Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An Expiremental Investigation on Cable ReinforcementBy Fabjanczyk MW, Aziz NI, Hii J
The paper presents the results of a series of pull out tests performed on roof reinforcement systems currently being adopted in mines in Australia 7mm wire, dividag bar, 15.2mm strand cable, and b
Jan 1, 1986
-
The High Productive Operation of a Small Blast FurnaceBy Fukui M
An increase in pig iron output by 50 per cent was aimed at after re-lining No.2 blast furnace of NAKAYAMA STEEL WORKS. This had to be achieved by increasing both the furnace volume (from 673 to 757
Jan 1, 1980
-
The Significance of Sedimentary Structures in the Willyama Complex, New South WalesBy Laing W. P
Sedimentary structures are described from the WiIlyama Complex, New South Wales. Their presence confirms lithological layering within the metasediments as bedding. These primary structures occur not o
Jan 1, 1975
-
Hydraulic Coal Mining - Development in New ZealandHydraulic transport of coal has been used for many years on the West Coast of New Zealand to extract small blocks of steeply dipping coal. Recent development at Strongman 2 Mine has seen the use of hi
Jan 1, 1998
-
No. 3 Ventilation Shaft: Shaft-Sinking EquipmentWith the sinking of the new No. 3 Shaft and the increasing depth and northward movement of the mining operations, improved ventilation of the mine workings became necessary and it was decided to sink
Jan 1, 1957
-
Four Metre Diameter Raise Drilling at Olympic Dam Project S.A.In the first half of 1987 two four metre diameter raise bore holes were drilled at the Olympic Dam Project for ventilation purposes. The first hole, 476 m x 4.0 m diameter was completed in 96 days
Jan 1, 1988
-
Current Drilling Practice at Isa MineBy Stevens P
The Isa Mine of Mount Isa Mines Limited currently produces 5.4 million tonnes of copper ore and 3.3 million tonnes of silver, lead and zinc ore annually. Of this, 5.1 million tonnes of copper ore
Jan 1, 1982
-
An Investigation into Spoil Stability at MouraBy Dunbavan M, Mallett C. W
The sequence of development and back analysis of the failure of a spoil pile in the 1B pit of the Moura Mine are given. The mode of failure was a two-wedge mechanism with a basal slip plane passin
Jan 1, 1981
-
Percolation Leaching of Bornite OreUp to 80 per cent of the copper in a bornite ore can be quickly leached with percolating acidified ferric sulphate solutions. The upper limit for rapid copper extraction is set by the conversion of bo
Jan 1, 1973
-
Olympic Dam: Some Developments in Geological Understanding Over Nearly Two DecadesThe Olympic Dam copper-uranium-gold-silver deposit, located approximately 520 km north-northwest of Adelaide, South Australia (Figure 1) was discovered in 1975 by Western Mining Corporation. A joint v
Jan 1, 1993
-
Supergene sulphide ore from the Mutooroo mine, South Australia: characterization and dissolution of copperBy Davey P. T, Tsambourakis G
Mineralogical analysis of supergene sulphide ore recovered from areas close to the underground workings at the abandoned Mutooroo (South Australia) mine shows that the original sulphide minerals have
Jan 1, 1986
-
Mount Isa Minerals Province - A New Mining CycleRecent mineral exploration successes in the Proterozoic rocks of the Mount Isa Inlier are unprecedented in the regionÆs history. This new era of discovery, particularly for æblindÆ deposits, owes its
Jan 1, 1998
-
Tunnelling Under Steep, Dangerous SlopesBy Shibata Y, Shimizu R, Fukushima A
Kobe is divided by the Rokko Mountains, runn- ing from east to west. The southern section of Kobe is highly developed in contrast with the northern section, but big, new residential pro- jects like
Jan 1, 1987
-
Ventilation Design and Practice at the Olympic Dam Mine, South AustraliaBy Clarke B. N
The Olympic mine is currently and development to 1988. The mine practice is, and number of factors. Dam copper-uranium-gold undergoing construction start production in May ventilation design a
Jan 1, 1988
-
Adsorption and Desorption of Mixed Gases on Coal and Their Implications in Mine VentilationResults of investigations on adsorption and desorption of CO M CH and a mixture of the two gases are described.4 Results showed that even when the equilibrium conditions contains 50% Co and 50% CH
Jan 1, 1988
-
Key Operating Parameter Comparison Ciurug Mine Design at Pongkor Gold Mine -- Java-IndonesiaPongkor Gold Mines is one of seven units of production owned by PT Aneka Tambang (State owned mining company). The mine is located in the western part of Java Island, Indonesia. It is in the Bogor Dis
Jan 1, 1997
-
PGM and Nickel-Copper Mineralisation in the Hartley Complex ZimbabweThe Hartley layered mafic igneous complex within the Great Dyke of Zimbabwe contains economically-recoverable quantities of platinum group metals and gold, nickel, copper and cobalt. The recoverable
Jan 1, 1996
-
Monitoring Degradation of Coke within the Blast Furnace via Tuyere Coke SampleBHP Steel International's Newcastle blast. furnaces have operated since their caimissioning on cake based on local low rank coals. In the early 1960's Newcastle coke was believed to be t
Jan 1, 1987
-
The Mineral Composition of the Yerranderie Silver-Lead OresThe silver-lead ores of Yerranderie occur in a series of narrow, flat-dipping lodes in small bodies of quartz porphyry, intrusive into Upper Devonian volcanics, which are exposed in the western flank
Jan 1, 1953
-
Applied Mineralogy of the Suurikuusikko Refractory Gold Deposit, Northern FinlandBy J Leppinen, B Johanson, R Kalapudas, G McMahon
The Suurikuusikko gold deposit was discovered in 1987 in western Finnish Lapland, 54 km NNE from the town centre of KittilS in the volcanic belt of Central Lapland. It is hosted by tholeiitic basalts
Jan 1, 2008