Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Three-dimensional modelling and analysis of high-speed train-induced building vibration considering different soil types

    By O Kirtel, A A. Faizan

    With the rapid increase and development of high-speed trains (HSTs), the problems such as train-induced ground vibration and its dynamic effects on nearby structures have become a major environmental

    Nov 29, 2022

  • AUSIMM
    Mining Title Administration in the Northern Territory

    Exploration and mining title administration in the Northern Territory has changed dramatically over the last 20 years. These changes have occurred due to legislative amendments, technological develo

    Jan 1, 1994

  • AUSIMM
    Surface Monitoring, Understanding and Modification at Molecular Level in Mineral Beneficiation by Infrared External Reflection Spectroscopy

    By E Mielczarski

    Determination of the adsorbed layer composition and structure at molecular and atomic levels and understanding adsorption mechanisms and dynamics are vitally important for the preparation of surface l

    Jan 1, 2005

  • AUSIMM
    Simulation Modelling of Mining Systems

    This paper discusses the requirements for a successful simulation modelling study, and the steps involved in the modelling process. Advantages and disadvantages of simulation are described, and a case

    Jan 1, 2000

  • AUSIMM
    Methane Drainage Under the No. 7 Longwall Block Appin Colliery

    By Regan R

    Appin Colliery mines the Bulli Seam with a gas composition of 98.5% methane and 1.5% carbon dioxide. Relaxation of the strata generally occurs to below the base of the Wongawilli Seam, some 40 m be

    Jan 1, 1982

  • AUSIMM
    Fire Holes in Brown Coal - Implication on Mining and Trends in Investigation

    By Wood P. D, Pettifer G. R

    In the upper coal surface in the Latrobe Valley, craters known locally as fireholes have developed due to prehistoric coal fires. They can be several hundred metres across and up to fifty metres dee

    Jan 1, 1989

  • AUSIMM
    The Relationship Between Mineralisation and Depositional Environment in Early Proterozoic Metasediments of the Pine Creek Geosyncline

    Recent geological mapping has indicated changes to the stratigraphy of the Pine Creek Geosyncline. The new stratigraphy and interpreted depositional environments are examined in relation to the di

    Jan 1, 1984

  • AUSIMM
    Paper No. 195. Electrolytic Refining And Smelting at Port Kembla, New South Wales.

    SOME notes on the works of the Electrolytic Refining and Smelting Company of Australia will no doubt be of interest to members of the Institute, more especially as much of the work is new to Australas

    Jan 1, 1911

  • AUSIMM
    Paper No. 196. The Water Flume Conveyors of The Mount Lyell Mining And Railway Company Limited.

    THE power requirements of the Mount Lyell Mining and Railway Company at Queenstown, Tasmania, have, since the inception of smelting operations in June, 1,,896, been derived continuously from the exten

    Jan 1, 1911

  • AUSIMM
    Developments in Coal Mine Tailings Disposal and Rehabilitation

    The conventional approach to the disposal of fine coal mine tailings, which involves piping the tailings as an aqueous slurry to a storage where they remain in the form of a permanent wet deposit,

    Jan 1, 1991

  • AUSIMM
    The Economic Climate for Mining in New Zealand (01b7c1a3-c189-4335-9116-ee02100e1776)

    This paper presents a resume of the likely profitable mining areas in New Zealand. It covers the main "minerals" - gold, coal, oil and gas, ironsands, silica sands, clays, lump silica, perlite, sulphu

    Jan 1, 1990

  • AUSIMM
    Gold Deposits of Victoria: A Major Province within a Palaeozoic Sedimentary Succession

    The Palaeozoic succession of Victoria contains one of the world's major gold provinces with a total production of 2500 tonnes of gold. Larger deposits, including Bendigo (over 800 tonnes Au), a

    Jan 1, 1991

  • AUSIMM
    Water Management in the Fitzroy Basin ù Issues for the Mining Sector

    By E P. Donohue

    Changes to water industry practice are required as a consequence of the Council of Australian Governments water reform agenda which binds all states and territories to a range of measures intended to

    Jan 1, 2003

  • AUSIMM
    An Alternative to Cube-root Scaling Crater Analysis

    By Fourney W. L, Weaver T. A

    A large number of single borehole crater-forming shots were analyzed in terms of correlating the crater parameters with explosive weight. The objective was to determine a scaling rule for which the

    Jan 1, 1990

  • AUSIMM
    The Flotation Cell - A Critique

    Although the flotation cell has been under continuous development over the past 80 years, an understanding of the precise roles of a cell in produc- ing the flotation result had evolved slowly. In

    Jan 1, 1984

  • AUSIMM
    Analysis and Modelling of Airblast and Ground Vibration

    In the traditional analysis of airblast and ground vibration, it is often assumed that only that single blasthole possessing the maximum charge weight (or a small group of blastholes initiating in an

    Jan 1, 2004

  • AUSIMM
    The Development of an Ore Reserve Methodology for the Olympic Dam Copper Uranium-Gold Deposit

    The accuracy of an ore reserve is only as good as the geologist's understanding of the deposit. The methods that are applied to resource and reserve estimation reflect that understanding. At th

    Jan 1, 1987

  • AUSIMM
    Long-Hole Drilling for In-Seam Exploration

    By Hungerford F

    Long-hole drilling technology has rapidly advanced this decade beginning with rotary drilling/pump down camera surveying and culminating in down-hole motor drilling with cableless electronic surve

    Jan 1, 1988

  • AUSIMM
    Management of Ranger Uranium Mine Waters, Kakadu Region, Northern Territory, Australia

    By Bastias J

    The Ranger uranium mine has operated in the Kakadu region of the Northern Territory since 1979. The mine's water management system was designed to cater for the wet-dry monsoonal climate and to

    Jan 1, 1988

  • AUSIMM
    The Use of Blending Equipment in the Mineral Industry

    After the minim operation, most raw materials that occur in the earth's crust require some form of processing or refining before they can be converted into a final end product. In the mineral

    Jan 1, 1969