Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Production of a Low Arsenic Copper Concentrate at MMG Rosebery

    By Y Peng, D J. Bradshaw, G Long

    As copper reserves deepen, they are becoming increasingly less pure. Penalty elements such as arsenic, antimony and bismuth are occurring in increasing concentrations. Environmental issues with smelte

    Oct 29, 2012

  • AUSIMM
    Systhesis of Stochastic Recovery Prediction Cut-off Optimisation

    By Vassiliev P

    Cut-off optimisation, based on the work of Lane (1988), can be used to maximise the NPV (Net Present Value) of a mine by the judicious manipulation of cut-offs and the use of stockpiles. Apart from

    Jan 1, 1998

  • AUSIMM
    The Palabora Underground Mine Project

    By P Townsend, F Russell

    Palabora Mining Company operates an integrated open pit mine, concentrator, smelter and refinery complex located in the Northern Province of South Africa. The Palabora open pit went into production in

    Jan 1, 2000

  • AUSIMM
    Low Voidage Blasting to Improve Underground Stope Productivity

    Productivity of mines can be improved by taking fewer, but larger blasts. The initial blasts taken in starting a mining block are restricted by the low amount of void or space to fire into. Block cave

    Jan 1, 2008

  • AUSIMM
    Stratigraphy and Mineralisation of the Upper Paleozoic Rocks, East Nelson

    Permian ultramafic and associated rocks form a belt in East Nelson and contain widespread, but minor, chromite and copper mineralisation and some mining was carried out last century. Since mining ceas

    Jan 1, 1977

  • AUSIMM
    Disclosure - Resource/Reserve Statements - Moving into the Nineties

    The equity market is now very much within a global village environ- ment, with various exchanges acting as agencies for the big casino. In this predicament, mining companies, who provide the most ext

    Jan 1, 1988

  • AUSIMM
    Statutory Compliance of Sealing Plans and Information Required by Queensland Industry Regulators

    Following the Moura No 2 Wardens Court of Inquiry and subsequent changes to the Queensland Mining Legislation there is a requirement in Queensland coal mines for: a person with the recognised competen

    Jan 1, 2005

  • AUSIMM
    Lead-zinc-silver Ore Concentration Practice at the Lead/Zinc Concentrator, Mount Isa Mines Limited, Mount Isa, Queensland

    The LeadtZinc Concentrator at Mount lsa treats all the lead-zinc-silver ore from the Mount Isa Mine and some of the ore from the Hilton Mine. This concentrator was commissioned in June 1966 and total

    Jan 1, 1993

  • AUSIMM
    Current and Future Developments in Truck Haulage Systems for Underground Mines

    The introduction of rubber tyred diesel equipment underground in the early 1960's and subsequent design improvements to diesel haulage systems over the past 2 decades has meant that diesel truck

    Jan 1, 1985

  • AUSIMM
    The Amanda Bel Goldfield: A Significant New Gold Province

    By Plumridge C. L, Lynch J. E, Forresty R. J

    The Amanda Bel Goldfield (new name) is an area of approximately 1000 sq. km centred 65km WSW of Ingham and 150km due east of Kidston (Camel Creek homestead to Ryeburn homestead area). Gold mineral

    Jan 1, 1989

  • AUSIMM
    Fluid-Mineral Relations in the Comstock Lode, Storey, Washoe, and Lyon Counties, Nevada, U.S.A.

    The Comstock Lode, a world-class precious metal vein district near Virginia City in western Nevada, U.S.A. (Fig. 1), produced 8.3 million ounces (0.28 X 106 kg) of gold and 193 million ounces (6.5

    Jan 1, 1987

  • AUSIMM
    Production and Metallurgical Characters of Hollow Mining Drill Steel in Australia

    INDEX OF CONTENTS.1. Historical.2. Manufacture.3. Heat Treatment.4. Fatigue, Failures.5. Consideration of the Establishment o£ a Central Testing or Proving Station.HISTORICAL.Since the introducti

    Jan 1, 1947

  • AUSIMM
    Roadway and Pillar Design Considerations for Development and Longwall Extraction at Central Colliery, Queensland

    By Ward B

    Central Colliery was developed to exploit large underground reserves in the German Creek lease. It was planned from the outset as a retreating longwall operation and is the first longwall mine in

    Jan 1, 1986

  • AUSIMM
    Some Real and Imaginary Examples of Volcanic Hazard and Risk Assessment

    An empirical method of estimating dense rock (D.R.E.) equivalent volumes erupted as airfall tephra, described in a companion paper in this volume, is elaborated, and its accuracy discussed. Estimates

    Jan 1, 1990

  • AUSIMM
    Planning and Installation of the New Underground Winder (No. 2 Hoist) on the Rosebery Mine Inclined Shaft

    This paper traces briefly the reasoning which led to the decision to extend the existing internal shaft at the Rosebery Mine and to instal underground a larger winder (No. 2 Hoist) with capacity to ha

    Jan 1, 1958

  • AUSIMM
    Qualitative and Quantitative Evaluation of Iron Ore Sinters Through Digital Microscopy

    By S Paciornik, G Schinazi, M H. de Pinho Maur-cio, M B. Vieira, O da Fonseca Martins Gomes, D T. Wagner

    Vale (previously CVRD û Companhia Vale do Rio Doce) evaluates the microstructure of sinters in order to understand their characteristics and behaviour in the agglomeration process, and the correlation

    Jan 1, 2008

  • AUSIMM
    The Influence of Using Automated Sample Preparation and Pressed Powder Pellets on Data Quality When Analysing Iron Ore Samples Using X-ray Fluorescence Spectrometry (XRFS) Techniques

    By C B. Valentin

    It is acknowledged that the analysis of iron ores using X-ray fluorescence (XRF) for major and minor elements is best carried out on fusion discs. This method of sample preparation eliminates mineral

    Jan 1, 2007

  • AUSIMM
    Sulfur Isotope Signatures for Orogenic Gold Deposits, Lachlan Orogen, New South Wales

    By P K. Seccombe

    Sulfur isotope data are available for 18 low-sulfide orogenic gold systems hosted by the Lachlan Orogen in eastern New South Wales including those in the northern Hill End Trough (Hargraves, Hill End,

    Jan 1, 2008

  • AUSIMM
    Renewing Rail Guides in a Winding Shaft

    The paper describes the preparation of new rail guides, removing existing rails, and replacing with new rails in a vertical winding shaft.INTRODUCTIONThe general practice in coal winding shafts is the

    Jan 1, 1947

  • AUSIMM
    Considerations for Design of Production Level Drawpoint Layouts for a Deep Block Cave

    By P Bartlett, K Naidoo

    Premier Diamond Mine is planning a new, mechanised, block cave, with a production level approximately 1000 m below surface. A high degree of tunnel damage is expected, due to stress and the relatively

    Jan 1, 2000