Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A methodology for assessing stope design modifying factors for the Olympic Dam Mine

    By S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant

    The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order

    Mar 15, 2021

  • AUSIMM
    Methodology development of electrical conductivity measurements for non-ferrous slags

    By L Scheunis, A Van den Bulck, E Jak, K Verbeken, M Shevchenko, R Starykh, I Bellemans, P-J Boeykens

    As a result of the globally increasing consumer use of electronic devices, it is expected that pressure will increase on the supply chain of precious metals. Hence, recycling of these electronics beco

    Jun 19, 2024

  • AUSIMM
    Paper No. 158. Presidential Address. Ore Treatment at The Broken Hill Proprietary Mine.

    The treatment of the Broken Hill ores has,undergone many changes during the last ten years, and it may be of interest to some of the members to know what are the main lines on which the Proprietary Mi

    Jan 1, 1907

  • AUSIMM
    Environmental Impact Modelling for In Situ Leaching of Uranium

    By A Roshal

    It is anticipated that many future uranium mines in Australia will be using the in situ leaching mining process. It is fair to say that close to one third of uranium production will be generated by th

    Jan 1, 2008

  • AUSIMM
    Understanding and modelling squeezing ground conditions at the Ballarat Gold Mine

    By B Roache, A Vakili, R Talebi

    When a highly anisotropic or weak rock mass is subjected to high-stress conditions, it can lead to large ongoing deformations or squeezing ground conditions. Squeezing ground conditions can impose inc

    Nov 30, 2018

  • AUSIMM
    Precast Concrete Segmental Tunnel Linings – The State-of-the-art

    By A Harding, M Chappell

    Precast concrete segmental linings have enjoyed widespread use around the world, and are the lining type of choice for tunnels constructed using a shielded tunnel boring machine. However, there is sig

    Sep 17, 2014

  • AUSIMM
    Optimisation of the Prominent Hill Flotation Circuit

    By P Woodward, T Ly, N Muhamad

    OZ Minerals' Prominent Hill copper-gold concentrator is located 650 km north-west of Adelaide in the Gawler Craton of South Australia. The concentrator was built in 2008 and commenced commercial

    Jul 15, 2013

  • AUSIMM
    Back analysis of pit slope performance in a saturated alluvial sediment

    By J Player, G Sweby

    The material properties and hence performance of saturated alluvial sediments slope can be incorrectly forecast if the water content is not preserved, and materials properties not correctly determined

    Jun 22, 2022

  • AUSIMM
    Project Management for All Seasons ù Financial Risk Mitigation in a Challenging World

    By O C. Aitken

    Mining project developers are committed to taking on all the challenges and obligations of financial risk management. It is interesting that our current models of project finance have not changed mark

    Jan 1, 2004

  • AUSIMM
    Winning the Safety Battle

    By S Hanrahan, S McLaughlin

    A case study is presented that details the safety journey at a North American project involving two major contracts: a 1000 m shaft recovery and rehabilitation, and the development of a drainage galle

    Jun 22, 2016

  • AUSIMM
    Megathrusts, Megavalving and Mineralisation – Perturbation of Hydrothermal and Magmatic Flow Systems by Subduction Thrust Ruptures

    By R H. Sibson

    Magmatic and/or hydrothermal fluid systems in island or mountain arcs self-organise to critical states subject to perturbation by changes in the regional stress, which plays a controlling role in the

    Aug 22, 2011

  • AUSIMM
    Leading safely doesn’t only mean leading safety

    By A G. Guinea

    Every person in an organisation has what could be called ‘a different take’ on what it means to be a safety leader. The directors will tell you they are ultimately responsible for everyone’s safety an

    May 5, 2022

  • AUSIMM
    Removing some Subjectivity from Traditional BS 848 and ISO 5802 In Situ Fan Flow Tests

    Traditional in situ fan flow test methods under accepted standards require determinations to be made of both static pressures and total pressures during testing. This is to determine the resultant vel

    Jul 1, 2013

  • AUSIMM
    Reduction in Diesel Particulate Matter at Oaky North

    By A Melloy, D Holt, M Jurak

    Oaky North is AustraliaÆs highest producing underground coal mine. In 2011, the mine produced 8.7 Mt of high-quality coking coal. The high quantities are a result of the constant strive for optimising

    Jul 1, 2013

  • AUSIMM
    Diamond drilling at Efemçukuru gold mine, Turkey – a case study on the benefits of timely and cost-effective drilling to short-term planning

    By M Ozkayhan, N Arslan

    "The Efemçukuru underground mine in western Turkey is an intermediate sulfidation, epithermal gold deposit. The bulk of the mineral resources and all of the mineral reserves lie within the Kestanebele

    Sep 20, 2017

  • AUSIMM
    Reconciliation of Orebody Model Predictions – System and People

    By T Burns, P Savory

    In 2013, Rio Tinto Iron Ore (RTIO) produced 251 Mt from 15 mines in Western Australia. Throughout the mines, Ore Reserve models are used for long-term and medium-term mine planning. Grade control data

    Aug 18, 2014

  • AUSIMM
    Managing remediation, and risk of failure, to complete extraction of a short life open pit

    By C E. Woolley, A Hosseini, J Foster

    Northern Star’s Thunderbox Open Pit C-Zone cutback was designed to maximise extraction in a short life excavation; In fresh rock on the western wall this included 20 m to 30 m bench heights with 6.5 m

    Jun 22, 2022

  • AUSIMM
    Implementing condition-based wear surface management

    By P Velletri, N Gaylard

    The management of wear surfaces in mining operations has remained largely unchanged since the inception of mining. Sacrificial wear liners are installed on the inside of chutes, hoppers and other equi

    Nov 8, 2021

  • AUSIMM
    Oxygen Demand Testing ù A New Laboratory Procedure

    By S Brown

    With oxygen conditioning routinely used in both the lead and zinc circuits at Pasminco Elura Mine a more sophisticated method of determining oxygen demand was required. It is known that different ore

    Jan 1, 2000

  • AUSIMM
    Characterisation of Gravity Amenable Gold Ores – Sample Representivity and Determination Methods

    By S C. Dominy

    Gravity amenable gold ores are those that after comminution produce liberated particles, composites and/or carriers that can be recovered by gravity separation means. Recovery depends upon mineralisat

    Sep 5, 2011