Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geometallurgical Guidelines for Miners, Geologists and Process Engineers - Discovery to Design

    By D David

    Geometallurgy is often a misunderstood and poorly defined concept. The first thing the paper will attempt is to provide a definition of geometallurgy. Ultimately this paper has been written to provide

    Sep 29, 2013

  • AUSIMM
    Profitable and Productive Partnerships ù Optimising Coal Recovery in Close Proximity to the Hunter River

    By D Stacey, J Matthews

    Hunter Valley Operations in partnership with Orica Explosives designed a process to optimise coal extraction at depths greater than 65 m below the Hunter River in a safe and cost effective manner. The

    Jan 1, 2001

  • AUSIMM
    Process modelling and high-throughput thermochemical calculations using ChemApp for Python

    By F Tang, Ö K. Büyükuslu, M Baben, S Petersen

    GTT-Technologies’ ChemApp for Python was developed to provide a powerful, easy to use interface to ChemApp for a programming language highly popular with scientists and engineers. It is used, for inst

    Jun 19, 2024

  • AUSIMM
    Scientific Evaluation of Fauna Sensitivity to Blasting

    By D Martin

    The Rio Tinto (Mount Bruce Mining Pty Ltd) Koodaideri Iron Ore Project is located approximately 110 km north-west of Newman in the Pilbara region of Western Australia. During detailed ecological studi

    Aug 24, 2015

  • AUSIMM
    The use of Geometallurgical Relationships in Process Route Selection and Mine Plan Optimisation for the Dutwa Nickel Project

    By C Czerny, T Elkington, L Lorenzen

    The Dutwa Nickel Project is a nickel laterite atmospheric leach project located in Tanzania that has been under development by African Eagle Resources plc (2012). A bankable feasibility study (BFS) ha

    Sep 29, 2013

  • AUSIMM
    Geotechnical Reporting at Olympic Dam Mine

    The need for formalised geotechnical reporting has not been fully explored at many operations. With the continuing need to provide safer and more efficient workplaces, the requirement for good geotech

    Jan 1, 2004

  • AUSIMM
    The Development of the Aircore Sampling System

    By J M. Wallis

    Heavy mineral sand exploration drilling prior to the 1970s generally utilised open hole auger and air-blast type drilling. However, mining reconciliations were poor and limitations on accuracy and pre

    Oct 5, 2011

  • AUSIMM
    Experimental study and thermodynamic modelling of phase equilibria in the FeO-FeO1.5-SbO1.5-SiO2 system in equilibrium with metal

    By C Zschiesche, alam, A Abadias Llamas, A K

    An integrated experimental and thermodynamic modelling study of the phase equilibria in the FeOFeO1.5- SbO1.5-SiO2 system in equilibrium with liquid Sb and Sb-Ag metal has been undertaken to develop t

    Jun 17, 2024

  • AUSIMM
    Underground Mining at the Cadjebut Joint Venture

    By McGuckin P. H

    The Cadjebut orebody is a MississippiValleyType (MVT) zinc-lead deposit, and is located approximately 80 km southeast of Fitzroy Crossing in the Kimberley region of Western Australia. It is one of fiv

    Jan 1, 1992

  • AUSIMM
    Case studies illustrating the role of F-series mine reconciliations in production forecast improvement initiatives

    By S J. Loach

    F-Series reconciliations are formal comparisons of estimates and measurements of ore quantity and quality made at pre-determined points along the mining value chain. F1 is the ratio of ‘Depleted Grade

    Sep 18, 2023

  • AUSIMM
    Integrated Resource Asset Management - A Holistic Approach to Information Technology in Mining Operations

    Over the last ten years geological and mining software products have evolved greatly. Software companies developing such products have focussed almost exclusively on the development of technical aspec

    Jan 1, 1999

  • AUSIMM
    Caijiaying Dry Tailings Storage

    By R Jia, J T. Waldram

    "The Caijiaying lead zinc mine is located in China, north-west of Beijing, in Hebei Province. The region experiences severe winters, below -35°C, and warm summers, up to 30°C. The mine and con

    Oct 10, 2016

  • AUSIMM
    Technological Characterisation of West African Iron Ores in Order to Predict their Performance in the Beneficiation Process

    By L Dubron

    This study details a mineralogical and textural characterisation of West African iron ores with an emphasis on their behaviour during mineral processing. By means of both qualitative and quantitative

    Jul 11, 2011

  • AUSIMM
    Automated joint mapping using the concentric shells algorithm

    By P Valenzuela

    Joint mapping is a fundamental input for rock mass characterisation and slope stability analysis. The usual way to do it is using a compass in the field or digitising structures on a screen, with a so

    Sep 20, 2017

  • AUSIMM
    From errors to uncertainty – a clarification for proper use by the Theory of Sampling

    By F F. Pitard

    Observation from attending many conferences around the world reveals that many people are constantly shifting from the word ‘error’ to the word ‘uncertainty’ without a clear vision of what the subtle

    May 9, 2017

  • AUSIMM
    Discrete Fracture Network Modelling – Importance of Accounting for Data Uncertainty and Variability

    By S Rogers, D Stead, E Eberhardt

    The last decade has seen a major increase in use of the discrete fracture network (DFN) approach applied to cave mining problems, often integrated within more complex geomechanical simulations. Becaus

    May 9, 2016

  • AUSIMM
    New Life for the Argyle Diamond Mine – Block Cave Style and Beyond

    By D C. Ford

    The Argyle AK1 orebody was discovered in 1979 and subsequently found to be a large, economically viable reserve with high grade diamondiferous ore. Production began via an open pit operation

    Aug 22, 2011

  • AUSIMM
    A Predictive Model for Beneficial Use of Rehabilitated Mine Tailings for Grazing Cattle after Mine Closure

    By B N. Noller, J C. Ng, S L. Bruce

    Mining activities can result in the transfer of harmful elements, including arsenic and lead, into the environment. In Australia, one of the potential future uses of rehabilitated mine land is to stoc

    Jul 16, 2014

  • AUSIMM
    An Approach to High Solids Slurry Pipeline Design

    By M Griffiths

    This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she

    Aug 8, 2011

  • AUSIMM
    Rewriting the rule book – geology organisational design

    By T McLeod, B Catto

    AngloGold Ashanti Australia’s (AGAA) Tropicana gold mine (TGM) geology department seized the rare opportunity of building a new geology department for a new operation: the philosophy, the people and t

    Sep 20, 2017