Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A methodology for assessing stope design modifying factors for the Olympic Dam MineBy S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant
The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order
Mar 15, 2021
-
Methodology development of electrical conductivity measurements for non-ferrous slagsBy L Scheunis, A Van den Bulck, E Jak, K Verbeken, M Shevchenko, R Starykh, I Bellemans, P-J Boeykens
As a result of the globally increasing consumer use of electronic devices, it is expected that pressure will increase on the supply chain of precious metals. Hence, recycling of these electronics beco
Jun 19, 2024
-
Paper No. 158. Presidential Address. Ore Treatment at The Broken Hill Proprietary Mine.The treatment of the Broken Hill ores has,undergone many changes during the last ten years, and it may be of interest to some of the members to know what are the main lines on which the Proprietary Mi
Jan 1, 1907
-
Environmental Impact Modelling for In Situ Leaching of UraniumBy A Roshal
It is anticipated that many future uranium mines in Australia will be using the in situ leaching mining process. It is fair to say that close to one third of uranium production will be generated by th
Jan 1, 2008
-
Understanding and modelling squeezing ground conditions at the Ballarat Gold MineBy B Roache, A Vakili, R Talebi
When a highly anisotropic or weak rock mass is subjected to high-stress conditions, it can lead to large ongoing deformations or squeezing ground conditions. Squeezing ground conditions can impose inc
Nov 30, 2018
-
Precast Concrete Segmental Tunnel Linings – The State-of-the-artBy A Harding, M Chappell
Precast concrete segmental linings have enjoyed widespread use around the world, and are the lining type of choice for tunnels constructed using a shielded tunnel boring machine. However, there is sig
Sep 17, 2014
-
Optimisation of the Prominent Hill Flotation CircuitBy P Woodward, T Ly, N Muhamad
OZ Minerals' Prominent Hill copper-gold concentrator is located 650 km north-west of Adelaide in the Gawler Craton of South Australia. The concentrator was built in 2008 and commenced commercial
Jul 15, 2013
-
Back analysis of pit slope performance in a saturated alluvial sedimentBy J Player, G Sweby
The material properties and hence performance of saturated alluvial sediments slope can be incorrectly forecast if the water content is not preserved, and materials properties not correctly determined
Jun 22, 2022
-
Project Management for All Seasons ù Financial Risk Mitigation in a Challenging WorldBy O C. Aitken
Mining project developers are committed to taking on all the challenges and obligations of financial risk management. It is interesting that our current models of project finance have not changed mark
Jan 1, 2004
-
Winning the Safety BattleBy S Hanrahan, S McLaughlin
A case study is presented that details the safety journey at a North American project involving two major contracts: a 1000 m shaft recovery and rehabilitation, and the development of a drainage galle
Jun 22, 2016
-
Megathrusts, Megavalving and Mineralisation – Perturbation of Hydrothermal and Magmatic Flow Systems by Subduction Thrust RupturesBy R H. Sibson
Magmatic and/or hydrothermal fluid systems in island or mountain arcs self-organise to critical states subject to perturbation by changes in the regional stress, which plays a controlling role in the
Aug 22, 2011
-
Leading safely doesn’t only mean leading safetyBy A G. Guinea
Every person in an organisation has what could be called ‘a different take’ on what it means to be a safety leader. The directors will tell you they are ultimately responsible for everyone’s safety an
May 5, 2022
-
Removing some Subjectivity from Traditional BS 848 and ISO 5802 In Situ Fan Flow TestsTraditional in situ fan flow test methods under accepted standards require determinations to be made of both static pressures and total pressures during testing. This is to determine the resultant vel
Jul 1, 2013
-
Reduction in Diesel Particulate Matter at Oaky NorthBy A Melloy, D Holt, M Jurak
Oaky North is AustraliaÆs highest producing underground coal mine. In 2011, the mine produced 8.7 Mt of high-quality coking coal. The high quantities are a result of the constant strive for optimising
Jul 1, 2013
-
Diamond drilling at Efemçukuru gold mine, Turkey – a case study on the benefits of timely and cost-effective drilling to short-term planningBy M Ozkayhan, N Arslan
"The Efemçukuru underground mine in western Turkey is an intermediate sulfidation, epithermal gold deposit. The bulk of the mineral resources and all of the mineral reserves lie within the Kestanebele
Sep 20, 2017
-
Reconciliation of Orebody Model Predictions – System and PeopleBy T Burns, P Savory
In 2013, Rio Tinto Iron Ore (RTIO) produced 251 Mt from 15 mines in Western Australia. Throughout the mines, Ore Reserve models are used for long-term and medium-term mine planning. Grade control data
Aug 18, 2014
-
Managing remediation, and risk of failure, to complete extraction of a short life open pitBy C E. Woolley, A Hosseini, J Foster
Northern Star’s Thunderbox Open Pit C-Zone cutback was designed to maximise extraction in a short life excavation; In fresh rock on the western wall this included 20 m to 30 m bench heights with 6.5 m
Jun 22, 2022
-
Implementing condition-based wear surface managementBy P Velletri, N Gaylard
The management of wear surfaces in mining operations has remained largely unchanged since the inception of mining. Sacrificial wear liners are installed on the inside of chutes, hoppers and other equi
Nov 8, 2021
-
Oxygen Demand Testing ù A New Laboratory ProcedureBy S Brown
With oxygen conditioning routinely used in both the lead and zinc circuits at Pasminco Elura Mine a more sophisticated method of determining oxygen demand was required. It is known that different ore
Jan 1, 2000
-
Characterisation of Gravity Amenable Gold Ores – Sample Representivity and Determination MethodsBy S C. Dominy
Gravity amenable gold ores are those that after comminution produce liberated particles, composites and/or carriers that can be recovered by gravity separation means. Recovery depends upon mineralisat
Sep 5, 2011