Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Process Control Integration into a Brownfields Iron Ore Plant as Applied to the Khumani Iron Ore MineBy D Matthews
With a brownfield project comes control integration challenges. The Khumani Iron Ore Mine’s second phase expansion posed a number of challenges as there was substantial brownfields work conducted. The
Jul 11, 2011
-
Development of a Cover System Design for Potentially Acid-Forming Tailings at Peak Gold MinesBy M, C Silveira, C Ellice, D Christensen
Peak Gold Mines (PGM), a member of the Rio Tinto Group, is an underground and open cut gold mining operation located near Cobar, NSW. A multi-phase study was initiated in 2001 in support of developing
Jan 1, 2003
-
Procuring Control and Intelligent Traffic Systems for Major New Build Projects – Avoiding Pitfalls and Maximising ValueBy G M. Taylor
The application of high technology to monitor and control fire life safety, critical functionality in tunnels and underground spaces generally has progressed at an ever accelerating rate over the past
Sep 17, 2014
-
Mercury Sorption on ClinoptiloliteBy K Friese, H P÷llmann
Clinoptilolites, modified with sodium, produced a material which has been tested for the ability to remove Hg (II) from aqueous nitric acid. The amount of adsorption depends on contact time, acid conc
Jan 1, 2008
-
Best practice sampling QA/QC for gold and base metal mining – including how to assess the applicability of underground reverse circulation grade control samplingBy J T. Carswell
Best practice mine sampling should provide a detailed quantification of all potential sources of error at each stage of sampling, sample preparation and assaying.Quality assurance (QA) should include
Sep 20, 2017
-
Improvements in Blast Fragmentation Models Using Digital Image ProcessingBy E Mofya, R Kaunda, P Lever
One of the fundamental requirements for being able to optimise blasting is the ability to predict fragmentation. An accurate blast fragmentation model allows a mine to adjust the fragmentation size fo
Jan 1, 2001
-
The Energy of Detonation: A Fresh Look at Pressure in the BlastholeCommercial explosives range from pure emulsions to pure ANFO, with blends of these providing interesting alternatives: energy is often adjusted through addition of aluminium, or the control of density
Jan 1, 2001
-
A Review of BHP - Utah Coal Limited's Dragline Stripping OperationsBHP-Utah Coal Limited operates 33 draglines of varying sizes in the Bowen Basin of Central Queensland. The group's operations with draglines commenced in 1963 with the establishment of opencut
Jan 1, 1989
-
Dust and diesel characterisation in underground coalminesBy N LaBranche
The resurgence of Silicosis and Coal Worker’s Pneumoconiosis (CWP) in coalmines has placed the spotlight back on the management of worker exposure to particulate matter across all mining sectors (Coal
Oct 12, 2022
-
Dust characterisation in Australian minesBy N LaBranche
The resurgence of Silicosis and Coal Worker’s Pneumoconiosis (CWP) in coalmines has placed the spotlight back on the management of worker exposure to particulate matter across all mining sectors (Coal
May 5, 2022
-
Mining as a complex system: do we need a new model?By R Valenta, A Littleboy
Geological heterogeneity is one dimension of complexity in mining. Significant effort is put into developing an understanding of this complexity so it can be used in resource estimation, mine planning
Nov 21, 2018
-
The Application of Seperate Conditioning to Improve Zinc Metallurgy at Woodlawn MinesBy Phelan JM
Poor selectivity in the separation of two sulphides generally arises because the flotation characteristics of the coarse sizes of the valuable mineral and finer sizes of non-valuable minerals are id
Jan 1, 1988
-
Integrating Environmental Factors into Mining Projects (591b660d-e8ad-4113-a4fb-e72d8a203993)There are a number of examples of how environmental factors have been integrated into the water management aspects of mining projects. The Kingston Lignite project in South Australia, Pine Creek Gold
Jan 1, 1988
-
Heritage Conservation of the Big River Mine, Reefton GoldfieldLike almost any other 19th century mining area, the West Coast saw its 20th century scrapping era when machinery which had been installed in seemingly inaccessible places was somehow dragged out again
Jan 1, 1996
-
Geology of BeltanaWillemite mineralization was discovered in 1966 in the North Flinders Ranges of South Australia, in the course of a stream sediment sampling programme. Further work outlined a total of nine separat
Jan 1, 1975
-
Iron Blast Furnace Combustion Reactions-Formation of Silicon Monoxide in the RacewayBy Cripps-Clark CJ, Deague TK
In order to study conditions under which SiO(g) may be formed in a blast furnace, equilibrium phase diagrams were constructed for the combustion of high and low ash cokes with oxygen-enriched blas
Jan 1, 1980
-
A Geostatistical Approach to the Pit Optimization ProblemsThe word "optimization", refers to the search of an economic optimum, or, more precisely, to the choice of technical parameters which will define the more profitable mining project, knowing the va
Jan 1, 1986
-
Selective Mining Techniques - TelferThe Ok Tedi Project has been planned as a selective mining operation since the Feasibility Study. The nature of the orebody, and the need to 'stage' the infrastructure buildup meant that ini
Jan 1, 1986
-
Copper, Gold and Subduction: A Trans-Pacific PerspectiveRajor intrusion-related Cu and Au dep- osits along the Cordilleran-type central Andean margin and in the western Pacific island arcs constitute a series of discrete, linear belts which correspond t
Jan 1, 1987
-
Conveying 150 000 Tonnes Per Day Per Multi Motor Drive Using Variable Frequency Start-upThe design and selection of components for belt conveyors is a well known procedure and many handbooks, catalogues and design manuals offer a wide range of detailed information which can be applied
Jan 1, 1978