Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Concentrating Practice of the Broken Hill South Limited, Broken Hill, New South Wales, AustraliaBy Read T. A
THE Broken Hill South Ltd. is one of ten companies operating on the Broken Hill lode (See Fig. 1). It has two leases-Blocks 7 and 8-of a total length of 2250 ft. on strike of lode.From the surface to
Jan 1, 1921
-
Four-Dimensional Network Relaxation Method for Long-Term Open Pit Mine SchedulingBy J Yamatomi, Y Tamanishi, S Miwa
The four-dimensional (4D) network relaxation method, originally developed by Akaike in 1999, uses Lagrange relaxation and is known for its ability to include the price change and possible better outpu
Sep 26, 2011
-
Risk-Based Ore Selection from Conditionally Simulated Block ModelsBy J E. Everett, F Grobler
This study considers realistic data for a planned open pit iron ore mine, but is applicable to any open pit situation. By interpolating drill hole data, grades are generated for a rectangular block mo
Aug 12, 2013
-
Integrated Site Water Balances and Water Quality Models for Decision-making over Life-of-mineBy R Strand, B Usher
Environmental compliance and mine designs are increasingly including assessment of flows and water qualities as a key driver to decision-making over life-of-mine. Integrated site-wide water quality mo
Jul 16, 2014
-
Geological Controls on Drilling and Blasting OperationsBy T N. Little
This review paper presents an integrated and practical insight to blasting geology and its importance. This approach involves developing blasting objective up front and implementing geology specific b
Nov 8, 2011
-
Thermal analysis of molten salts and their mixtures with metalsBy S Gezgin, F Beckstein, M Müller, D Rapp, D Sergeev, J Qi, A Lichtinger
Salts and their mixtures play an important role for industrial and energy sectors, eg metallurgy, biomass gasification and combustion, nuclear and solar powerplants and electrochemical processes. Depe
Aug 21, 2024
-
Measurement of Residual Shear Strength Using a Modified Direct Shear ApparatusBy L Tatnell, R Mackay, A Tolooiyan
The multi-reversal direct shear test (MRDS) method is commonly used to measure the residual shear strength of soils. However, when the standard direct shear (DS) apparatus is used, the MRDS method is
Nov 5, 2014
-
Geoscan AMSS Leads to Gold Mineralisation at Crossroads, QldBy Honey F. R, Furnell R. G, Lyon R. J P
A Joint Venture between Union Oil Development Corporation and Geoscan Proprietary Limited carried out an Airborne Multispectral Scanner Survey over approximately 15,000 square kilometres in the C
Jan 1, 1989
-
Textural Evaluation of Nickel Sulphide GossansBy Travis G. A
The Mons Cupri Cu-Pb-Zn deposit is situated within a complex Archaean volcanic sequence dominated by rhyolitic fragmental rocks. This sequence is underlain by a 150 m group of rhyolitic ash flow t
Jan 1, 1973
-
Variographic case study for designing, monitoring and optimising industrial measurement systems – the missing link in Lean and Six SigmaBy O Bøckman, E Thisted, K H. Esbensen, U Thisted
Process industry measurement systems, once installed, are often interpreted as static black boxes delivering correct values as long as not proven otherwise. After first implementation and set-up with
May 9, 2017
-
Radar guided blasthole drilling improves product recoveryBy I Mason, M van de Werken, B Zhou, J Hargreaves, W Stasinowsky
A critical step in open cut coal mining is clean removal of the overburden. This is usually achieved by drilling, blasting and digging. A key part of this process being successful is to stop drilling
Sep 1, 2024
-
Geomembranes – from design to handover and some of the lessons learntBy A Marta
Geomembrane (GMB) liners are being used more frequently for the storage or capping of mine waste due to stricter regulatory requirements relating to environmental protection. The longevity of any li
Jul 23, 2018
-
Non-Parametric Bayesian Learning for Resource Estimation in the Autonomous MineBy F Ramos
Conventional techniques for resource estimation generally involve the laborious analysis of variograms and the specification of parameters for covariance functions. In large deposits, construction of
Sep 26, 2011
-
Mine Life Cycle Planning – Creating Lasting Value for CommunitiesBy S Robertson, I Buitrago
Mine life cycle planning and enduring value are taking centre stage to meet corporate goals and deliver socio-economic outcomes for communities over the life of a mine. There is a general agreement in
Jul 16, 2014
-
Characterisation of Gold Ore from the Nick O’Time Shoot (Tarnagulla, Australia) Using High Resolution X-ray Computed TomographyBy I M. Platten, Y Xie, B W. Cuffley, S C. Dominy
"Geometallurgical programs require the collection of representative samples for geochemical, mineralogical and metallurgical test work. Such protocols must be designed to suit the style of orebody in
Jun 15, 2016
-
Solubility of nitrogen and inclusion characteristics in high aluminium steelsBy M M. Pande, M Ishfaq
The effect of aluminium on nitrogen solubility was investigated by equilibrating melt comprising master alloy of Fe-Al with pure electrolytic iron in a controlled atmosphere (pure argon) at 1873 K. Ni
Jun 19, 2024
-
Full-round Numerical Modelling of a Macro Synthetic Fibre Reinforced Tunnel Boring Machine Tunnel in the Shanghai Metro ExtensionBy L Nagy, K P. Juhasz
The authors were engaged to optimise a traditional rebar cage reinforced concrete segmental lining by means of finite element analysis (FEA) using macro synthetic fibres for the Shanghai metro extensi
Sep 17, 2014
-
The Use of Risk Analysis in the Selection of a Mining MethodIt is very rare in the underground hard rock environment to find a deposit that is ideally suited to a specific mining method. Usually the irregular shape of the orebody will allow the deposit to be e
Jan 1, 1998
-
Justification for Integrating Mechanical Sampling with Online AnalysisBy D W. Stevens
Mechanical sampling provides a definitive value for the product sampled but the results are not instantaneous, meaning that decisions on process control can only be made hours after the sample is take
Jul 29, 2014
-
Application of an Integrated Liberation Leach Model for Process OptimisationBy T D. H McGrath, R Byleveld, W P. Staunton, J J. Eksteen
"The Gold Technology Group at Curtin University through the AMIRA P420 series of projects has recently developed the integrated liberation leach model (ILLM) for optimisation of gold plants. The model
Oct 10, 2016