Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Review of Shear Strength Results - Western Australian Gold MinesShear strength testing of rock discontinuity surfaces has been undertaken at a considerable number of open pit gold mining operations in Western Australia, as part of geotechnical studies of pit wall
Jan 1, 1992
-
Environmental Impact of the Imperial Smelting ProcessBy Bishop D. J
The Imperial Smelting Process for the simultaneous production of zinc and lead is probably regarded by the ecologist as a necessary evil with the benefits of its products marginally outweighing the
Jan 1, 1993
-
Paper No. 162. The Refining of Base Bullion at Port Pirie, and Treatment of By-Products.The article, as written, represents a short account of the treatment of the base bullion from the Broken Hill ores, as carried on at Port Pirie, for the recovery of lead, silver, and gold, and for the
Jan 1, 1907
-
A Comparison of Fluid Origins and Compositions in Iron Oxide-copper-gold and Porphyry-Cu (Mo-Au) DepositsBy B Rusk, L Corriveau, P Emsbo, R P. Xavier
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Porphyry-Cu (Mo-Au) deposits and iron oxide-copper-gold (IOCG) deposits are both characteri
Mar 18, 2015
-
The New Lead and Zinc Flotation Sections of the Concentrator of Broken Hill South LimitedIn this paper is given a description of the flotation plant recently erected by Broken Hill South Limited at the South Mine, Broken Hill, N.S.W. It has been built on the site of the old flotation plan
Jan 1, 1935
-
Strategic thinking about long-term ‘above ground’ orebody complexity using scenariosBy T Craske, J Sykes, T C. McCuaig, M Jessell, A Trench
The prevalent strategic approach in the mining industry is one of planning. However, it is widely recognised that planning does not work in complex and uncertain situations (Mintzberg, 1994), such as
Nov 21, 2018
-
Analysis and Adaptability of Belt Filter Presses and Other Technologies for Tailings Dewatering over a Range of Mineral Processes, Plant Designs, Conditions, Regions and Operating PhilosophiesBy M S. Fenzel
Increased environmental regulations and pressures have created changing and new demands for tailings management strategies in a variety of mining applications. Critical among these items is the dispos
Jul 27, 2015
-
Laboratory Studies in Comminution - Part I Rod Versus Ball Milling of Homogeneous MaterialsBy Quast K. B
Samples of limestone and micaceous hematite have been ground in a laboratory batch mill using equal weights of either rods or balls. Values of the Schuhmann distribution modulus, a, have been shown to
Jan 1, 1995
-
Blasting Rock to Suit Stringent Underground Fill RequirementsRecent analysis of backfilling material has shown that a finer size distribution is preferable for stope filling. In order to increase crusher throughput and pit productivity, a reassessment of the
Jan 1, 1995
-
The Geomet Curve – A Model for Implementation of GeometallurgyBy J Vann
Geometallurgy is inherently multidisciplinary and it gains its power to deliver improved outcomes for the minerals industry by bridging silos between disciplines. This cross-disciplinary approach unlo
Sep 5, 2011
-
Achieving Sustainable Community Development - Helping Build Appropriate and Resilient Community Governance StructuresThis paper talks about the experiences of groups we have worked with over the last few years in the Asia-Pacific region (Australia, Canada, New Zealand and Papua New Guinea) and the ways that they hav
Jan 1, 2009
-
Understanding zinc-containing species in basic oxygen steelmaking dustBy B J. Monaghan, R J. Longbottom, D J. Pinson, S J. Chew
Recycling steel plant by-products is a critical issue for achieving both environmental and economic sustainability of integrated steel plants. A key steel plant by-product stream is dust from basic ox
Jun 19, 2024
-
Draw Control Optimisation along the Production Drift in Sublevel Caving MinesBy A Gustafson, G Shekhar, P Boeg-Jensen
The amount of material extracted from each blasted ring in sublevel caving mines is vital when deciding the overall mine production target. The orientation of the production drifts is normally perpend
May 9, 2016
-
The McArthur Lead-Zinc-Silver Deposit (6bbc0ffa-ed17-44c3-ba3c-758c85cd106f)By Jephcott S
The McArthur lead-zinc-silver deposit is of the stratiform type. It consists of a mineralized bituminous shale sequence containing some tuffites, numerous graded beds and isolated slump breccia horizo
Jan 1, 1980
-
Performance and Acceptance Testing of Main Mine Ventilation FansBy D J. Brake
In most underground mines, the ventilation system is a significant portion of the total mine capital and operating cost and the largest consumer of underground electrical power. The effectiveness of t
Jul 1, 2013
-
An Investigation into the Effectiveness of Under Platform Exhaust Systems Based on Measurements from the Copenhagen MetroBy S Ravn
Under platform exhaust (UPE) systems are often designed into metro stations as a means of removing heat generated by trains as they come to a halt in the platform. These systems are designed to extrac
Mar 8, 2011
-
Flow Loop Testing of Different Paste Mixtures at Neves Corvo Mine, PortugalBy M Byrne, P Newman, M Lindqvist
SomincorÆs Neves Corvo Mine, one of the largest copper producers in Europe, is currently constructing a paste backfill plant in order to replace cemented rockfill in its bench and fill stopes and poss
Jan 1, 1998
-
Design of Grade Control Sampling Programs for Underground Gold MinesBy S C. Dominy
Grade control programs aim to deliver economic tonnes to the mill via accurate definition of ore and waste. The foundation of a successful program is high quality sampling supported by geology and a s
Aug 22, 2011
-
Wall Control Blasting Practices at BHP Billiton Iron Ore Mt WhalebackBy C T. Dunbar, P A. Walker, G E. LeJuge
A programme of blast improvement was initiated at the Mt Whaleback iron ore mine by BHPIO management in early-1998. One component of that work was the need to improve wall control blasting practices t
Jan 1, 2001
-
Elevating geotechnical considerations in the Australian underground coal industry and mine planning processBy T Stambolie
Mine planning processes are continuously evolving, increasing in complexity, and are required to be developed in shorter timeframes, often missing important steps in the process. Underground coal mine
Nov 30, 2018