Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Integration of New Technology System in the Mapping of Coal Quality at Yallourn East Field, Latrobe Valley, Victoria, Australia

    By Tilley J. L, Chicu D

    The development of the Yallourn East Field brown coal open cut has involved the adoption of novel investigational programs into coal qual- ity. For example, weighted average coal property statistics

    Jan 1, 1989

  • AUSIMM
    Paper No. 123. Some Modern Methods in Ore Treatment by Cyanidation.

    Before proceeding I wish to say that the excellent diagrams by which my paper is illustrated are the work of Mr. C. H. Barnes, Constructing Engineer of the Kalgurli Gold Mines Limited, and I am also m

    Jan 1, 1903

  • AUSIMM
    Using Waste From Sand Mining to Reduce Environmental Impacts Coming From the Stocking Process

    By L Soares, W T. Hennies, F Fujimur

    Barra Bonita reservoir, located in the Sao Paulo State, Brazil, has been mainly used for local navigation and electricity generation to supply a prosper region in the country. Sand mining activities i

    Jan 1, 2003

  • AUSIMM
    Metallurgical Properties of Synthetic Sylvanite

    A synthetic gold-silver telluride material (mainly sylvanite) has been prepared and its physical and chemical properties checked. Flotation tests using a Hallimond tube were conducted using commercial

    Jan 1, 1994

  • AUSIMM
    An Experimental Investigation of Deep Cutting Forces in Artificial Rock

    By Mostyn G

    In the last three decades various theories have been presented to allow the estimation of the force required to cut rock. These have generally relied on an hypothesised mechanism of chip formation.The

    Jan 1, 1993

  • AUSIMM
    Eloise Copper Mine Geology ù Back to Basics

    By A Baensch, E Grimsley

    Eloise Copper Mine is situated 56 km east-southeast of Cloncurry, Queensland, Australia. The deposit was discovered by BHP Minerals in 1986 during follow up diamond drilling of EM anomalies associated

    Jan 1, 2003

  • AUSIMM
    BHP Gold Mines/Devex Gympie Joint Venture Project and the Geology of the Goldfield

    The Gympie Goldfield was the sixth largest producer of gold in historic terms in Australia. The Joint Venture Agreement between BHP Gold Mines Limited and Devex Limited was signed in January 1987.

    Jan 1, 1989

  • AUSIMM
    Mineralogical Factors in the Processing of Archean Sulphide Gold Ores

    In the past ten years or so there has been a renewed interest worldwide in the processing of refractory gold ores. The Archean province of Western Australia contains both numerous and major gold de

    Jan 1, 1991

  • AUSIMM
    Structural Elements in Epithermal Gold Deposits of the Coromandel Peninsula, New Zealand (f4fa23c9-a199-48d5-8cf2-4b1ba5582f93)

    By Clarke DS, Sporli KB

    Structure is an important control in the localisation of gold mineralisation in epithermal systems. There has been, however, only limited investigation of the structural elements involved; such a stud

    Jan 1, 1990

  • AUSIMM
    Laboratory Investigation of Performance Characteristics of Self Drilling Bolts

    By Lu T. K

    A new type of rockbolting system, the self drilling rockbolt, has been studied to develop a 'single pass' bolt for use in rockbolt installation in underground engineering. This single pass b

    Jan 1, 1993

  • AUSIMM
    Slope Stability Radar for Monitoring Mine Walls

    Slope stability is a critical safety and production issue for open cut mines. The æslope stability radarÆ has been developed to remotely scan a rock slope to continuously measure the movement of the f

    Jan 1, 2003

  • AUSIMM
    Implementation and Feasibility of Remote Controlled Blast Hole Drilling at KCGM Æs Fimiston Open Pits

    By P Jago

    KCGMÆs Fimiston Open Pit, located in the centre of the historic Golden Mile, is situated above some 3000 kilometres of old underground workings. These workings, both level and vertical, present signif

    Jan 1, 2003

  • AUSIMM
    Low Shock Energy Emulsion Based Wet Hole Explosives

    By Moxon N. T

    A series of low shock energy water resistant emlulsion based explosives have been developed by combining inert materials, such as Perlite P500, into the formulation. The material handling, water res

    Jan 1, 1990

  • AUSIMM
    Plutonic Gold Project - Inception to Operation

    By Rowley M, Bradford P

    Plutonic Resources Limited (formerly known as Pioneer Mineral Exploration Limited) delineated, developed and operates the Plutonic Gold Mine located 180 kms northeast of Meekatharra, Western Austra

    Jan 1, 1991

  • AUSIMM
    Gold, Conveyor Belts, and Efficiency A Guide to Cleaning Belts and Improving Transfer Points on Gold Mining and Processing Conveyors

    Inefficient conveyors suffer carryback, leading to the build-up of materials on idlers, and other expensive components. They spill and leak material at loading zones and transfer points, causing acc

    Jan 1, 1991

  • AUSIMM
    Rockburst Prediction

    Rockbursts, as they occur in South African deep level gold mines, have a lot in common with natural earthquakes. Both violently release seismic energy and cause damage to underground and surface s

    Jan 1, 1986

  • AUSIMM
    Analysis of Haul Truck Tyre Costs in a Multiple Pit Surface coal Mine

    By Cox LT

    A short term tyre study of trucks operating in a multiple pit surface coal mine showed significant potential for cost savings. The tyre study, conducted on-site over a three months period covered a

    Jan 1, 1982

  • AUSIMM
    The Backfilling Philosophy for Massive Mining at Depth in the South Deep Section, Western Areas Gold Mine

    By A J. MacDonald, M P. Raffield

    The South Deep massive orebody consists of 20 to 30 m of payable conglomerates ranging in dip from 11¦ to 20¦ and at depths of between 2400 m and 3400 m. The mine design process selected a mining meth

    Jan 1, 1998

  • AUSIMM
    Developing a regional data catalogue to support the technical assessment of post-mining land use

    By C M. Côte, P Bolz, L Pagliero, M Edraki, M Shaygan, P Erskine

    Mines in Queensland must now prepare a Progressive Rehabilitation and Closure (PRC) plan, with the requirement to justify the selection of the post-mining land use (PMLU) for each rehabilitation domai

    Aug 2, 2023

  • AUSIMM
    Climate change risks to mine closure – planning for a range of impacts

    By N McIntyre, R Trancoso, N Bulovic

    Mining is essential for facilitating human development particularly as demand for critical minerals grows. However, over the mine life cycle, the environment is permanently changed. Once mining ceases

    Aug 2, 2023