late Cenozoic ore deposits æPrecious and base metal-richÆ and æSn-Ag-polymetallicÆ ofNorthern Puna are associated either with Middle Miocene dacitic volcanic-dome complexes or with Upper Miocene dacit

    Jan 1, 1995

  • AUSIMM
    The Harmonious Design on the Beneficiability for the Pt-Pd Ores Containing High MgO Gangue in Yunnan

    The Harmonious Design on the Beneficiability for the Pt-Pd Ores Containing High MgO Gangue in Yunnan

    Sep 13, 2010

  • AUSIMM
    Mill relining optimisation – a story of collaboration

    By P Rubie, B Morgan, J Russell, C Stewart

    The relationship between efficient liner exchange, concentrator availability and concentrator profitability is well documented. Russell Mineral Equipment’s (RME) relationship with OZ Minerals’ Promine

    Sep 11, 2017

  • AUSIMM
    Investigations of Massive Sulphide Mineralisation Along the Kermadec Arc 1996 - 2005

    By G J. Massoth, K Faure, A G, R G. Ditchburn, I J. Graham

    From modest beginnings in 1996, research into the mineral potential of New ZealandÆs Exclusive Economic Zone has progressed into a major multidisciplinary component of GNSÆs recently funded 6-year æMi

    Jan 1, 2005

  • AUSIMM
    Location of Seismic Events Associated with Caving Using Brightness Method

    By T de Wit, S Meyer

    The location of seismic events in mines is traditionally calculated based on the arrival times of P- and S-waves for a given velocity model (homogeneous or heterogeneous). This technique is successful

    May 9, 2016

  • AUSIMM
    Constraints and Advantages of the Crown Minerals Act and the Resource Management Act

    By A P. Brown

    Access arrangements required with landowners and occupiers; relaxation on size of permits; lack of confidentiality for information provided; one-stop shop under RMA, removal of standing; plethora of c

    Jan 1, 1997

  • AUSIMM
    Opportunities for the New Zealand Coal Industry

    Thank you for this opportunity to address your conference on 'The role of coal in the New Zealand energy market'. New Zealand's energy market has, in common with much of New Zealand, un

    Jan 1, 1990

  • AUSIMM
    A Tool for Benchmark Study of Roadway Development Performances

    In responding to why some longwall roadway development rates are different among mines, the Roadway Development Task Group (RDTG) of Australian Coal Association Research Program (ACARP) has initiated

    Dec 6, 2010

  • AUSIMM
    Trommel panel development for iron ore applications

    By R Wilson, R Williams, B Freeburn

    McLanahan RSS14x50 scrubber screens have individually processed over 50 Mt of Pilbara iron ore. The first stage of separation in these plants with abrasive, high specific gravity, large lumps is an ex

    Jul 24, 2017

  • AUSIMM
    Gold Mining in Australasia - Past and Present and Exploration Opportunities to the Year 2000

    Being a geologist I intend describing the renaissance of the gold industry in Australia within its geologic framework; there is a geological pattern to the numerous gold projects which have been broug

    Jan 1, 1990

  • AUSIMM
    Rock Pressures Induced by Weathering and Physicochemical Processes

    ABSTRACTRock stresses can be modified by physicochemical processes.If rock pores allow the ingress of water and oxygen, but are not large enough to permit the exit of larger molecules of weathering pr

    Jan 1, 1968

  • AUSIMM
    Preliminary Study on the Improvement of Afforestation Techniques Applied to Aggregate Mines in Japan

    Development of aggregate resources for use in structural concrete has been encouraged in Japan to support infrastructure improvement and national land conservation. Natural aggregate is a valuable res

    Dec 6, 2010

  • AUSIMM
    Field-Based Alteration Mapping Using the PIMA

    By N Merry, T Cocks

    The mineral exploration industry is increasingly aware of the importance of the relationship between mineralogical data and geochemical assay results. However, until recently, the cost and time constr

    Jan 1, 1995

  • AUSIMM
    Wetting Characteristics of Mineral Surfaces - Contact Angle Measurements through Molecular Dynamics Simulations

    Wetting Characteristics of Mineral Surfaces - Contact Angle Measurements through Molecular Dynamics Simulations

    Sep 13, 2010

  • AUSIMM
    Coagulation-Neutralisation Technology to Treat Wastewater from Lead-Zinc Concentrator

    Coagulation-Neutralisation Technology to Treat Wastewater from Lead-Zinc Concentrator

    Sep 13, 2010

  • AUSIMM
    What is Required for a Low-Cost Project Outcome?

    By M Dickie

    During the 1980s and early 1990s low cost gold treatment plants were at the forefront of the Australian engineering and mineral processing business. This opportunity was the result of a high gold pric

    Jan 1, 2009